Header: Restart 5.0 MeV/u CH2 with 3 PS rings.
Ender: Stop run. We want good data with a smaller file size for fast analysis, as well as to get on a 2 hour schedule.
====================================================
Run number : 51
Date : 8 Nov 2017
Start time : 22:44
Stop time : 00:04
Trigger rate (MIDAS) : 2192
Blocks written : 20460
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy : 5.0 MeV/u
Beam intensity : (was 6 x 10^5, but we have only 3 /4 PS-Booster rings)
Target : #2 CH2_16
Ladder position : 127.95
Degrader foil (um) : 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V) : -33
del_E leakage (uA) : 0.00
E voltage (V) : -350
E leakage (uA) : 1.87
E_hi voltage (V) : -14
E_hi leakage (uA) : 0.83
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1) : 8.25 x 10^-6 mbar
Pressure (old gauge) : 2.6 x 10^-5 mbar
Pressure (SEC) : 4.3 x 10^-6 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller) : -9.8
Temp (chamber) : +6.0
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Only 3 out of 4 rings at PS-Booster for now
(We stopped slightly from miscommunication.)
23:34: PS-Booster calls. Trying to add Ring 1 back. By 23:36 we can see all four rings. (In one supercycle, all rings drop.)
==================================================== |