592
|
Wed Jun 5 13:34:02 2024 |
JM | Run 37 - Change in thresholds |
14:20
Target nozzle currently being replaced. No beam
We have decided to switch to 15N beam from now on.
Beam energy for 15N is significantly higher than deuteron beam so we have increased the thresholds (slow comparator) slightly for all detectors to 500 keV (0x32).
ADC data item rates - attachment 1
Run 37 started. Alpha background
Data rate ~ 200 kb/sec
17:44
All system checks OK
20:00
All system checks OK
23:30
All system checks OK
01:25
All system checks OK
03:25
All system checks OK.
Target is stable at 3.5e11, with T1=29 K
05:30
All system checks OK
Target density has slowly drifted down, and is now 1.2e11 |
Attachment 1: Screenshot_from_2024-06-05_14-36-44.png
|
|
591
|
Wed Jun 5 13:21:45 2024 |
JM, CB | Run 36 - pulser walkthrough |
14:00
Access to the cave as Nikos and Andreas have begun work on the target.
Run 36 started - pulser walkthrough.
Pulser amplitudes of 8, 7, 6, 5, 4, 3, 2, 1
Attachment 1 - pn channels
Attachment 2 - nn channels
Attachment 3 - pn channels (zoom)
Attachment 4 - nn channels (zoom)
Best pn channel looks like AIDA09 - pulser width 63
Worst pn channel looks like AIDA14 - pulser width 148
Best nn channel looks like AIDA12 - pulser width 58
Worst nn channel looks like AIDA16 - pulser width 246
This is approximately the same as pulser widths before the beam time. |
Attachment 1: Screenshot_from_2024-06-05_14-20-18.png
|
|
Attachment 2: Screenshot_from_2024-06-05_14-21-26.png
|
|
Attachment 3: Screenshot_from_2024-06-05_14-27-43.png
|
|
Attachment 4: Screenshot_from_2024-06-05_14-25-44.png
|
|
590
|
Wed Jun 5 08:34:04 2024 |
JM. DB, PC | Target nozzle change |
09:30
Target density has not improved despite efforts last night. Mid 10 - low 11 density range. We will try to change the nozzle.
Target nozzle moved to the out position.
HKR allowed access to the cave to turn the compressor off. Target nozzle now warming up.
Internal cave work on changing nozzle expected to start at ~11. In the meantime we will let Wolfgang experiment with the beam settings to try to improve injection intensity.
Detectors have been moved out to fully out position
Run 35 started. |
589
|
Tue Jun 4 19:19:26 2024 |
TD | [How To] Recover DAQ when one FEE64 stops sending data |
1) STOP DAQ [workspace 2, display 1, browser tab 'Run Control']
all FEE64s should change status from 'going' to 'stopped' *except* whichever FEE64(s) have a problem - typically their status is 'going' or 'error'
2) Restart Merger by selecting the Merger icon [workspace 3, display 2]
terminal window showing the startup will popup
3) Setup Merger by selecting 'SETUP' [workspace 3, display 1, browser tab 'NewMerger Control']
4) Start Merger by selecting 'GO' [workspace 3, display 1, browser tab 'NewMerger Control']
all data links will be inactive (red)
5) Disable data transfer by selecting 'Data transfer Disable #1 all' [workspace 2, display 1, browser tab 'Run Control']
6) Start DAQ
Start DAQ by selecting 'GO' [workspace 2, display 1, browser tab 'Run Control']
check that DAQ is *actually* going - if not repeat 'GO'
7) Check WR timestamps by selecting 'Collect all timestamps' [workspace 2, display 1, browser tab 'GSI White Rabbit Control']
readout times will be displayed for each FEE64
check that the readout times are monotonically increasing as you read down the list of readout times - if not, contact expert support
8) Stop DAQ
Start DAQ by selecting 'STOP' [workspace 2, display 1, browser tab 'Run Control']
check that DAQ has *actually* stopped - if not repeat 'STOP
9) Enable data transfer to Merger and TapeServer and start DAQ
Enable data transfer by selecting 'Enable data transfer Enable #1 All' [workspace 2, display 1, browser tab 'Run Control']
Start DAQ by selecting 'GO' [workspace 2, display 1, browser tab 'Run Control']
check that DAQ is *actually* going - if not repeat 'GO'
10) Check data is being transferred to Merger and TapeServer
Select 'Reload' [workspace 3, display 1, browser tab 'NewMerger Control']
you should see a non-zero 'current merged data rate' and all links should show as green at least some of the time (requires observation over several reloads)
Select 'Reload' [workspace 3, display 1, browser tab 'TapeServer']
you should see 'Blocks written' and 'kb written' counters increase
11) Check AIDA data is being forwarded from the TapeServer to MBS [workspace 3, display 2, command terminal]
12) Restart should now have been successfully completed. Please inform the 'on shift' crew' that AIDA is forwarding data.
