AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 31 of 37  ELOG logo
Entry  Thu Aug 15 14:09:39 2019, NH, AIDA Waveforms 10x
Noise seemed less strong today, unsure of cause. I had re-taped snout as tape was not sticking well.

Figures 1-4: Waves for all 4 FEEs connected to the DSSD
Figures 5-8: Zoomed in on region 400-600
Entry  Thu Mar 21 13:59:08 2019, NH, AIDA Water 
The AIDA water system has been repaired and not leaking.

The interlock did not light immediately, but power cable reconnected to box and now it works.

 
Entry  Mon May 2 13:08:49 2022, NH, AIDA Updates 2 May elog_temps1.pngalpha_1d.png
The snout endcap has been sealed with new copper tape over the red tape

Observe significant drop in leakage current on DSSD #2 down to 7 uA (about 0.5 uA above DSSD #1) as it looked when the black cloth was on
    Reply  Tue May 3 14:15:17 2022, NH, AIDA Updates 2 May 

PAUSE/RESUME stats are dominated by 2x FEE64s - aida07 and aida16
Entry  Fri Dec 16 14:02:12 2022, NH, AIDA System off for christmas break 
The AIDA NIM crate, pis and workstation have been powered off for the Christmas break and will not be accessible
Entry  Mon Feb 1 15:19:07 2021, NH, AIDA Status Feb 2021 
01.02.2021 - Four new sets of PSU, HDMI & Ethernet cables were ran from the DESPEC rack to the AIDA frame, in preparation for 4 new FEE64s.
A new 7 port USB hub has also been placed for the last few serial connections.
    Reply  Sat Feb 6 10:45:55 2021, NH, AIDA Status Feb 2021 pregrd050222_E.pngpregrd050221_O.pngpostgrd050221_O.pngpostgrd050221_E.png
> 01.02.2021 - Four new sets of PSU, HDMI & Ethernet cables were ran from the DESPEC rack to the AIDA frame, in preparation for 4 new FEE64s.
> A new 7 port USB hub has also been placed for the last few serial connections.
Entry  Fri Mar 22 13:32:55 2019, NH, AIDA Startup @ 22.03.2019 20190323Bias.png20190322FEETemps.png
FEEs have been on this morning, temperatures attached

Leakage current attached

the DSSD is attached to the following AIDA modules:
Entry  Wed May 22 20:10:19 2024, NH, CC, HMA, MV, ZC, KZ, AIDA Snout Remounted 9x
AIDA and the Snout have been remounted in S4

I had a check of the AIDA connectors and all looked good, the kapton PCB connectors were sitting comfortably above the interstage and I saw no stressed/loose
Entry  Tue Aug 30 13:48:32 2022, NH, AIDA Single Switch Configuration 
The second switch was moved back to CARME so AIDA has been configured back to using a single switch

aida02/aida04/aida06/aida08 updated back to first switch as per https://elog.ph.ed.ac.uk/DESPEC/433
Entry  Wed Mar 20 15:35:10 2019, NH, AIDA Setup @ GSI 
Currently

- 1 DSSD and Plastic is in the AIDA snout, which is not mounted

- The FEEs are offline due to a water supply issue, this will be repaired early 21/03/2019
Entry  Mon Feb 22 18:18:47 2021, NH, AIDA Rates/Situation  8x
The ground cable (LEMO00) in aida07 was disconnected, it has been reinserted and the waveforms now look good.

(All data below taken with thresholds 0xA for all)
    Reply  Sat Feb 27 12:47:57 2021, NH, AIDA Rates/Situation  10x
Updated figures as of 27 Feb 2021 - S4 is now closed for experiments but may open on Wednesday.
Snout has been grounded and all FEEs are seemingly grounded properly.
Entry  Mon Apr 8 10:23:16 2024, TD, JB, AIDA Noise optimisation 30x
In the morning we reinstalled FEE64s aida06, aida13, aida07. The rails of the FEE64 boards were found to be incorrect (that of the rails that were used
in CARME).

After replacing the rails on the abovementioned FEE64s we powercycled AIDA and found the following results in the histograms and statistics.
Entry  Fri Mar 4 08:40:36 2022, OH, NH, AIDA Noise and grounding tests 3rd March - Results 9x
Grounding implemented


Each FEE given direct connection to heavy duty earth bar via adaptor board lemo ground
Earth bars
are then connected to platform ground on AIDA frame
Photo of grounding - attachment 1
Improvements not as large as expected from
previous experience though

Particularly in the n+n side where widths still appear awful


While implementing the
Entry  Thu Mar 3 08:45:03 2022, OH, NH, AIDA Noise and grounding tests 3rd March 8x
Pulser spectra


Changes to the nn pulser circuit yesterday have improved the peak widths on the p+n side
p+n peak widths
averact around 100 channels
n+n around 1000 at 0xa threshold
n+n 1.8.L spectra - attachment 1
p+n 1.8.L spectra attachment
2


p+n peak widths




    Reply  Mon Jan 20 14:01:23 2020, NH, AIDA Noise 20.01.2019 6x
> Checking noise

> DESPEC crate entirely offline except:
Entry  Fri Feb 14 12:50:29 2020, NH, AIDA Noise 14.02.2020 6x
Electricians changed the grounding for the DESPEC platform to a large pillar that goes deep into soil

Change in grounding was apparently successful at reducing the noise complaints in Cave C (R3B)
Entry  Wed Jan 15 14:53:41 2020, NH, AIDA Noise 14.01.2019 6x
Checking noise

DESPEC crate entirely offline except:
Entry  Wed Oct 20 13:26:08 2021, NH, OH, AIDA Noise + Filtering 6x
Turn on AIDA (SL6) to investigate noise situation and impact of new RC filters on bias input

Current setup:
ELOG V3.1.3-7933898