Entry  Wed Jan 8 10:08:29 2025, JB, GB, SD, MP, CC, JG, AIDA noise test with platform in position Screenshot_from_2025-01-09_09-32-08.pngScreenshot_from_2025-01-09_09-35-11.pngScreenshot_from_2025-01-09_09-32-20.pngScreenshot_from_2025-01-09_09-31-58.png
Yesterday we spent time essentially performing a dry run to get AIDA DAQ and bPlast into the time sorter, there were some issues with the AIDA mbs PC
x86l-119 which was related to some boot issue, it was booting to a newer version of debian while the Relay for AIDA to MBS is on an older version (scratch)
(the machine is quite old). We spent a bit of time getting the thresholds correct for each of the ASICs. In the end we just elected to have a blanket level
Entry  Tue Apr 8 08:52:39 2025, TD, AIDA grounding powerstax-ms1u_instructionmanua.pdf20250408_095624.jpg

AIDA DSSSDs and FEE64-DSSSD cabling are electrically isolated (by design) from snout, mounting rods and support assembly.
 FEE64-DSSSD ribbon cables screened by 3M 1245 Cu foil, drain wire to FEE64 adaptor PCB
Entry  Thu Sep 20 09:39:17 2018, TD, AIDA downstream window 

The AIDA downstream window ('endcap' of snout) consists of 2x 50um aluminized mylar sheets
Entry  Thu May 12 10:10:51 2022, TD, OH, AIDA data throughput 15x

Attachment 1 - top aida06
Entry  Sat May 7 13:27:39 2022, TD, AIDA configuration 

Adaptor PCB link settings
Entry  Fri Jan 31 13:48:29 2025, JB, AIDA analysis from HI-DESPEC meeting 20.11.2024 
AIDA analysis and presentation by J. Bormans for AIDA made in the HISPEC-DESPEC collaboration meeting.

 

https://docs.google.com/presentation/d/1hlZ30r294UqbVKGy3jg-wompFpc7TSfD/edit?usp=sharing&ouid=102131181856760114019&rtpof=true&sd=true
Entry  Thu Aug 15 14:09:39 2019, NH, AIDA Waveforms 10x
Noise seemed less strong today, unsure of cause. I had re-taped snout as tape was not sticking well.

Figures 1-4: Waves for all 4 FEEs connected to the DSSD
Figures 5-8: Zoomed in on region 400-600
Entry  Thu Mar 21 13:59:08 2019, NH, AIDA Water 
The AIDA water system has been repaired and not leaking.

The interlock did not light immediately, but power cable reconnected to box and now it works.

 
Entry  Mon May 2 13:08:49 2022, NH, AIDA Updates 2 May elog_temps1.pngalpha_1d.png
The snout endcap has been sealed with new copper tape over the red tape

Observe significant drop in leakage current on DSSD #2 down to 7 uA (about 0.5 uA above DSSD #1) as it looked when the black cloth was on
    Reply  Tue May 3 14:15:17 2022, NH, AIDA Updates 2 May 

PAUSE/RESUME stats are dominated by 2x FEE64s - aida07 and aida16
Entry  Fri Dec 16 14:02:12 2022, NH, AIDA System off for christmas break 
The AIDA NIM crate, pis and workstation have been powered off for the Christmas break and will not be accessible
Entry  Mon Feb 1 15:19:07 2021, NH, AIDA Status Feb 2021 
01.02.2021 - Four new sets of PSU, HDMI & Ethernet cables were ran from the DESPEC rack to the AIDA frame, in preparation for 4 new FEE64s.
A new 7 port USB hub has also been placed for the last few serial connections.
    Reply  Sat Feb 6 10:45:55 2021, NH, AIDA Status Feb 2021 pregrd050222_E.pngpregrd050221_O.pngpostgrd050221_O.pngpostgrd050221_E.png
> 01.02.2021 - Four new sets of PSU, HDMI & Ethernet cables were ran from the DESPEC rack to the AIDA frame, in preparation for 4 new FEE64s.
> A new 7 port USB hub has also been placed for the last few serial connections.
Entry  Fri Mar 22 13:32:55 2019, NH, AIDA Startup @ 22.03.2019 20190323Bias.png20190322FEETemps.png
FEEs have been on this morning, temperatures attached

Leakage current attached

the DSSD is attached to the following AIDA modules:
Entry  Wed May 22 20:10:19 2024, NH, CC, HMA, MV, ZC, KZ, AIDA Snout Remounted 9x
AIDA and the Snout have been remounted in S4

I had a check of the AIDA connectors and all looked good, the kapton PCB connectors were sitting comfortably above the interstage and I saw no stressed/loose
Entry  Tue Aug 30 13:48:32 2022, NH, AIDA Single Switch Configuration 
The second switch was moved back to CARME so AIDA has been configured back to using a single switch

aida02/aida04/aida06/aida08 updated back to first switch as per https://elog.ph.ed.ac.uk/DESPEC/433
Entry  Wed Mar 20 15:35:10 2019, NH, AIDA Setup @ GSI 
Currently

- 1 DSSD and Plastic is in the AIDA snout, which is not mounted

- The FEEs are offline due to a water supply issue, this will be repaired early 21/03/2019
Entry  Mon Feb 22 18:18:47 2021, NH, AIDA Rates/Situation  8x
The ground cable (LEMO00) in aida07 was disconnected, it has been reinserted and the waveforms now look good.

(All data below taken with thresholds 0xA for all)
    Reply  Sat Feb 27 12:47:57 2021, NH, AIDA Rates/Situation  10x
Updated figures as of 27 Feb 2021 - S4 is now closed for experiments but may open on Wednesday.
Snout has been grounded and all FEEs are seemingly grounded properly.
Entry  Mon Apr 8 10:23:16 2024, TD, JB, AIDA Noise optimisation 30x
In the morning we reinstalled FEE64s aida06, aida13, aida07. The rails of the FEE64 boards were found to be incorrect (that of the rails that were used
in CARME).

After replacing the rails on the abovementioned FEE64s we powercycled AIDA and found the following results in the histograms and statistics.