64
|
Thu Aug 15 14:09:39 2019 |
NH | AIDA Waveforms | Noise seemed less strong today, unsure
of cause. I had re-taped snout as tape was
not sticking well. |
10x |
|
28
|
Thu Mar 21 13:59:08 2019 |
NH | AIDA Water | The AIDA water system has been repaired
and not leaking.
The interlock did not light immediately, |
|
|
418
|
Mon May 2 13:08:49 2022 |
NH | AIDA Updates 2 May | The snout endcap has been sealed with new
copper tape over the red tape
|
 |
|
419
|
Tue May 3 14:15:17 2022 |
NH | AIDA Updates 2 May |
PAUSE/RESUME stats are dominated by 2x FEE64s
- aida07 and aida16
|
|
|
516
|
Fri Dec 16 14:02:12 2022 |
NH | AIDA System off for christmas break | The AIDA NIM crate, pis and workstation have
been powered off for the Christmas break
and will not be accessible |
|
|
163
|
Mon Feb 1 15:19:07 2021 |
NH | AIDA Status Feb 2021 | 01.02.2021 - Four new sets of PSU, HDMI &
Ethernet cables were ran from the DESPEC
rack to the AIDA frame, in preparation for |
|
|
164
|
Sat Feb 6 10:45:55 2021 |
NH | AIDA Status Feb 2021 | > 01.02.2021 - Four new sets of PSU, HDMI
& Ethernet cables were ran from the DESPEC
rack to the AIDA frame, in preparation for |
   |
|
31
|
Fri Mar 22 13:32:55 2019 |
NH | AIDA Startup @ 22.03.2019 | FEEs have been on this morning, temperatures
attached
Leakage current attached |
 |
|
632
|
Wed May 22 20:10:19 2024 |
NH, CC, HMA, MV, ZC, KZ | AIDA Snout Remounted | AIDA and the Snout have been remounted in
S4
|
9x |
|
511
|
Tue Aug 30 13:48:32 2022 |
NH | AIDA Single Switch Configuration | The second switch was moved back to CARME
so AIDA has been configured back to using
a single switch
|
|
|
27
|
Wed Mar 20 15:35:10 2019 |
NH | AIDA Setup @ GSI | Currently
- 1 DSSD and Plastic is in the
AIDA snout, which is not mounted |
|
|
166
|
Mon Feb 22 18:18:47 2021 |
NH | AIDA Rates/Situation | The ground cable (LEMO00) in aida07 was disconnected,
it has been reinserted and the waveforms
now look good.
|
8x |
|
167
|
Sat Feb 27 12:47:57 2021 |
NH | AIDA Rates/Situation | Updated figures as of 27 Feb 2021 - S4 is
now closed for experiments but may open on
Wednesday.
|
10x |
|
564
|
Mon Apr 8 10:23:16 2024 |
TD, JB | AIDA Noise optimisation | In the morning we reinstalled FEE64s aida06,
aida13, aida07. The rails of the FEE64 boards
were found to be incorrect (that of the rails |
30x |
|
402
|
Fri Mar 4 08:40:36 2022 |
OH, NH | AIDA Noise and grounding tests 3rd March - Results | Grounding implemented
Each
FEE given direct connection to heavy duty
earth bar via adaptor board lemo ground
Earth |
9x |
|
401
|
Thu Mar 3 08:45:03 2022 |
OH, NH | AIDA Noise and grounding tests 3rd March | Pulser spectra
Changes
to the nn pulser circuit yesterday have improved
the peak widths on the p+n side
p+n |
8x |
|
121
|
Mon Jan 20 14:01:23 2020 |
NH | AIDA Noise 20.01.2019 | > Checking noise
>
> DESPEC crate entirely offline except:
|
6x |
|
125
|
Fri Feb 14 12:50:29 2020 |
NH | AIDA Noise 14.02.2020 | Electricians changed the grounding for the
DESPEC platform to a large pillar that goes
deep into soil
|
6x |
|
120
|
Wed Jan 15 14:53:41 2020 |
NH | AIDA Noise 14.01.2019 | Checking noise
DESPEC crate entirely offline except:
|
6x |
|
385
|
Wed Oct 20 13:26:08 2021 |
NH, OH | AIDA Noise + Filtering | Turn on AIDA (SL6) to investigate noise situation
and impact of new RC filters on bias input
|
6x |