AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE  ELOG logo
Message ID: 113     Entry time: Sat Nov 11 20:27:28 2017
Author: TD, DK, RG, MB 
Subject: Run 100 
Header: Continue CH2 at 4.0 MeV/u
Ender: 
====================================================
Run number			: 100
Date				: 11 / 11 / 2017
Start time			: 21:28
Stop time			: 00:27 
Trigger rate (MIDAS)	        : 6
Blocks written		        : 784
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Run Scalars (approx rates)
0- Ungated                      : 4
1- Gated                        : 4
2- dE                           : 150k
3- E                            : 20
4- HI                           : 556
5- Pulser                       : 1
6- Clock			: 968
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy (MeV/u)		: 4.0 MeV/u (nominal)
Beam intensity (epA)	        : 1.75
Target				: CH2 30+25
Ladder position	(mm)	        : 67.26
HI Degrader foil (um)		: 10 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V)		: -40
del_E leakage (uA)		: 0.68
E voltage (V)			: -350
E leakage (uA)		        : 2.10
E_hi voltage (V)		: -14
E_hi leakage (uA)		: 2.59
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (Up, positive)	(A)	: 1.55
PA power (Up, negative) (A)     : 0.55
PA power (Down, positive) (A)	: 0.8
PA power (Down, negative) (A)   : 0.25
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1)	(mbar)	        : 6.8 x 10^-6
Pressure (old gauge) (mbar)     : 1.9 x 10^-5
Pressure (SEC)	(mbar)         	: 3.8 x 10^-6
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller)	deg	        : -9.9
Temp (chamber)	deg	        : 6.0
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: At 21:57, we are notified by RILIS team that they would like to do some cleaning and laser maintenance before leaving for the night.  It should take 15 minutes.  We 
will watch the scalars but continue the run.  22:14 beam is off.  22:18 the laser tuning is finished.  
====================================================
ELOG V3.1.4-unknown