Entry  Mon Jun 3 08:43:22 2024, SD, SHB, Run 26 8x
09:44

Run 26 started - Beam no target

Beam energy is being increased from 1.5 to 3 MeV
Entry  Sun Jun 2 23:38:17 2024, JM, EM, Run 25  32x
00:38

Run 25 started - Beam on target

Beam energy = 1.5 MeV.
Entry  Sun Jun 2 22:46:47 2024, JM, EM, NP, Run24 Screenshot_from_2024-06-02_23-53-00.pngScreenshot_from_2024-06-02_23-53-47.pngScreenshot_from_2024-06-02_23-56-22.png
23:47

Run 24 started - Beam on target

Beam energy is 1.5 MeV.
Entry  Sun Jun 2 14:30:16 2024, TD, Offline analysis G22-201/R22_0 - R22_11 8x
Offline analysis data file G22-201/R22_0 to R22_11

Sort program variables https://elog.ph.ed.ac.uk/CARME/240530_180659/variables.dat
Entry  Sun Jun 2 13:04:41 2024, JM, AG, CB, DR, Run 23 - vertical beam position and beam lifetime tests Screenshot_from_2024-06-02_14-04-55.png
14:05

Run 22 stopped. Run 23 started we will now adjust the vertical beam position to see if we observe the beam stripe seen in the last beamtime.

Current vertical beam position 0.0 mm. Horizontal beam position 7.0 mm. Coasting beam.
Entry  Sun Jun 2 08:47:01 2024, CB, AG, Run 22 - longer rung with 20 min storage Screenshot_from_2024-06-02_09-47-53.pngScreenshot_from_2024-06-02_09-48-06.pngScreenshot_from_2024-06-02_11-21-59.pngScreenshot_from_2024-06-02_11-22-27.pngScreenshot_from_2024-06-02_13-02-31.png
09:47

12 seconds pre acc

200x cycles
Entry  Sun Jun 2 06:41:00 2024, CB, AG, Run 21 - tests 10x
07:41

Switching to bunched beam to check D vs H content.

8:24
Entry  Sat Jun 1 21:56:17 2024, JM, EM, EM, TY, CB, AG, Run 20 18x
22:56

Run 20 started - beam on target

Beam energy is 1.5 MeV. Horizontal beam position = 7.0 mm, vertical beam position = 0.0 mm.
Entry  Sat Jun 1 16:38:13 2024, TD, Offline analysis G22-201/R17 8x
Offline analysis data file G22-201/R17

Sort program variables https://elog.ph.ed.ac.uk/CARME/240530_180659/variables.dat
Entry  Sat Jun 1 13:33:50 2024, TD, Offline analysis APR24/R3 (alpha background)  9x

Offline analysis data file APR24/R3 (alpha background)
Entry  Sat Jun 1 07:16:15 2024, CB, AB, EM, JM, Run 19 - beam target overlap 19x
Morning shift

08:16 - as run 18, target off

9:00 Increased storage time to 5 minutes. Aquired data after initial beam loss. Attach 1 &2. Far less H2+ vs D.
Entry  Fri May 31 21:53:20 2024, CB EM, JM,EM AB, Overnight beam tests 17x
22:53

Run 15 started

Beam tests. We increased the storage time to 2min and switched to bunched beam so that we can see the beam lifetime over the cycle.
Entry  Fri May 31 21:03:21 2024, CB, EM, Run14 Screenshot_from_2024-05-31_22-05-57.pngScreenshot_from_2024-05-31_22-07-01.pngScreenshot_from_2024-05-31_22-07-49.png
22:03

Before this run we checked quickly  beam with the target on but it does not make sense with the current status of the beam.

We removed target and starte Run14
Entry  Fri May 31 19:12:01 2024, CB, EM, Run 13 - test with beam Screenshot_from_2024-05-31_20-13-46.pngScreenshot_from_2024-05-31_20-27-58.pngScreenshot_from_2024-05-31_20-32-59.png
20:00

The beam is set at the correct energy, operators cross-checked it again. What we see  at 750 is due to the molecular beam.  The operotors
are trying to optimize and get rid of this in the next 30min.
Entry  Fri May 31 06:01:55 2024, JM, TY, PW, EM, CB, Run 12 - beam on target 12x
07:00

Run 12 started. D+ beam is incident on the target at 1.5 MeV

Beam intensity in the ring is ~4e7 particles
Entry  Thu May 30 13:31:01 2024, JM, CB, PW, YL, Run 11 - beam on target overlap Screenshot_from_2024-05-30_14-33-19.pngScreenshot_from_2024-05-31_02-09-35.pngScreenshot_from_2024-05-31_06-57-12.png20240531_073828.jpg
14:30

Run 11 started. D+ beam in the ring at 1.5 MeV.

No target at the moment. Valves to the interaction chamber will soon be opened.
Entry  Thu May 30 09:30:33 2024, CB, PW, YL, TD, Run 10 13x
10:30

Merger OK, Tape server OK

ADC data item statistics looks as before. OK
Entry  Thu May 30 08:33:21 2024, CB, PW, YL, Run 8 & 9- detector motion tests 7x
09:34 - Moved to Run 9 in preparation of moving detectors. No target yet. Beam in the ring at 750 keV/A.

Temperatures OK (attach)

System wide checks OK except 16 fails clock and ADC calib
Entry  Thu May 30 07:25:53 2024, Yuri, Phil, Nikos, Gas target 
The cave is closed and beam is back

The d intensity is about half of the intensity before the break

The gas target is prepared but the valvas cannot be opened. Anton is coming in at around 1 PM to open the gate valves.
Entry  Thu May 30 06:00:51 2024, Yuri Nikos ..., Open the cave 
Nikos needs to enter the cave to work on the target cooling.

 