NB: This list may be incomplete!

CERN side: 

     Beam operators hope for a FC which can be automated at the end of SEC: Olof ?

     Gain resistors (and other items) sent to CERN.  Where are they?  KJ has them? Check with Karl

     w26 PC needs to get online.  Contact Olof when we return to ISOLDE to confirm the network port is still free.
Daid. Need to register the device to CERN

     Dry N2 bottle: ask Karl

Edinburgh side:

     Iris automated controls and mounts: in construction. Add additional stop so doesnt close all the way. Peter

     Cooling line chamber feed through: get spare. Peter
 
     Get Al degrader foil for heavy ions (~13 um), mount on dummy frame etc. probably fine from store. Should get 15
um for highest beam energy. With lowest beam energy we might need to change the foil: Daid

     Alpha spectral analysis: to be sorted. Daid, Claudia, Tom, Ruchi

     Sort routines for dE-E plots, etc, for online analysis: Tom

     Photo diodes x2 along with degrader foil: PCB for photodeiodes, PCB for photodiodes. extra holes for ladder. Peter

     Target ladder config finalization: 2 photodiodes, collimator (what size, we have 3 mm and 10mm), Beam viewer,
We need to verify how many positions we have. Need at least 2 CH2 and 1 Carbon. Daid, Claudia

     Extra ribbon cables are needed? need to check with calibration. Also need long ribbon cables

     Beam viewer: see target ladder

     Faraday cup SHV to SMA converter: Peter

     Window port for front of chamber? Peter

     Photographs and diagrams of experimental setup -- organized clearly for beam operators during tuning: add
technical drawing on elog. 

     Alignment -- 2 end caps and one target ladder mount for optics reflector (8 mm diameter?) For survey people. Peter

     Adjustable feet to be produced for radial alignment: Peter / Toby

     Contact CERN about date for beam connection: As soon as possible after 20th October. Talk to Karl/Olof. 

     Collimator at exit of SEC ? needs to be aligned. Ask what the other beamlines do - does olof have collimator
ahead of his chamber

     Calibration of Target ladder positions. Peter / Daid


Email to Karl & Olof about:
- FC after SEC
- Parcel of gain resistors
- date for connection of SEC to our chamber
- collimator in front of chamber ?
- N2 bottle
ELOG V3.1.4-unknown