If not, please request expert assistance. |
588
|
Tue Jun 4 18:08:04 2024 |
Boudefla Dounia - CB - LB - SD | Run 34 |
19:08
Beam energy = 3 MeV.
Horizontal beam position = 4.0 mm, vertical beam position = 0.0 mm.
Target density ~ fluctuating
Beam intensity at inj ~ 1.7e7
Detectors are positioned IN. Left arm = 36.54, right arm = 64.60 mm
MBS signals saved from motors code
Histograms and stats zero'd, monitoring code restarted.
Beam in the ring ~ 6 minutes.
Pressure in YR09 E target ~ 4.36e-11 mbar.
Merger error recovered
White rabbit time stamps
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
21:27
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
23:00
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
Statistics attachment 5
Merger attachment 6
00:42
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
Density is oscillating between E10 and low E11.
attachment 7 is statistics, attachment 8 is temperature, attachment 9 is merger, attachment 10 is spectrum browser.
02:20
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
Density is oscillating between E10 and low E11. ( last 15 minutes below 2E10)
attachment 11 -13
From 2:00 target density falls below 2E10 and started decreasing to the E9 range. At 2:40 we started playing with x-y to get to higher density. At 3:30 we are at 5/6E10 and waiting to see if it stabilizesto that or if it needs more playing.
04:06
Target density being 1-2E11 since 5 minutes
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
Attachment 14 statistics, attachment 15 merger
05;53
Target density 1E10, sometimes e11, before going down to low E10 and we need to play a bit with x-y to recover it
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
Attachment 16-18
07:35
Target density 2.5E11, after changiny y position to 1000
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
09:00
Target density has not improved despite efforts last night. Mid 10 - low 11 density range. We have asked HKR to remove beam from the ring and allow access so Nikos can change the nozzle.
Beam off now, access granted. Will begin warming nozzle. Internal cave work on changing nozzle expected to start at 11
Run stopped.
Final monitoring code histogram attached
|
Attachment 1: Screenshot_from_2024-06-04_19-07-40.png
|
|
Attachment 2: Screenshot_from_2024-06-04_19-11-14.png
|
|
Attachment 3: Screenshot_from_2024-06-04_21-26-45.png
|
|
Attachment 4: Screenshot_from_2024-06-04_21-26-50.png
|
|
Attachment 5: Screenshot_from_2024-06-04_22-40-39.png
|
|
Attachment 6: Screenshot_from_2024-06-04_22-43-21.png
|
|
Attachment 7: Screenshot_from_2024-06-05_00-44-49.png
|
|
Attachment 8: Screenshot_from_2024-06-05_00-45-21.png
|
|
Attachment 9: Screenshot_from_2024-06-05_00-45-41.png
|
|
Attachment 10: Screenshot_from_2024-06-05_00-47-33.png
|
|
Attachment 11: Screenshot_from_2024-06-05_02-21-37.png
|
|
Attachment 12: Screenshot_from_2024-06-05_02-22-15.png
|
|
Attachment 13: Screenshot_from_2024-06-05_02-22-44.png
|
|
Attachment 14: Screenshot_from_2024-06-05_04-06-59.png
|
|
Attachment 15: Screenshot_from_2024-06-05_04-07-43.png
|
|
Attachment 16: Screenshot_from_2024-06-05_05-55-15.png
|
|
Attachment 17: Screenshot_from_2024-06-05_05-55-49.png
|
|
Attachment 18: Screenshot_from_2024-06-05_05-56-34.png
|
|
Attachment 19: Screenshot_from_2024-06-05_09-04-45.png
|
|
587
|
Tue Jun 4 15:25:36 2024 |
BD US CB | Run 33 |
16:26
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
Nicos came in to optimize target density.
