AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 6 of 38  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Subjectdown Text Attachments
  430   Thu Jul 27 09:43:56 2023 RSSThermocouples connected -2
10:30  IE514 1.80e-08mbar

Most
of the CARME is covered by the baking tent.
The tent needs to be closed and a bit covered
 IMG_9920.jpgIMG_9919.jpg 
  425   Sat Jul 22 09:19:59 2023 RSS, TDThermocouples connected10.20 Pirani 1e-03mbar IE514 3.26e-08mbar

 10x 
  149   Wed Nov 10 18:24:12 2021 RSSThermocouple labelling1. Detector

2. Chamber back

3. Strain relief
 labeling.JPG.svgLabelling.svgIMG_5512.JPG 
  128   Thu Oct 21 20:26:44 2021 JM TDThermocouple and Connector cablesNEG pump electrical connections tested
- all connections sound. 

Detector carriers have been redrilled
 10x 
  158   Thu Nov 18 13:50:51 2021 CB RSSThermocamera imagesUsed thermocamera provided by GSI beam
diagnostic division to take some pictures
of YR09. See attached.
 14x 
  457   Thu Jan 4 13:15:10 2024 CB, JMTent removed - bias testRemoved tent, octagon, Neg cables.

Disconnected and removed Baking
Pi, TC08, thermocouples.
 Bias.png 
  87   Mon Sep 27 11:09:48 2021 CB (remotely)Temperature vs Pressure plotAttached.  Temps.pdf 
  318   Mon Feb 28 01:16:02 2022 JM, OFTemperature decrease 115K to 110K02:15

Density remains stable at
155 K
 20220228_021455.jpg20220228_023832.jpg20220228_025416.jpg 
  322   Mon Feb 28 05:04:47 2022 JM, OFTemperature cycle to 125K06:01

Rutherford rate was decreased compared
to previous values. Max rate ~ 50 counts
 2022-02-28_06-30-39-Exrate.png 
  331   Mon Feb 28 13:56:02 2022 JG, CBTemperature cycle to 125K14:45

Rutherford rate was decreased significantly
for longer period.
  
  340   Tue Mar 1 04:07:31 2022 JM, EMTemperature cycleHave been unable to achieve decent target
density with temperature cycling so far.
Will attempt to go up to 300 k and back down
  
  338   Tue Mar 1 03:19:50 2022 JM, EMTemperature Cycle04:20

Did another temperature cycle (118
K -> 125 K -> 95 K -> 116 K) trying
  
  361   Wed Mar 2 03:40:40 2022 David, GeorgeTemperature Cycle04:40
Target density is hovering between
2.0e-8 and 2.3e-8, sometimes dipping below
  
  688   Fri May 23 09:19:40 2025 SN, TDTarget wait, switch lithium oven
10.12 DAQ, Merger & Tape Server running OK
- no storage mode 
 18x 
  643   Sun Jun 16 22:40:11 2024 JMTarget overlap test - R8123:10

Beam set to bunched mode to observe
beam lifetime. 
 Beam-overlap-updated2.png 
  618   Tue Jun 11 19:44:48 2024 OF, SSTarget out and at HeTarget has been moved out and H2 switched
off. Changed to He.

Nikos will repair nozzle tomorrow
  
  590   Wed Jun 5 08:34:04 2024 JM. DB, PCTarget nozzle change09:30

Target density has not improved
despite efforts last night. Mid 10 - low
  
  487   Fri Feb 2 09:58:58 2024 TDTapeServer not writng data to disk - plus fix DAQ and NewMerger appear to be cofigured correctly.

Can allocate device, create volume and open
 7x 
  379   Mon Oct 3 16:03:33 2022 OH, CBTTT14 PhotosPhotos of the new TTT14 DSSD delivered to
GSI.
Photos of detectors are broken up by photos
  
  261   Wed Feb 23 20:52:56 2022 CN, TDSystem wide checks
Attachments 1-5 aida01-aida05 options
 11x 
ELOG V3.1.4-unknown