|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
DESPEC |
 |
|
Message ID: 149
Entry time: Fri Mar 13 15:48:11 2020
|
Author: |
Friday 13th 16:00 - 24:00 |
Subject: |
OH, TD |
|
|
ASIC settings 2019Oct31-13.24.23
slow comparator 0xa
BNC PB-5 pulser
amplitude 1.0V , attenuator x1
frequency 2Hz
decay time 1ms
16:51 Bias and leakage currents ok but starting to increase in DSSD 1 predominantly - attachment 1
Statistics ok - attachment 2
FEE temp ok - attachment 3
System wide checks all ok
16:57 Histograms zeroed
17:17 ASIC control check done
17:40 Layout 1 - attachment 4
Layouts 3 and 4 - attachments 4 and 5
Layouts 5 and 6 - attachments 6 and 7
19:06 Earlier in the shift two extra 8TB drives were formatted and mounted
Named SecondDrive and ThirdDrive
TapeData folder created on SecondDrive
Plan is before the end of this shift to move the symbolic link from the filling up drive to the new drive
Current prediction is drive would otherwise be full by 12:20 tomorrow.
Playing it safe and switching early
21:57 Bias and leakage ok - attachment 8
Statistics ok - attachment 9
FEE Temps ok - attachment 10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|