18:39
aida02 in the MERGER aka aida03 elsewhere has a red background, but still appears to be transferring data. Rates are fine. Temps are fine. System wide checks unchanged.
See attachments. Checkloaded x2 - no difference. Unclear what the issue is. |
Attachment 1: Screenshot_from_2024-06-04_18-33-23.png
|
|
Attachment 2: Screenshot_from_2024-06-04_18-33-38.png
|
|
Attachment 3: Screenshot_from_2024-06-04_18-35-26.png
|
|
Attachment 4: Screenshot_from_2024-06-04_18-36-55.png
|
|
586
|
Tue Jun 4 14:13:17 2024 |
JM, CB, DB, US | Run 32- beam only background |
15:15
Run 32 started - Beam, no target
Beam energy = 3 MeV.
Horizontal beam position = 4.0 mm, vertical beam position = 0.0 mm.
Beam intensity at inj ~ 2.5e7
Detectors are positioned IN. Left arm = 36.54, right arm = 64.60 mm
Histograms and stats zero'd, monitoring code restarted.
Beam in the ring ~ 5 minutes.
Pressure in YR09 E target ~ 4.5e-11 mbar.
Motors code crashed. Beam removed from ring to re-home detectors.
15:20
Beam in the ring again, detectors homed, no target
Detectors have been set up to send signals on injection / dump
15:35
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
|
585
|
Tue Jun 4 06:56:02 2024 |
DFF, PC, LB, JM,NP,AB | Run 31 contd |
8:13
Since 6:40 the target density dramatically dropped to 10^9 since then it has been unstable and did not recover. Currently it is around 8e8.
09:00
Target density has been increased to the high -10, very low -11 region. We will keep this run going unless the density is increased further.
10:21
Beam energy = 3 MeV.
Horizontal beam position = 4.0 mm, vertical beam position = 0.0 mm.
Target density ~ 1e9 at/cm2 (no target, get lost quite quckly)
Beam intensity at inj ~ 1.7e7
Detectors are positioned IN. Left arm = 36.54, right arm = 64.60 mm
Histograms and stats zero'd, monitoring code restarted.
Beam in the ring ~ 6 minutes.
Pressure in YR09 E target ~ 4.36e-11 mbar.
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
target density has been fluctuating between E9 to E12. We can very clearly see the increase in elastic counts on our detector during high density periods.
Attachment 1 - rate plots at 1E12 at/cm2
Attachment 2 - rate plots at 1E9 at/cm2
12:26
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
After reaching a density of > 10^12 a bit before 11:00, the valve got closed. When a valve is closed, can be observed a dramatic change in the plot and one of the three green ligths of atps7vaccrz1 (0,2,4) is turned off. Nikos opened it, and now it seems stable again around 1e11.
14:07
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
15:05
Run stopped as target density is rubbish. Might as well get beam background |
Attachment 1: Screenshot_from_2024-06-04_10-53-58.png
|
|
Attachment 2: Screenshot_from_2024-06-04_10-58-02.png
|
|
584
|
Tue Jun 4 00:04:39 2024 |
DR, EH | Run 31 |
Beam energy = 3 MeV
Horizontal beam position = 4.0 mm, vertical beam position = 0.0 mm.
