  64   Thu Aug 15 14:09:39 2019 NHAIDA WaveformsNoise seemed less strong today, unsure
of cause. I had re-taped snout as tape was
not sticking well.
 10x 
  28   Thu Mar 21 13:59:08 2019 NHAIDA WaterThe AIDA water system has been repaired
and not leaking.

The interlock did not light immediately,
  
  418   Mon May 2 13:08:49 2022 NHAIDA Updates 2 MayThe snout endcap has been sealed with new
copper tape over the red tape
 elog_temps1.pngalpha_1d.png 
  419   Tue May 3 14:15:17 2022 NHAIDA Updates 2 May
PAUSE/RESUME stats are dominated by 2x FEE64s
- aida07 and aida16
  
  516   Fri Dec 16 14:02:12 2022 NHAIDA System off for christmas breakThe AIDA NIM crate, pis and workstation have
been powered off for the Christmas break
and will not be accessible
  
  163   Mon Feb 1 15:19:07 2021 NHAIDA Status Feb 202101.02.2021 - Four new sets of PSU, HDMI &
Ethernet cables were ran from the DESPEC
rack to the AIDA frame, in preparation for
  
  164   Sat Feb 6 10:45:55 2021 NHAIDA Status Feb 2021> 01.02.2021 - Four new sets of PSU, HDMI
& Ethernet cables were ran from the DESPEC
rack to the AIDA frame, in preparation for
 pregrd050222_E.pngpregrd050221_O.pngpostgrd050221_O.pngpostgrd050221_E.png 
  31   Fri Mar 22 13:32:55 2019 NHAIDA Startup @ 22.03.2019FEEs have been on this morning, temperatures
attached

Leakage current attached
 20190323Bias.png20190322FEETemps.png 
  632   Wed May 22 20:10:19 2024 NH, CC, HMA, MV, ZC, KZAIDA Snout RemountedAIDA and the Snout have been remounted in
S4
 9x 
  511   Tue Aug 30 13:48:32 2022 NHAIDA Single Switch ConfigurationThe second switch was moved back to CARME
so AIDA has been configured back to using
a single switch
  
  27   Wed Mar 20 15:35:10 2019 NHAIDA Setup @ GSICurrently

- 1 DSSD and Plastic is in the
AIDA snout, which is not mounted
  
  166   Mon Feb 22 18:18:47 2021 NHAIDA Rates/Situation The ground cable (LEMO00) in aida07 was disconnected,
it has been reinserted and the waveforms
now look good.
 8x 
  167   Sat Feb 27 12:47:57 2021 NHAIDA Rates/Situation Updated figures as of 27 Feb 2021 - S4 is
now closed for experiments but may open on
Wednesday.
 10x 
  564   Mon Apr 8 10:23:16 2024 TD, JBAIDA Noise optimisationIn the morning we reinstalled FEE64s aida06,
aida13, aida07. The rails of the FEE64 boards
were found to be incorrect (that of the rails
 30x 
  402   Fri Mar 4 08:40:36 2022 OH, NHAIDA Noise and grounding tests 3rd March - ResultsGrounding implemented


Each
FEE given direct connection to heavy duty
earth bar via adaptor board lemo ground
Earth
 9x 
  401   Thu Mar 3 08:45:03 2022 OH, NHAIDA Noise and grounding tests 3rd MarchPulser spectra


Changes
to the nn pulser circuit yesterday have improved
the peak widths on the p+n side
p+n
 8x 
  121   Mon Jan 20 14:01:23 2020 NHAIDA Noise 20.01.2019> Checking noise

> DESPEC crate entirely offline except:
 6x 
  125   Fri Feb 14 12:50:29 2020 NHAIDA Noise 14.02.2020Electricians changed the grounding for the
DESPEC platform to a large pillar that goes
deep into soil
 6x 
  120   Wed Jan 15 14:53:41 2020 NHAIDA Noise 14.01.2019Checking noise

DESPEC crate entirely offline except:
 6x 
  385   Wed Oct 20 13:26:08 2021 NH, OHAIDA Noise + FilteringTurn on AIDA (SL6) to investigate noise situation
and impact of new RC filters on bias input
 6x 