AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE  ELOG logo
Message ID: 50     Entry time: Wed Nov 8 22:08:55 2017
Author: Daid 
Subject: Run 51 
Header: Restart 5.0 MeV/u CH2 with 3 PS rings.
Ender: Stop run.  We want good data with a smaller file size for fast analysis, as well as to get on a 2 hour schedule.
====================================================
Run number			: 51
Date				: 8 Nov 2017
Start time			: 22:44
Stop time			: 00:04
Trigger rate (MIDAS)	        : 2192
Blocks written		        : 20460
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy			: 5.0 MeV/u
Beam intensity		        : (was 6 x 10^5, but we have only 3 /4 PS-Booster rings)
Target				: #2 CH2_16
Ladder position		        : 127.95
Degrader foil (um)		: 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V)		: -33
del_E leakage (uA)		: 0.00
E voltage (V)			: -350
E leakage (uA)		        : 1.87
E_hi voltage (V)		: -14
E_hi leakage (uA)		: 0.83
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1)		        : 8.25 x 10^-6 mbar
Pressure (old gauge)	        : 2.6 x 10^-5 mbar
Pressure (SEC)		        : 4.3 x 10^-6 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller)		        : -9.8
Temp (chamber)		        : +6.0
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: Only 3 out of 4 rings at PS-Booster for now
(We stopped slightly from miscommunication.)
23:34: PS-Booster calls.  Trying to add Ring 1 back.  By 23:36 we can see all four rings.  (In one supercycle, all rings drop.)
====================================================
ELOG V3.1.4-unknown