Beam intensity at inj ~ 2.5e7
Detectors are positioned IN. Left arm = 36.54, right arm = 64.60 mm
Cycle time ~ 6 minutes
01:05
Target density still very unstable
02:45
Target density has dropped to ~1e9 and has been at that level for 30 minutes. We will try to move the target a bit and see if we can get an increase. Target position is currently x=-12400, y=2900
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
04:15
We were able to recover some target, but it is still very unstable. The new position is x=-12800, y=2000
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
06:15
Target still unstable, fluctuating around the 5e10 region
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK |
583
|
Mon Jun 3 21:37:20 2024 |
CN, EM, CB | Run30 |
Beam energy = 3 MeV
Horizontal beam position = 7.0 mm, vertical beam position = 0.0 mm.
Beam intensity at inj ~ 2.5e7
Detectors are positioned IN. Left arm = 36.54, right arm = 64.60 mm
22:52 (Attachments 1 -3)
Beam is very unstable
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
00:47
Beam is still very unstable.
We checked for beam-target overlap position and found a clear increase in counts at beam position 4.0 mm. We have left the beam at horizontal = 4.0 mm, vertical = 0.0
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK |
Attachment 1: Screenshot_from_2024-06-03_23-15-37.png
|
|
Attachment 2: Screenshot_from_2024-06-03_23-16-18.png
|
|
Attachment 3: Screenshot_from_2024-06-03_23-17-16.png
|
|
582
|
Mon Jun 3 15:17:41 2024 |
CN, EM, CB | Run29 |
16:15
In the previous run while working on the target it was discovered that the valve was closed! Probaly this happened around 10 am, we are not sure.
The gas target inlet valve is open again, working on the target.
Beam energy = 3 MeV
Horizontal beam position = 7.0 mm, vertical beam position = 0.0 mm.
Beam intensity at inj ~ 2.5e7
Detectors are positioned IN pneumatic only. Left arm = 62.71, right arm = 64.60 mm
Histograms and stats zero'd, monitoring code restarted.
Beam in the ring ~ 7 minutes.
Pressure in YR09 E target ~ 4.5e-11 mbar.
18:03 ( Attchments 1 -4)
Still no target!
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
20:23
We have the target back. S1( grafana) 4.8e-8. The target thickness read by the system 5E11 atoms/cm2 but apparently the formula is wrong and the value should be almost e12 atoms/cm2.
. We have now proper beam and target and we
|
Attachment 1: Screenshot_from_2024-06-03_18-04-47.png
|
|
Attachment 2: Screenshot_from_2024-06-03_18-05-11.png
|
|
Attachment 3: Screenshot_from_2024-06-03_18-06-09.png
|
|
Attachment 4: Screenshot_from_2024-06-03_18-06-40.png
|
|
Attachment 5: Screenshot_from_2024-06-03_20-35-00.png
|
|
581
|
Mon Jun 3 15:10:12 2024 |
CN, EM, CB | Run28 |
16:10
We start a new run after doing some test with the motor. Injection time is now a 6s, moving of the motors is working fine.
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
No target
|
Attachment 1: Screenshot_from_2024-06-03_16-12-44.png
|
|
Attachment 2: Screenshot_from_2024-06-03_16-13-11.png
|
|
Attachment 3: Screenshot_from_2024-06-03_16-14-11.png
|
|
Attachment 4: Screenshot_from_2024-06-03_16-16-37.png
|
|
580
|
Mon Jun 3 11:46:07 2024 |
SD, SHB, JM, CN, EM | Run 27 |
12:46 (attachments 1-4)
Run 27 started - Beam no target
Beam energy = 3 MeV
Horizontal beam position = 7.0 mm, vertical beam position = 0.0 mm.
