AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  EDI_PSA  ELOG logo
Message ID: 30     Entry time: Fri Jun 16 10:42:38 2023
Author: Lucia B, Federico F 
Subject: Powercut during long run on LNL9 - end of shift 

On 15/06/2023 morning, around 6:32 am, a powercut caused failure in the Compresed Air Pressure system. Faraday cup was closed by the interlock and the HV was turned off.

We turned off the accelerator, dismounted LNL9 (pictures attached) and mounted Ta1 Edi backing. We left only ACP28 pump on. We also switched off GeBo HV and its cryocooler.

All details can be found in the excel sheet attached to entry 24.

Attachment 1: LNL9_front.jpg  204 kB  Uploaded Fri Jun 16 11:46:33 2023  | Hide | Hide all
LNL9_front.jpg
Attachment 2: LNL9_back.jpg  135 kB  Uploaded Fri Jun 16 11:46:48 2023  | Hide | Hide all
LNL9_back.jpg
ELOG V3.1.4-unknown