  600   Sat Jun 8 06:13:21 2024 CBRun 47/48/49 - target issues & tests07:00

After putting the target back,
we observe strong periodic (5 s) fluctuations
 Screenshot_from_2024-06-08_07-15-27.pngScreenshot_from_2024-06-08_07-15-33.pngScreenshot_from_2024-06-08_10-13-16.pngScreenshot_from_2024-06-08_10-13-23.pngScreenshot_from_2024-06-08_10-13-26.png 
  599   Sat Jun 8 00:14:39 2024 LBRun 46 - background with beamRUN 46- started at 00:50

Horizontal beam position = 4.0
mm, vertical beam position = -5.0 mm.
 22x 
  598   Fri Jun 7 22:33:13 2024 LBRun 45 - tests on beam-target overlapTried to double check beam-target overlap
by changing beam horizontal coordinate.

In the tablethe counts in the 4000-5200
 Screenshot_from_2024-06-07_23-11-06.pngScreenshot_from_2024-06-07_23-12-17.pngScreenshot_from_2024-06-07_23-32-22.pngScreenshot_from_2024-06-07_23-43-43.pngScreenshot_from_2024-06-07_23-50-54.png 
  597   Fri Jun 7 15:53:35 2024 TDDSSD leakage current increase - temperature increase in CRYRING hallRe-increase in DSSSD leakage current c.
14-15.00 6.6.24 

There was a significant temperature
 Capture.PNG 
  596   Fri Jun 7 14:09:04 2024 JM, CB, DR, CN, LBRun 44 - 15N Data Taking15:35

Electron cooler voltage set point
= 244.3 V
  
  595   Fri Jun 7 10:05:40 2024 CBRun 41/42/43 - 15N data taking start11:05

Confirmed overlap is at 4 mm under
new settings.
 8x 
  594   Thu Jun 6 16:23:10 2024 LB CB JMRun 39 - Run 40 15NStarted run 39.

 

We have the 15N+ beam with 426
 15x 
  593   Thu Jun 6 05:44:45 2024 DR YL DB LB CB JMRun 38 - 15N Tests06:45

All system checks OK

Target density 3.4e11
 8x 
  592   Wed Jun 5 13:34:02 2024 JMRun 37 - Change in thresholds14:20

Target nozzle currently being replaced.
No beam
 Screenshot_from_2024-06-05_14-36-44.png 
  591   Wed Jun 5 13:21:45 2024 JM, CBRun 36 - pulser walkthrough14:00

Access to the cave as Nikos and
Andreas have begun work on the target.
 Screenshot_from_2024-06-05_14-20-18.pngScreenshot_from_2024-06-05_14-21-26.pngScreenshot_from_2024-06-05_14-27-43.pngScreenshot_from_2024-06-05_14-25-44.png 
  590   Wed Jun 5 08:34:04 2024 JM. DB, PCTarget nozzle change09:30

Target density has not improved
despite efforts last night. Mid 10 - low
  
  589   Tue Jun 4 19:19:26 2024 TD[How To] Recover DAQ when one FEE64 stops sending data1) STOP DAQ [workspace 2, display 1, browser
tab 'Run Control']
   all FEE64s should change status from 'going'
  
  588   Tue Jun 4 18:08:04 2024 Boudefla Dounia - CB - LB - SDRun 3419:08

Beam energy = 3 MeV.

Horizontal beam position = 4.0
 19x 
  587   Tue Jun 4 15:25:36 2024 BD US CBRun 3316:26

Merger OK, Tape server OK

ADC data item statistics looks
 Screenshot_from_2024-06-04_18-33-23.pngScreenshot_from_2024-06-04_18-33-38.pngScreenshot_from_2024-06-04_18-35-26.pngScreenshot_from_2024-06-04_18-36-55.png 
  586   Tue Jun 4 14:13:17 2024 JM, CB, DB, USRun 32- beam only background15:15

Run 32 started - Beam, no target

Beam energy = 3 MeV.
  
  585   Tue Jun 4 06:56:02 2024 DFF, PC, LB, JM,NP,ABRun 31 contd8:13

Since 6:40 the target density dramatically
dropped to 10^9 since then it has been unstable
 Screenshot_from_2024-06-04_10-53-58.pngScreenshot_from_2024-06-04_10-58-02.png 
  584   Tue Jun 4 00:04:39 2024 DR, EHRun 31Beam energy = 3 MeV

Horizontal beam position = 4.0
mm, vertical beam position = 0.0 mm.
  
  583   Mon Jun 3 21:37:20 2024 CN, EM, CBRun30Beam energy = 3 MeV

Horizontal beam position = 7.0
mm, vertical beam position = 0.0 mm.
 Screenshot_from_2024-06-03_23-15-37.pngScreenshot_from_2024-06-03_23-16-18.pngScreenshot_from_2024-06-03_23-17-16.png 
  582   Mon Jun 3 15:17:41 2024 CN, EM, CBRun29 16:15

In the previous run while working
on the target it was discovered that the
 Screenshot_from_2024-06-03_18-04-47.pngScreenshot_from_2024-06-03_18-05-11.pngScreenshot_from_2024-06-03_18-06-09.pngScreenshot_from_2024-06-03_18-06-40.pngScreenshot_from_2024-06-03_20-35-00.png 
  581   Mon Jun 3 15:10:12 2024 CN, EM, CBRun2816:10

We start a new run after doing
some test with the motor. Injection time
 Screenshot_from_2024-06-03_16-12-44.pngScreenshot_from_2024-06-03_16-13-11.pngScreenshot_from_2024-06-03_16-14-11.pngScreenshot_from_2024-06-03_16-16-37.png 