Beam intensity at inj ~ 2.5e7
Detectors are positioned IN pneumatic only. Left arm = 62.71, right arm = 64.60 mm
Histograms and stats zero'd, monitoring code restarted.
Beam in the ring ~ 7 minutes.
Beam on BPM looks to be better than at previous energy.
Pressure in YR09 E target ~ 4.5e-11 mbar.
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
13:45 (attachments 5-8)
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
15:15(attachments 9-12)
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
Target density 1e10 atoms/cm2. Still working on the target.
|
Attachment 1: Screenshot_from_2024-06-03_12-48-03.png
|
|
Attachment 2: Screenshot_from_2024-06-03_12-48-37.png
|
|
Attachment 3: Screenshot_from_2024-06-03_12-49-13.png
|
|
Attachment 4: Screenshot_from_2024-06-03_12-49-47.png
|
|
Attachment 5: Screenshot_from_2024-06-03_13-45-42.png
|
|
Attachment 6: Screenshot_from_2024-06-03_13-46-49.png
|
|
Attachment 7: Screenshot_from_2024-06-03_13-47-32.png
|
|
Attachment 8: Screenshot_from_2024-06-03_13-47-51.png
|
|
Attachment 9: Screenshot_from_2024-06-03_15-16-51.png
|
|
Attachment 10: Screenshot_from_2024-06-03_15-17-49.png
|
|
Attachment 11: Screenshot_from_2024-06-03_15-18-19.png
|
|
Attachment 12: Screenshot_from_2024-06-03_15-22-14.png
|
|
579
|
Mon Jun 3 08:43:22 2024 |
SD, SHB | Run 26 |
09:44
Run 26 started - Beam no target
Beam energy is being increased from 1.5 to 3 MeV
Horizontal beam position = 7.0 mm, vertical beam position = 0.0 mm.
Detectors are positioned fully OUT
Histograms and stats zero'd, monitoring code restarted.
Pressure in YR09 E target ~ 4.5e-11 mbar.
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
10:48 (Attachements 1-4)
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
The detectors currently fully out for tuning.
11:57 (attachments 5-8)
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
The detectors currently fully out for tuning.
|
Attachment 1: Screenshot_from_2024-06-03_10-49-19.png
|
|
Attachment 2: Screenshot_from_2024-06-03_10-50-04.png
|
|
Attachment 3: Screenshot_from_2024-06-03_10-53-01.png
|
|
Attachment 4: Screenshot_from_2024-06-03_10-53-44.png
|
|
Attachment 5: Screenshot_from_2024-06-03_11-55-41.png
|
|
Attachment 6: Screenshot_from_2024-06-03_11-56-17.png
|
|
Attachment 7: Screenshot_from_2024-06-03_11-56-36.png
|
|
Attachment 8: Screenshot_from_2024-06-03_11-57-31.png
|
|
578
|
Sun Jun 2 23:38:17 2024 |
JM, EM | Run 25 |
00:38
Run 25 started - Beam on target
Beam energy = 1.5 MeV.
Horizontal beam position = 7.0 mm, vertical beam position = 0.0 mm.
Target density ~ 5e11 at/cm2 (Still Fluctuating, after temperature increase)
Beam intensity at inj ~ 2.5e7
Detectors are positioned IN. Left arm = 62.71, right arm = 64.60 mm
Histograms and stats zero'd, monitoring code restarted.
Beam in the ring ~ 5 minutes.
Pressure in YR09 E target ~ 5.2e-11 mbar.
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
01:30 (Attachments 1 - 4)
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
The target density seems very unstable: fluctuations from 1e11 to 1e12 atoms/cm2 within 5min
02:37 (Attachments 5 - 8)
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
The target density is around 5e11 atoms/cm2 with small adjustments
03:32 (Attachments 9 - 12)
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
The target density is in average 5e11 atoms/cm2 with some small adjustments. Max values up to 3e12 atoms/cm2
One of the injections at 03:43 was not ok and we lost beam for some min. Target density 1e12 atoms/cm2. On 04:00 the beam was back again without any operator intervention.
