Wed Dec 11 14:46:21 2024, TD, JB, CC, MP, Mounting of AIDA, bPlast and BB7 for test   
|
Snout assembled for detector position and timing test.
The planned test is to use a BGO with a 22-Na source and the implantation stack to characterise the timing and position of back-to-back 511 keV
events (proxy for mock beta decay event). |
Mon Dec 9 12:28:01 2024, NH, CC, MP, Test of BB7 on AIDA Electronics
|
BB7 connected to aida07, sitting in a cardboard box
Update Tcl/Tml files in ASIC, ASIC4 and sys.tml frm PJCS email to allow setting per-ASIC polarity on FEE64
|
Thu Dec 5 11:18:46 2024, TD, Offline analysis S100 data files R21_0-R21_99 23x
|
Offline analysis of S100 data files R21_0 - R21_99 (162Eu setting)
first WR ts
|
Wed Dec 4 09:57:24 2024, TD, HISPEC DESPEC meeting presentation - November 2024 -0 Summary of AIDA performance 2024
|
|
Tue Nov 19 11:24:25 2024, TD, Anydesk restarted remotely
|
Anydesk restarted remotely per https://elog.ph.ed.ac.uk/CARME/489 |
Tue Nov 5 15:19:35 2024, TD, S505 offline analysis R5_780 - R5_814 24x
|
Offline analysis of data files S505/R5_780 - R5_814 (corresponding to MBS data files 73-74)
Can find an analysis of alpha background runs at RIBF, RIKEN for comparison at https://elog.ph.ed.ac.uk/AIDA/816
|
Wed Aug 14 12:40:11 2024, JB, Repaired DSSSD delivery 14.09.2024 11x
|
Three BB18-1000 triples AIDAs collected on 14.09.2024
Find attached visual of the wafer and bond wire + factory bias tests accompanying the DSSSDs. elog:669/1
elog:669/2 elog:669/3 |
Sun Jul 14 16:52:28 2024, TD, S181 R7_38-44 7x
|
|
Sun Jul 14 14:37:53 2024, TD, S181 R6_375-380 6x
|
|
Mon Jun 17 02:13:21 2024, TD, Monday 17 June 43x
|
03.11 DSSSD bias & leakage current OK - attachment 1
FEE64 temperatures OK - attachment 2
|
Sun Jun 16 03:11:27 2024, TD, Sunday 16 June 26x
|
04.08 DSSSD bias & leakage current OK - attachment 1
FEE64 temperatures OK - attachment 2
|
Sat Jun 15 00:28:01 2024, TD, Saturday 15 June 45x
|
Beam lost due to septum failure c. 18.15 Friday 14 June
Cooling of recirculating water failed c. 19.00 - water temperature increased from the normal 17-18deg C to 25-26 deg C
|
Fri Jun 14 15:00:47 2024, Norah , Muneerah, 16:00-20:00 Friday 14 June 13x
|
Everything appears to be running smoothly. Attachments 1-4 were taken around 16:00
DSSSD Bias & Leakage Current - Check: OK (see attachment 1)
FEE64 Temperature - Check: OK (see attachment 2) |
Fri Jun 14 06:22:39 2024, TD, 08:00-16:00 Friday 14 June 23x
|
07.23 All histograms & stats zero'd
|
Thu Jun 13 23:04:01 2024, Dan Judson, TD, 0.00-8.00 14/6/24 40x
|
0.00 checks - all looks ok
Voltage/currents - attachment 1
Rates attachment 2 + 3 |
Thu Jun 13 21:06:44 2024, Robert Page, 16:00 to 00:00 shift on 13/6/2024 26x
|
Elog went down around the end of the last shift, so final screenshots were not uploaded at that point.
However, AIDA appears to have contuned running smoothly in the interim (at least until 22:00).
|
Thu Jun 13 06:49:54 2024, Magda Satrazani, 08:00 - 16:00 Thursday 13 June 2024 40x
|
Took over the shift from Marc.
08:00 FULL CHECK |
Wed Jun 12 23:00:16 2024, Marc, 00:00-08:00 Thursday 13 June 23x
|
Starting a new night shift - All good
1am full check:
DSSSD bias & leakage current ok - attachment # 1-2 |
Wed Jun 12 15:41:07 2024, Betool Alayed, 16:00-00:00 Wed 12 Jun 24 27x
|
5pm full checks:
DSSSD bias & leakage current ok - attachment # 1-2
FEE64 temperatures ok - attachment # 3 |
Wed Jun 12 11:06:55 2024, PP, Mid-shift checks, 12:00 8x
|
All seems normal.
Screenshots attached. |