AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DTAS  ELOG logo
Message ID: 101     Entry time: Fri Jun 7 08:47:17 2019
Author: Jorge, Alvaro, Tom, Sunghan, Ale 
Subject: Co source, test of AIDA/TAS syncronization 

Start: 16:50

Stop: 17:28

Root: 201906071728_60Co_AIDA_in.root

Comment: 60Co source on top of AIDA (red box, key 3). It is positioned on a plastic ruler in the center of the DTAS.

File Number Aida: R18 (_0 should not be used, reset of the time stamp was done during this file). R18_1 started at 16:57, last file R18_4

File Number DTAS: 245,247

201906071650_60Co_AIDA_245.dlt,... 201906071650_60Co_AIDA_247.dlt

After checking the shifts in gain, it seems that for most of the detectors the dynode and anode signal moved in the same direction with the exception of detector 13 (dynode and anode do not move

equally, so probably there is a cable problem here, probably in the Dynode 13 or preamp problem)

Edit 13/06/19 Oscar Hall

The low energy channels of AIDA have been gain matched. Attached is the energy plot of the x and y side strops in AIDA.

Attachment 1: 201906071728_60Co_AIDA_in.root  1.351 MB  Uploaded Fri Jun 7 10:32:26 2019
Attachment 2: Screenshot_from_2019-06-07_17-09-21.png  36 kB  Uploaded Fri Jun 7 10:45:00 2019  | Hide | Hide all
Screenshot_from_2019-06-07_17-09-21.png
Attachment 3: gainMatchSi.png  24 kB  Uploaded Thu Jun 13 03:06:52 2019  | Hide | Hide all
gainMatchSi.png
ELOG V3.1.4-unknown