04:35 (Attachments 13 - 16)
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
The target density is in average 1e12 atoms/cm2.
05:43 (Attachments 17 - 20)
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
The target density decreased to 2e11 atoms/cm2 in the last 40 min
06:43 (Attachments 21 - 24)
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
The target density is fluctuating from 1e11 to 1e12 atoms/cm without any change....
07:53 (Attachments 25 - 28)
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
The target density is fluctuating from 1e11 to 1e12 atoms/cm without any change....
08:48 (Attachments 29 - 32)
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
The target density is fluctuating from 1e11 to 1e12 atoms/cm without any change....
09:40 --> Run 25 stopped.
|
Attachment 1: Screenshot_from_2024-06-03_01-34-08.png
|
|
Attachment 2: Screenshot_from_2024-06-03_01-34-32.png
|
|
Attachment 3: Screenshot_from_2024-06-03_01-34-54.png
|
|
Attachment 4: Screenshot_from_2024-06-03_01-35-46.png
|
|
Attachment 5: Screenshot_from_2024-06-03_02-38-30.png
|
|
Attachment 6: Screenshot_from_2024-06-03_02-38-55.png
|
|
Attachment 7: Screenshot_from_2024-06-03_02-39-26.png
|
|
Attachment 8: Screenshot_from_2024-06-03_02-40-07.png
|
|
Attachment 9: Screenshot_from_2024-06-03_03-33-32.png
|
|
Attachment 10: Screenshot_from_2024-06-03_03-33-56.png
|
|
Attachment 11: Screenshot_from_2024-06-03_03-34-20.png
|
|
Attachment 12: Screenshot_from_2024-06-03_03-35-16.png
|
|
Attachment 13: Screenshot_from_2024-06-03_04-35-47.png
|
|
Attachment 14: Screenshot_from_2024-06-03_04-36-07.png
|
|
Attachment 15: Screenshot_from_2024-06-03_04-36-25.png
|
|
Attachment 16: Screenshot_from_2024-06-03_04-39-59.png
|
|
Attachment 17: Screenshot_from_2024-06-03_05-44-44.png
|
|
Attachment 18: Screenshot_from_2024-06-03_05-45-07.png
|
|
Attachment 19: Screenshot_from_2024-06-03_05-45-24.png
|
|
Attachment 20: Screenshot_from_2024-06-03_05-46-22.png
|
|
Attachment 21: Screenshot_from_2024-06-03_06-42-21.png
|
|
Attachment 22: Screenshot_from_2024-06-03_06-42-49.png
|
|
Attachment 23: Screenshot_from_2024-06-03_06-43-48.png
|
|
Attachment 24: Screenshot_from_2024-06-03_06-44-02.png
|
|
Attachment 25: Screenshot_from_2024-06-03_07-48-07.png
|
|
Attachment 26: Screenshot_from_2024-06-03_07-49-47.png
|
|
Attachment 27: Screenshot_from_2024-06-03_07-50-51.png
|
|
Attachment 28: Screenshot_from_2024-06-03_07-53-01.png
|
|
Attachment 29: Screenshot_from_2024-06-03_08-46-03.png
|
|
Attachment 30: Screenshot_from_2024-06-03_08-46-41.png
|
|
Attachment 31: Screenshot_from_2024-06-03_08-47-09.png
|
|
Attachment 32: Screenshot_from_2024-06-03_08-48-17.png
|
|
577
|
Sun Jun 2 22:46:47 2024 |
JM, EM, NP | Run24 |
23:47
Run 24 started - Beam on target
Beam energy is 1.5 MeV.
Horizontal beam position = 7.0 mm, vertical beam position = -1.0 mm.
