AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 31 of 35  ELOG logo
  ID Date Author Subjectdown Text Attachments
  425   Sun May 8 17:43:57 2022 NHAIDA FEE64 LayoutAIDA FEE64 layout with respect to the beam.  AIDA_Adapter_Configuration(1).png 
  532   Sun Mar 10 17:08:12 2024 NHAIDA FEE Layout + Cabling Plan for S100Proposed FEE numbering and wiring plan for
upcoming experiment S100 (2x Wide DSSSDs)
 AIDA_S100_WiringPlan.drawio.pngAIDA_S100_WiringPlan.drawioAIDA_S100_WiringPlan(1).drawioAIDA_S100_WiringPlan.drawio.png 
  509   Wed Jun 29 10:48:26 2022 NH, OHAIDA DismountedAll detectors removed from single and triple
AIDA snouts
  
  334   Wed May 19 20:02:27 2021 NHAIDA Dead Time AnalysisSome plots of AIDA dead time (From PAUSE/RESUME
data items) against time.
 6x 
  373   Tue Jun 22 13:01:19 2021 NHAIDA Data on lustreThe following runs are now copied to lustre
If necessary they can be removed from AIDA
HDDs for space.
  
  225   Fri Apr 16 00:47:36 2021 OH-MLAIDA DAQ Reset1:18 (CET) No rate in AIDA 07.

Oscar did a AIDA DAQ reset and
a quick wide check.
  
  270   Sat Apr 24 03:13:05 2021 MLAIDA DAQ ResetAIDA PC crashe completely at ~3:30am CET.

Tom was called and he Restarted
the AIDA system at ~4am with Run 52.
  
  393   Tue Feb 1 15:00:28 2022 NHAIDA CentOS 7 StartupStarting up AIDA on CentOS 7 to confirm things
work (based on some CARME experience)
  
  67   Mon Oct 28 17:02:11 2019 TDAIDA @ DESPEC cable length estimatesAIDA snout length 37cm (from end of AIDA snout
support assembly)
  
  420   Wed May 4 16:50:04 2022 NHAIDA 4th MaybPlas has been mostly cabled in now

Reseat LAN cable (AIDA Switch -> AIDA-3)
 Screenshot_20220504_174929.pngScreenshot_20220504_175201.png 
  415   Wed Apr 27 15:47:46 2022 NH, HA, SA, CJAIDA 27 Apr 22Remount snout in S4 (photos to come) 
Alignment with DEGAS OK but a bit short...
 DEGAS platform will be brought 31 mm closer
 7x 
  289   Sat May 1 08:45:19 2021 TDAIDA 24cm x 8cm DSSSD + triPlast assembly for S496
Photos provided by Nic Hubbard and Helena
Albers from the assembly of 2x triPlast
 12x 
  107   Mon Dec 16 14:48:02 2019 NH TDAIDA 16.12.19DSSD Snout was reassembled to install the
second bPlast (downstream) 
 (fig 1)
 20191213_103710.jpg161219_aida_DSSDs.png161219_rates.png161219_aida0855.pngmidasmessage131219.png 
  60   Tue Aug 13 09:17:02 2019 NHAIDA 12/08/2019The other 6 FEEs were powered on one at
a time to check no issues. None found.
All 12 FEEs plugged back into the
 AIDATemps-1208191457.png 
  55   Mon Jul 1 09:42:16 2019 NHAIDA - 01/07/2019Water is still off.

Checked dewpoint sensor still flashing
red light (indicating an error). Pipes warmed.
  
  653   Tue Jun 11 20:20:36 2024 TDADC data rates from 09.00 11.6.24Per NH

"From ELOG (assuming times accurateish)
  
  33   Fri Mar 22 14:31:24 2019 NHA few more setup notes I forgotExtra FEE information:

HV braid (0 V) goes into FEE10
(beam left) with LK1 jumper
 20190322_132528s.jpg20190319_131821s.jpg20190313_161102s.jpg20190313_155418s.jpg 
  105   Sat Dec 7 02:39:02 2019 DK, NH et al.34Si Fragments PIDSee attached

Tentative PID (DK) as attachment #3
 2019-12-07-PID.png59_AM.pngpid.pngAr-300_S4_updated_matter_DEPSEC_34Si.lpp 
  477   Wed Jun 1 08:00:18 2022 TD2xDSSSDs spectra layouts
Spectra layouts for 2x DSSSDs can be found
in directory ~/LayOut/2xDSSSDs
  
  436   Fri May 13 00:50:16 2022 ML2h-Shift ChecksAll seems ok  (apart for my virgin
network connection usually quite reliable
but not so tonight !?!).
 Stats_Screenshot_from_2022-05-13_01-45-56.pngTemp_Screenshot_from_2022-05-13_01-47-31.pngHV_LC_Screenshot_from_2022-05-13_01-48-21.png 
ELOG V3.1.4-unknown