AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 2 of 35  ELOG logo
Entry  Wed Jul 23 15:56:00 2025, CC, MP, NK, Test of AIDA05 with new bias module Screenshot_from_2025-07-23_17-08-56.png
Attachment1: AIDA05.1.8L when AIDA05 connected, biased at 101 V with shielded cables. BB7 is still connected but not biased (same configuration as the
previous elog). The channel of the CAEN power supply #0 is connected to ASIC08 and biased at 100V. The channel of the CAEN power supply #1 is disconnected
but still biased at 100V. AIDA04 (chained to AIDA05) is biased via a shielded cable to an iseg NHQ 246L power supplied, biased at 101 V with 16 uA.
Entry  Wed Jul 23 15:04:26 2025, CC, MP, NK, Test of AIDA05 with BB7 connected to Mesytec but not biased Screenshot_from_2025-07-23_16-16-57.png
Attachment1: AIDA05.1.8L when AIDA05 connected, biased at 100 V with not-shielded cables, after the DEGAS platform has been closed, the 2 tiles of BB7
have been connected to the mesytec preamps. BB7 is not biased. The mesytec preamps have been fully connected and supplied but 6/8 black cables are not
connected on the other side. 4X and 4Y are connected to the 2 FEBEX cards.
Entry  Wed Jul 23 13:59:37 2025, CC, NK, Shielding of the snout Screenshot_from_2025-07-23_15-07-42.png
Attachment1: AIDA05.1.8L when AIDA05 connected, biased at 100 V with not-shielded cables, CAEN HT,  after the base of the snout (screws) has
been connected to the ground via cupper sheets

FWHM: 76 channels (to be compared with the 2 previous elogs 73 channels and 75 channels)
Entry  Wed Jul 23 13:08:30 2025, CC, NK, Comparison of channels in the same FEE64 and ASIC 05.1 Screenshot_from_2025-07-23_14-11-36.pngScreenshot_from_2025-07-23_14-13-46.pngScreenshot_from_2025-07-23_14-16-03.pngScreenshot_from_2025-07-23_14-18-27.pngScreenshot_from_2025-07-23_14-20-42.png
Biased at 100, AIDA05 connected, HT cables not shielded CAEN HT

Attachment 1: AIDA05.1.8L --> FWHM 75 channels

Attachment 2: AIDA05.1.1L --> FWHM 70 channels; peak of the pulser shifted to the right (red lines on the left: cursor for the 1.8L)
Entry  Wed Jul 23 09:37:34 2025, CC, NK, Comparison pulser FWHM with/without HT and detector cables 9x
This elog is the first reliable. Before, the histograms have not been zero'd

Each test are done and compared for AIDA05.1.8L, compared with the pulser (caracteristics, see attachment1)

Test 1: with HT cables shielded
Entry  Tue Jul 22 18:00:45 2025, CC, NK, MP, FWHM aida FEE Screenshot_from_2025-07-22_18-59-26.pngScreenshot_from_2025-07-22_18-59-45.png
AIDA05 completely disconnected, all the others FEEs64 are fully connected

Attachment 1: aida05, FWHM= 95 ch, 63 keV

Attachment 2: aida15, FWHM= 108 ch, 74 keV
Entry  Tue Jul 22 17:00:26 2025, MP, CC, Status Screenshot_from_2025-07-22_17-51-52.pngScreenshot_from_2025-07-22_17-59-20.png
Test with shielded HV cables for both detectors.

The FWHM for ch1 is now 184 ch.

Yesterday cables for cards 5, 6, 10, 11, 12, 14, 16 were partially connected (only 1 out of 2 flat cables was in), now both are connected.
Entry  Mon Jul 21 13:01:19 2025, MP, Status Screenshot_from_2025-07-21_14-00-23.pngScreenshot_from_2025-07-21_14-00-39.png
Status before grounding checks
Entry  Sun Jun 15 10:53:08 2025, TD, Sunday 15 June 2025 41x

11.45 DSSSD bias & leakage current - attachment 1
      FEE64 temps OK - attachment 2
Entry  Sat Jun 14 11:20:45 2025, TD, Saturday 14 June 2025 30x

12.21 BNC PB-5 settings
      Amplitude 1.0V
Entry  Fri Jun 13 12:42:39 2025, CC, TD, Friday 13 June 2025 10x

13.42 ASIC settings 2025Jun12-13.53.04
      *all* FEE64s slow comparator 0x64
Entry  Thu Jun 12 13:15:25 2025, GB, CC, NK, MP, TD, Thursday 12 June 2025 Screenshot_from_2025-06-12_14-39-35.pngScreenshot_from_2025-06-12_14-33-26.png

EMC tests with NK (Orsay)
Entry  Tue Apr 8 08:52:39 2025, TD, AIDA grounding powerstax-ms1u_instructionmanua.pdf20250408_095624.jpg

AIDA DSSSDs and FEE64-DSSSD cabling are electrically isolated (by design) from snout, mounting rods and support assembly.
 FEE64-DSSSD ribbon cables screened by 3M 1245 Cu foil, drain wire to FEE64 adaptor PCB
Entry  Tue Mar 11 11:53:18 2025, TD, Monday 10 March 11x

18.30 AIDA powered up for brief test
Entry  Sat Feb 22 12:35:38 2025, TD, Offline analysis data files R9_85-R9_199 (84Mo setting) 22x

Start 00:43 22.2.25 https://elog.gsi.de/despec/G-24-00302/57
AIDA data file R9_85
Entry  Thu Feb 20 17:06:42 2025, JB, CC, TD,MP, WR error for aida 13,14,15,16 
WR timestamp errors resolved after reseating the HDMI cables to the MACB
Entry  Wed Feb 12 10:46:01 2025, TD, Offline analysis data files S181 R4_351-396  25x
Analysis data files R4_351-396

Entry  Fri Jan 31 17:26:47 2025, CC, TD, MP, Friday 31 January contd. 16x

18.18 bPlas and BB7 installs complete 
      Restart AIDA DAQ, Merger, Tape Server and re-test
Entry  Fri Jan 31 13:48:29 2025, JB, AIDA analysis from HI-DESPEC meeting 20.11.2024 
AIDA analysis and presentation by J. Bormans for AIDA made in the HISPEC-DESPEC collaboration meeting.

 

https://docs.google.com/presentation/d/1hlZ30r294UqbVKGy3jg-wompFpc7TSfD/edit?usp=sharing&ouid=102131181856760114019&rtpof=true&sd=true
Entry  Fri Jan 31 09:37:47 2025, CC, TD, MP, Friday 31 January 26x
Implantation stack mounted - BB18(DS)-1000 + bPlas + bPlas + 3x BB7(DS)-1000

N.B. aida02, aida09 & aida15 have grounded copper screen (3M 1245 - aluminimum braid to copper screen of ribbon cables) for Kapton PCBs connecting the
ELOG V3.1.3-7933898