Target density ~ 1e11 at/cm2 (Still Fluctuating, after temperature increase)
Beam intensity at inj ~ 2.5e7
Detectors are positioned IN. Left arm = 62.71, right arm = 64.60 mm
Histograms and stats zero'd, monitoring code restarted.
Beam in the ring ~ 10 minutes.
Pressure in YR09 E target ~ 5.2e-11 mbar.
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
00:23
Target density ~4.65e11 atoms/cm2
Beam intensity at inj ~ 2.7e7
Beam intensity dropped to 2.1e7 in 10 minutes. Proportionall this is much greater than before.
Run 24 stopped.
|
Attachment 1: Screenshot_from_2024-06-02_23-53-00.png
|
|
Attachment 2: Screenshot_from_2024-06-02_23-53-47.png
|
|
Attachment 3: Screenshot_from_2024-06-02_23-56-22.png
|
|
576
|
Sun Jun 2 14:30:16 2024 |
TD | Offline analysis G22-201/R22_0 - R22_11 |
Offline analysis data file G22-201/R22_0 to R22_11
Sort program variables https://elog.ph.ed.ac.uk/CARME/240530_180659/variables.dat
ADC data corrected for ADC offset but not gain
per DSSSD m_p verus m_n - attachment 1
For spectra below events must satisfy condition 0 < m_p < 8 *and* 0 < m_n < 8
per DSSSD p+n junction strip versus n+n Ohmic strip - attachment 2
note - x/y channel ordering to be checked
per DSSSD E_p versus E_n - attachment 3
20keV/channel nominal
per DSSSD E_p versus E_n - attachment 4
gated w(1) & w(2)
20keV/channel nominal
per DSSSD projection of gated E_p versus E_n spectra - attachments 5-8
20keV/channel nominal |
Attachment 1: Screenshot_from_2024-06-01_23-04-28.png
|
|
Attachment 2: Screenshot_from_2024-06-01_23-05-20.png
|
|
Attachment 3: Screenshot_from_2024-06-01_23-05-58.png
|
|
Attachment 4: Screenshot_from_2024-06-01_22-57-42.png
|
|
Attachment 5: Screenshot_from_2024-06-01_22-59-30.png
|
|
Attachment 6: Screenshot_from_2024-06-01_23-00-45.png
|
|
Attachment 7: Screenshot_from_2024-06-01_23-01-56.png
|
|
Attachment 8: Screenshot_from_2024-06-01_23-03-22.png
|
|
575
|
Sun Jun 2 13:04:41 2024 |
JM, AG, CB, DR | Run 23 - vertical beam position and beam lifetime tests |
14:05
Run 22 stopped. Run 23 started we will now adjust the vertical beam position to see if we observe the beam stripe seen in the last beamtime.
Current vertical beam position 0.0 mm. Horizontal beam position 7.0 mm. Coasting beam.
Beam D+, 1.5 MeV. Storage time ~ 20 minutes. Target ON. Density ~1e11 at/cm2.
XY plot from run 22 with the same settings - attachment 1
Beam stripe looks like it is just on bottom detectors (just )
14:10
New beam settings
Vertical Beam position 5.0mm, Horizontal unchanged. Storage time reduced to ~2 minute
No real change observed. Perhaps some thing more can be seen on top right detector but definitely not like in the Feb experiment.
14:15
New beam settings
Vertical Beam position 9.0mm, Horizontal unchanged.
No real change observed again.
14:20
New beam settings
Vertical Beam position -9.0mm, Horizontal unchanged.
More events observed on bottom left detector but nothing like the Feb measurements. I think we do not have stripe effects like previously.
14:40:50
New Beam settings to check beam lifetime.
Vertical beam position set back to 0.0 mm. Horizontal unchanged
In bunched mode to observed intensity over time.
Injection into ring 2.2e7
15:15
Beam intensity dropped to 1.1e7. Beam lifetime 35 minutes.
