  DESPEC, Page 2 of 33  ELOG logo
Entry  Wed Dec 11 14:46:21 2024, TD, JB, CC, MP, Mounting of AIDA, bPlast and BB7 for test 20241211_161837.jpg20241211_161833.jpg20241211_161830.jpg20241211_161820.jpg
Snout assembled for detector position and timing test.

The planned test is to use a BGO with a 22-Na source and the implantation stack to characterise the timing and position of back-to-back 511 keV
events (proxy for mock beta decay event).
Entry  Mon Dec 9 12:28:01 2024, NH, CC, MP, Test of BB7 on AIDA Electronics 
BB7 connected to aida07, sitting in a cardboard box

Update Tcl/Tml files in ASIC, ASIC4 and sys.tml frm PJCS email to allow setting per-ASIC polarity on FEE64
Entry  Thu Dec 5 11:18:46 2024, TD, Offline analysis S100 data files R21_0-R21_99 23x
Offline analysis of S100 data files R21_0 - R21_99 (162Eu setting)

first WR ts
Entry  Wed Dec 4 09:57:24 2024, TD, HISPEC DESPEC meeting presentation - November 2024 -0 Summary of AIDA performance 2024 Summary_of_AIDA_2024_distro.pdf
 
Entry  Tue Nov 19 11:24:25 2024, TD, Anydesk restarted remotely 

Anydesk restarted remotely per https://elog.ph.ed.ac.uk/CARME/489
Entry  Tue Nov 5 15:19:35 2024, TD, S505 offline analysis R5_780 - R5_814 24x
Offline analysis of data files S505/R5_780 - R5_814 (corresponding to MBS data files 73-74) 

Can find an analysis of alpha background runs at RIBF, RIKEN for comparison at https://elog.ph.ed.ac.uk/AIDA/816
Entry  Wed Aug 14 12:40:11 2024, JB, Repaired DSSSD delivery 14.09.2024 11x
Three BB18-1000 triples AIDAs collected on 14.09.2024

Find attached visual of the wafer and bond wire + factory bias tests accompanying the DSSSDs. elog:669/1
elog:669/2 elog:669/3
Entry  Sun Jul 14 16:52:28 2024, TD, S181 R7_38-44 7x
 
Entry  Sun Jul 14 14:37:53 2024, TD, S181 R6_375-380 6x
 
Entry  Mon Jun 17 02:13:21 2024, TD, Monday 17 June 43x
03.11 DSSSD bias & leakage current OK - attachment 1

      FEE64 temperatures OK - attachment 2
Entry  Sun Jun 16 03:11:27 2024, TD, Sunday 16 June 26x
04.08 DSSSD bias & leakage current OK - attachment 1

      FEE64 temperatures OK - attachment 2
Entry  Sat Jun 15 00:28:01 2024, TD, Saturday 15 June 45x
Beam lost due to septum failure c. 18.15 Friday 14 June

Cooling of recirculating water failed c. 19.00 - water temperature increased from the normal 17-18deg C to 25-26 deg C
Entry  Fri Jun 14 15:00:47 2024, Norah , Muneerah, 16:00-20:00 Friday 14 June  13x
Everything appears to be running smoothly. Attachments 1-4 were taken around 16:00

DSSSD Bias & Leakage Current - Check: OK (see attachment 1)
FEE64 Temperature - Check: OK (see attachment 2)
Entry  Fri Jun 14 06:22:39 2024, TD, 08:00-16:00 Friday 14 June 23x

07.23 All histograms & stats zero'd
Entry  Thu Jun 13 23:04:01 2024, Dan Judson, TD, 0.00-8.00 14/6/24 40x
0.00 checks - all looks ok

Voltage/currents - attachment 1

Rates attachment 2 + 3
Entry  Thu Jun 13 21:06:44 2024, Robert Page, 16:00 to 00:00 shift on 13/6/2024 26x
Elog went down around the end of the last shift, so final screenshots were not uploaded at that point.

However, AIDA appears to have contuned running smoothly in the interim (at least until 22:00).

 
Entry  Thu Jun 13 06:49:54 2024, Magda Satrazani, 08:00 - 16:00 Thursday 13 June 2024 40x
Took over the shift from Marc.

08:00 FULL CHECK
Entry  Wed Jun 12 23:00:16 2024, Marc, 00:00-08:00 Thursday 13 June 23x
Starting a new night shift - All good

1am full check:
DSSSD bias & leakage current  ok - attachment # 1-2
Entry  Wed Jun 12 15:41:07 2024, Betool Alayed, 16:00-00:00 Wed 12 Jun 24 27x
5pm full checks:
DSSSD bias & leakage current  ok - attachment # 1-2
FEE64 temperatures  ok - attachment # 3
Entry  Wed Jun 12 11:06:55 2024, PP, Mid-shift checks, 12:00 8x
All seems normal.

Screenshots attached.