AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DCF  ELOG logo
Message ID: 11     Entry time: Tue Feb 20 13:17:12 2024
Author: RSS MA TD PB 
Subject: Mounting at DCF 

On the ladder, Quartz was mounted on the bottom position. The bottom position (Quartz) is called target 1 at 0 mm, middle position (27Al target on Ta backing) is called target 2 at 50 mm, and top position (27Al target on Ta backing) is called target 3 at 100 mm.

On HV supply, Channel 0 is connected to Suppressor and Channel 1 is connected to Target.

 

Settings on Electronics:

HV to NaI detector = +694 V

Amplifier gain x1 (internal jumper) x1.5 (fine gain) x20 (course gain)

Shaping time is 0.5 us

Attachment 1: 7409CED3-B991-4CAD-AB47-60591C07DBE7.jpeg  232 kB  | Hide | Hide all
7409CED3-B991-4CAD-AB47-60591C07DBE7.jpeg
Attachment 2: C166146D-5A59-4C2F-A1D8-EF062DA672D4.jpeg  204 kB  | Hide | Hide all
C166146D-5A59-4C2F-A1D8-EF062DA672D4.jpeg
Attachment 3: E0EDF9BB-23D9-4DAD-B0AB-684A07616DF1.jpeg  227 kB  | Hide | Hide all
E0EDF9BB-23D9-4DAD-B0AB-684A07616DF1.jpeg
Attachment 4: 8E092802-CABF-4207-89F6-775210CBA1E1.jpeg  429 kB  | Hide | Hide all
8E092802-CABF-4207-89F6-775210CBA1E1.jpeg
Attachment 5: E053DDE4-57F1-4F9D-BB13-6EC57A67E756.jpeg  319 kB  Uploaded Tue Feb 20 16:19:03 2024  | Hide | Hide all
E053DDE4-57F1-4F9D-BB13-6EC57A67E756.jpeg
ELOG V3.1.4-unknown