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
15:24
We removed the target. Beam intensity at 2.2E7
After 35 minutes, the beam intensity is 1.41e7. So target does have effect on beam lifetime! We would like more.
16:05
We will now bring target back in and try to increase density.
16:10
Some sort of GSI-wide failure, we have lost beam entirely. We don't see any effect on our system. Temperatures and leakage currents are stable
Detectors moved fully out for safety
17:15
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
19:15
Still no beam
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
21:15
Still no beam
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
21:40
Beam has returned!
22:00
Target at around 9e11 and appears stable
Merger OK, Tape server OK
ADC data item statistics looks as before. OK
FEE temperatures look OK
System checks OK
Leakage current stable
22:33
Beam back in the ring. Beam settings to be updated.
Rates in right hand detectors look slightly different to before - lower in bottom right, slightly higher in top left. Perhaps beam vertical position needs to be lowered slightly.
ASIC check load just to be sure. Rates in aida15 greatly reduced - only temporarily.
|
Attachment 1: Screenshot_from_2024-06-02_14-04-55.png
|
|
574
|
Sun Jun 2 08:47:01 2024 |
CB, AG | Run 22 - longer rung with 20 min storage |
09:47
12 seconds pre acc
200x cycles
Detector pneumatics IN, not moving
Running in this configuration for the rest of the shift
Target is barely 1E11 atoms/cm2 and keeps decreasing
Temps OK, checks OK, Stats OK
Writing to disk rate OK
11:22
Targets gets thinner and thinner <1E11 atoms/cm2
Temps OK System wide checks OK Merger OK
Rates OK
13:02
Temps OK. Target around 1E11 atoms/cm2
Merger OK
Rates OK |
Attachment 1: Screenshot_from_2024-06-02_09-47-53.png
|
|
Attachment 2: Screenshot_from_2024-06-02_09-48-06.png
|
|
Attachment 3: Screenshot_from_2024-06-02_11-21-59.png
|
|
Attachment 4: Screenshot_from_2024-06-02_11-22-27.png
|
|
Attachment 5: Screenshot_from_2024-06-02_13-02-31.png
|
|
573
|
Sun Jun 2 06:41:00 2024 |
CB, AG | Run 21 - tests |
07:41
Switching to bunched beam to check D vs H content.
8:24
Attach 1&2
ONE spill
Detectors fully out
Switched to bunched beam
12 seconds pre-acceleration
100x cycles (600 seconds) -
Loss over 600 seconds 3.97E7 ions to 3.40E7 ions, i.e. negligible.
Attach 3&4
Coasting beam
12 seconds pre-acc
100x cycles
Attch 5&6
Coasting beam
12 seconds pre-acc
100x cycles
Detectors pneumatics IN
Attach 7& 8
Coasting beam
6 seconds pre-acc
100x cycles
Detector pneumatics IN
Attach 8&9
Coasting beam
12 seconds pre acc
200x cycles
Detector pneumatics IN
Running in this configuration for the rest of the shift
Target is barely 1E11 atoms/cm2 and keeps decreasing |
Attachment 1: Screenshot_from_2024-06-02_08-23-21.png
|
|
Attachment 2: Screenshot_from_2024-06-02_08-23-36.png
|
|
Attachment 3: Screenshot_from_2024-06-02_08-44-38.png
|
|
Attachment 4: Screenshot_from_2024-06-02_08-44-54.png
|
|
Attachment 5: Screenshot_from_2024-06-02_08-58-17.png
|
|
Attachment 6: Screenshot_from_2024-06-02_08-58-25.png
|
|
Attachment 7: Screenshot_from_2024-06-02_09-18-02.png
|
|
Attachment 8: Screenshot_from_2024-06-02_09-18-10.png
|
|
Attachment 9: Screenshot_from_2024-06-02_09-44-16.png
|
|
Attachment 10: Screenshot_from_2024-06-02_09-44-24.png
|
|