AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
DESPEC, Page 31 of 35
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
687 Entries
Goto page
Previous
1
,
2
,
3
...
30
, 31,
32
,
33
,
34
,
35
Next
Selected entries:
ID
Date
Author
Subject
Text
425
Sun May 8 17:43:57 2022
NH
AIDA FEE64 Layout
AIDA FEE64 layout with respect to the beam.
532
Sun Mar 10 17:08:12 2024
NH
AIDA FEE Layout + Cabling Plan for S100
Proposed FEE numbering and wiring plan for
upcoming experiment S100 (2x Wide DSSSDs)
509
Wed Jun 29 10:48:26 2022
NH, OH
AIDA Dismounted
All detectors removed from single and triple
AIDA snouts
334
Wed May 19 20:02:27 2021
NH
AIDA Dead Time Analysis
Some plots of AIDA dead time (From PAUSE/RESUME
data items) against time.
6x
373
Tue Jun 22 13:01:19 2021
NH
AIDA Data on lustre
The following runs are now copied to lustre
If necessary they can be removed from AIDA
HDDs for space.
225
Fri Apr 16 00:47:36 2021
OH-ML
AIDA DAQ Reset
1:18 (CET) No rate in AIDA 07.
Oscar did a AIDA DAQ reset and
a quick wide check.
270
Sat Apr 24 03:13:05 2021
ML
AIDA DAQ Reset
AIDA PC crashe completely at ~3:30am CET.
Tom was called and he Restarted
the AIDA system at ~4am with Run 52.
393
Tue Feb 1 15:00:28 2022
NH
AIDA CentOS 7 Startup
Starting up AIDA on CentOS 7 to confirm things
work (based on some CARME experience)
67
Mon Oct 28 17:02:11 2019
TD
AIDA @ DESPEC cable length estimates
AIDA snout length 37cm (from end of AIDA snout
support assembly)
420
Wed May 4 16:50:04 2022
NH
AIDA 4th May
bPlas has been mostly cabled in now
Reseat LAN cable (AIDA Switch -> AIDA-3)
415
Wed Apr 27 15:47:46 2022
NH, HA, SA, CJ
AIDA 27 Apr 22
Remount snout in S4 (photos to come)
Alignment with DEGAS OK but a bit short...
DEGAS platform will be brought 31 mm closer
7x
289
Sat May 1 08:45:19 2021
TD
AIDA 24cm x 8cm DSSSD + triPlast assembly for S496
Photos provided by Nic Hubbard and Helena
Albers from the assembly of 2x triPlast
12x
107
Mon Dec 16 14:48:02 2019
NH TD
AIDA 16.12.19
DSSD Snout was reassembled to install the
second bPlast (downstream)
(fig 1)
60
Tue Aug 13 09:17:02 2019
NH
AIDA 12/08/2019
The other 6 FEEs were powered on one at
a time to check no issues. None found.
All 12 FEEs plugged back into the
55
Mon Jul 1 09:42:16 2019
NH
AIDA - 01/07/2019
Water is still off.
Checked dewpoint sensor still flashing
red light (indicating an error). Pipes warmed.
653
Tue Jun 11 20:20:36 2024
TD
ADC data rates from 09.00 11.6.24
Per NH
"From ELOG (assuming times accurateish)
33
Fri Mar 22 14:31:24 2019
NH
A few more setup notes I forgot
Extra FEE information:
HV braid (0 V) goes into FEE10
(beam left) with LK1 jumper
105
Sat Dec 7 02:39:02 2019
DK, NH et al.
34Si Fragments PID
See attached
Tentative PID (DK) as attachment #3
477
Wed Jun 1 08:00:18 2022
TD
2xDSSSDs spectra layouts
Spectra layouts for 2x DSSSDs can be found
in directory ~/LayOut/2xDSSSDs
436
Fri May 13 00:50:16 2022
ML
2h-Shift Checks
All seems ok (apart for my virgin
network connection usually quite reliable
but not so tonight !?!).
Goto page
Previous
1
,
2
,
3
...
30
, 31,
32
,
33
,
34
,
35
Next
ELOG V3.1.4-unknown