Message ID: 52     Entry time: Sat Nov 24 16:29:10 2018
Author: Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Tom Davinson, Raffaele Buompane 
Subject: Preparing setup for 7Li beam 

On 23/11/2018:

10:15 started pumping down chamber with Ecodry 2

RAL thresholds:

  • First 4 RALs = 10mV
  • 5th RAL = 17mV
  • 6th RAL = 20mV
  • 7th and 8th RALs ECL disconnected
  • 9th - 16th RALs not in use (no near S2)

10:30 pressures ~ 1mBar, opened T1600 backing valve, Turbos switched on

10:35 pressures (mBar):

  • TPU1 = 5.2e-5
  • TPU2 = 6.4e-6
  • TPD1 = 6.0e-6
  • TPD2 = 8.7e-6
  • CHUP = 2.3e-5
  • CHDW = 5.5e-5

Biased detectors: Far S2 bias = -130V, leak I = 1.54uA. Diode bias = -70V, leak I = 0.02uA.

Replaced diode TFA, now using channel 4 on new TFA. Diode connected to 3rd ADC channel 16 (counting from 0)

Started pulser only run

  • Run # 181123111015

Closed far S2 iris (82.5mm actuator setting). Set target ladder to blank 10mm target frame.

Disconnected vacuum gauges located below chamber on same side as target ladder is mounted - noise improved

Started pulser only run

  • Run # 181123113237

 