NB: This list may be incomplete!
CERN side:
Beam operators hope for a FC which can be automated at the end of SEC: Olof ?
Gain resistors (and other items) sent to CERN. Where are they? KJ has them? Check with Karl
w26 PC needs to get online. Contact Olof when we return to ISOLDE to confirm the network port is still free.
Daid. Need to register the device to CERN
Dry N2 bottle: ask Karl
Edinburgh side:
Iris automated controls and mounts: in construction. Add additional stop so doesnt close all the way. Peter
Cooling line chamber feed through: get spare. Peter
Get Al degrader foil for heavy ions (~13 um), mount on dummy frame etc. probably fine from store. Should get 15
um for highest beam energy. With lowest beam energy we might need to change the foil: Daid
Alpha spectral analysis: to be sorted. Daid, Claudia, Tom, Ruchi
Sort routines for dE-E plots, etc, for online analysis: Tom
Photo diodes x2 along with degrader foil: PCB for photodeiodes, PCB for photodiodes. extra holes for ladder. Peter
Target ladder config finalization: 2 photodiodes, collimator (what size, we have 3 mm and 10mm), Beam viewer,
We need to verify how many positions we have. Need at least 2 CH2 and 1 Carbon. Daid, Claudia
Extra ribbon cables are needed? need to check with calibration. Also need long ribbon cables
Beam viewer: see target ladder
Faraday cup SHV to SMA converter: Peter
Window port for front of chamber? Peter
Photographs and diagrams of experimental setup -- organized clearly for beam operators during tuning: add
technical drawing on elog.
Alignment -- 2 end caps and one target ladder mount for optics reflector (8 mm diameter?) For survey people. Peter
Adjustable feet to be produced for radial alignment: Peter / Toby
Contact CERN about date for beam connection: As soon as possible after 20th October. Talk to Karl/Olof.
Collimator at exit of SEC ? needs to be aligned. Ask what the other beamlines do - does olof have collimator
ahead of his chamber
Calibration of Target ladder positions. Peter / Daid
Email to Karl & Olof about:
- FC after SEC
- Parcel of gain resistors
- date for connection of SEC to our chamber
- collimator in front of chamber ?
- N2 bottle |