Entry  Thu Jul 27 09:43:56 2023, RSS, Thermocouples connected -2 IMG_9920.jpgIMG_9919.jpg

10:30  IE514 1.80e-08mbar

Most of the CARME is covered by the baking tent. The tent needs to be closed and a bit covered from the front
(upstream), end (downstream), and bottom side. TCs are labeled with a marker in the sequence 1-1 to 2-8.


1-1 Internal TC 1
1-2 Internal TC 2
1-3 Internal TC 3
1-4 CARME front top
1-5 CARME front bottom
1-6 Top hanging middle
1-7 CARME middle
Entry  Sat Jul 22 09:19:59 2023, RSS, TD, Thermocouples connected 10x
10.20 Pirani 1e-03mbar IE514 3.26e-08mbar

Entry  Wed Nov 10 18:24:12 2021, RSS, Thermocouple labelling labeling.JPG.svgLabelling.svgIMG_5512.JPG
1. Detector

2. Chamber back

3. Strain relief
Entry  Thu Oct 21 20:26:44 2021, JM TD, Thermocouple and Connector cables 10x
NEG pump electrical connections tested - all connections sound. 

Detector carriers have been redrilled and are currently being cleaned. Carriers were checked within the chamber, mounting much easier with new
hole. Distances to NEG feedthroughs and thermocouple feedthrough from the carrier also checked. NEG feedthroughs have sufficient separation now moved,
Entry  Thu Nov 18 13:50:51 2021, CB RSS, Thermocamera images 14x
Used thermocamera provided by GSI beam diagnostic division to take some pictures of YR09. See attached.

Due to aluminium outer wrapping some reflections are inevitable, but tried to only take pictures of heat spots that did not disapper from different
angles.
Entry  Thu Jan 4 13:15:10 2024, CB, JM, Tent removed - bias test Bias.png
Removed tent, octagon, Neg cables.

Disconnected and removed Baking Pi, TC08, thermocouples.

Tested new rails, plates, fees - it fits. Need to check on the flange next.
Entry  Mon Sep 27 11:09:48 2021, CB (remotely), Temperature vs Pressure plot Temps.pdf
Attached.
Entry  Mon Feb 28 01:16:02 2022, JM, OF, Temperature decrease 115K to 110K 20220228_021455.jpg20220228_023832.jpg20220228_025416.jpg
02:15

Density remains stable at 155 K

Temperature setpoint decreased by 1K. Aim to get to 110 K to see if higher stable density can be achieved. 
Entry  Mon Feb 28 05:04:47 2022, JM, OF, Temperature cycle to 125K 2022-02-28_06-30-39-Exrate.png
06:01

Rutherford rate was decreased compared to previous values. Max rate ~ 50 counts for the peak, average ~20 counts. 

Temperature increased to 125 K
Entry  Mon Feb 28 13:56:02 2022, JG, CB, Temperature cycle to 125K 
14:45

Rutherford rate was decreased significantly for longer period.

Temperature increased to 125 K
Entry  Tue Mar 1 04:07:31 2022, JM, EM, Temperature cycle 
Have been unable to achieve decent target density with temperature cycling so far. Will attempt to go up to 300 k and back down to around 115 k which
proved successful in previous shifts.
Entry  Tue Mar 1 03:19:50 2022, JM, EM, Temperature Cycle 
04:20

Did another temperature cycle (118 K -> 125 K -> 95 K -> 116 K) trying to improve the pressures at the target and the detector count
rate.
Entry  Wed Mar 2 03:40:40 2022, David, George, Temperature Cycle 
04:40
Target density is hovering between 2.0e-8 and 2.3e-8, sometimes dipping below 2.0e-8

We will conduct a temperature walkthrough while there is no beam,
Entry  Fri May 23 09:19:40 2025, SN, TD, Target wait, switch lithium oven 18x

10.12 DAQ, Merger & Tape Server running OK - no storage mode 
Entry  Sun Jun 16 22:40:11 2024, JM, Target overlap test - R81 Beam-overlap-updated2.png
23:10

Beam set to bunched mode to observe beam lifetime. 

Electron cooler voltage setpoint kept at 246.8 V. Note this is 0.5 V lower than the previous test where the setpoint was 247.3 V
Entry  Tue Jun 11 19:44:48 2024, OF, SS, Target out and at He 
Target has been moved out and H2 switched off. Changed to He.

Nikos will repair nozzle tomorrow morning. Remote checks until then.
Entry  Wed Jun 5 08:34:04 2024, JM. DB, PC, Target nozzle change 
09:30

Target density has not improved despite efforts last night. Mid 10 - low 11 density range. We will try to change the nozzle.

Target nozzle moved to the out position.
Entry  Fri Feb 2 09:58:58 2024, TD, TapeServer not writng data to disk - plus fix  7x
DAQ and NewMerger appear to be cofigured correctly.

Can allocate device, create volume and open file with TapeServer but cannot write data.
Entry  Mon Oct 3 16:03:33 2022, OH, CB, TTT14 Photos 
Photos of the new TTT14 DSSD delivered to GSI.
Photos of detectors are broken up by photos of SN on box
To big to put on elog. Have uploaded to /Disk/ds-sopa-group/np/GSI/CARME/TTT14_Photos.zip and will change permissions to 777
Entry  Wed Feb 23 20:52:56 2022, CN, TD, System wide checks 11x

Attachments 1-5 aida01-aida05 options