01.02.2021 - Four new sets of PSU, HDMI & Ethernet cables were ran from the DESPEC rack to the AIDA frame, in preparation for 4 new FEE64s.
A new 7 port USB hub has also been placed for the last few serial connections.
For the first experiment this year, we will run with a narrow AIDA configuration as in 2020. (12 FEEs)
The system has been powered up and biased successfully. To be monitored over the next few days.
A lot of the FEE serial monitors are missing, I think a hub has been disconnected from nnrpi1. This will be investigated on Wednesday.
The rack will also be grounded properly on Wednesday to investigate the impact on the noise.
A single new water line (feed and return) needs to be installed for the 16th FEE, this will be done once the hose is found/ordered...
The 4 new FEE64s will be mounted and powered up at some point to obtain the MAC addresses, and possibly check MIDAS merging 16 FEE64s.
Waveform data will be taken wednesday before & after grounding the rack to see noise situation currently |