593
|
Thu Jun 6 05:44:45 2024 |
DR YL DB LB CB JM | Run 38 - 15N Tests | 06:45
All system checks OK
Target density 3.4e11 |
8x |
592
|
Wed Jun 5 13:34:02 2024 |
JM | Run 37 - Change in thresholds | 14:20
Target nozzle currently being replaced.
No beam |
|
591
|
Wed Jun 5 13:21:45 2024 |
JM, CB | Run 36 - pulser walkthrough | 14:00
Access to the cave as Nikos and
Andreas have begun work on the target. |
   |
590
|
Wed Jun 5 08:34:04 2024 |
JM. DB, PC | Target nozzle change | 09:30
Target density has not improved
despite efforts last night. Mid 10 - low |
|
589
|
Tue Jun 4 19:19:26 2024 |
TD | [How To] Recover DAQ when one FEE64 stops sending data | 1) STOP DAQ [workspace 2, display 1, browser
tab 'Run Control']
all FEE64s should change status from 'going' |
|
588
|
Tue Jun 4 18:08:04 2024 |
Boudefla Dounia - CB - LB - SD | Run 34 | 19:08
Beam energy = 3 MeV.
Horizontal beam position = 4.0 |
19x |
587
|
Tue Jun 4 15:25:36 2024 |
BD US CB | Run 33 | 16:26
Merger OK, Tape server OK
ADC data item statistics looks |
   |
586
|
Tue Jun 4 14:13:17 2024 |
JM, CB, DB, US | Run 32- beam only background | 15:15
Run 32 started - Beam, no target
Beam energy = 3 MeV. |
|
585
|
Tue Jun 4 06:56:02 2024 |
DFF, PC, LB, JM,NP,AB | Run 31 contd | 8:13
Since 6:40 the target density dramatically
dropped to 10^9 since then it has been unstable |
 |
584
|
Tue Jun 4 00:04:39 2024 |
DR, EH | Run 31 | Beam energy = 3 MeV
Horizontal beam position = 4.0
mm, vertical beam position = 0.0 mm. |
|
583
|
Mon Jun 3 21:37:20 2024 |
CN, EM, CB | Run30 | Beam energy = 3 MeV
Horizontal beam position = 7.0
mm, vertical beam position = 0.0 mm. |
  |
582
|
Mon Jun 3 15:17:41 2024 |
CN, EM, CB | Run29 | 16:15
In the previous run while working
on the target it was discovered that the |
    |
581
|
Mon Jun 3 15:10:12 2024 |
CN, EM, CB | Run28 | 16:10
We start a new run after doing
some test with the motor. Injection time |
   |
580
|
Mon Jun 3 11:46:07 2024 |
SD, SHB, JM, CN, EM | Run 27 | 12:46 (attachments 1-4)
Run 27 started - Beam no target
Beam energy = 3 MeV |
12x |
579
|
Mon Jun 3 08:43:22 2024 |
SD, SHB | Run 26 | 09:44
Run 26 started - Beam no target
Beam energy is being increased |
8x |
578
|
Sun Jun 2 23:38:17 2024 |
JM, EM | Run 25 | 00:38
Run 25 started - Beam on target
Beam energy = 1.5 MeV. |
32x |
577
|
Sun Jun 2 22:46:47 2024 |
JM, EM, NP | Run24 | 23:47
Run 24 started - Beam on target
Beam energy is 1.5 MeV. |
  |
576
|
Sun Jun 2 14:30:16 2024 |
TD | Offline analysis G22-201/R22_0 - R22_11 | Offline analysis data file G22-201/R22_0 to
R22_11
|
8x |
575
|
Sun Jun 2 13:04:41 2024 |
JM, AG, CB, DR | Run 23 - vertical beam position and beam lifetime tests | 14:05
Run 22 stopped. Run 23 started
we will now adjust the vertical beam position |
|
574
|
Sun Jun 2 08:47:01 2024 |
CB, AG | Run 22 - longer rung with 20 min storage | 09:47
12 seconds pre acc
200x cycles |
    |
|