Message ID: 56     Entry time: Thu Nov 9 03:32:55 2017
Author: Daid. Mirco 
Subject: Run 55 
Header: Continue 5.0 MeV/u with CH2 after target re-heating
Ender: End
====================================================
Run number			: 55
Date				: 9 Nov 2017
Start time			: 04:32
Stop time			: 06:34
Trigger rate (MIDAS)	        : 2081
Blocks written		        : 16180
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Beam energy			: 5.0 MeV/u
Beam intensity		        : ~2 epA -> (2*10^-12)/(24*1.602*10^-19) = 520833 pps
   NB: See https://elog.ph.ed.ac.uk/ISOLDE/54 for factor 24 rather than 20 (theoretical estimate)
Target				: #2 CH2_16 (450~480 ug/cm^2)
Ladder position		        : 127.95 mm
HI Degrader foil (um)		: 15 um Al
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
del_E voltage (V)		: -32 V
del_E leakage (uA)		: 0.02 uA
E voltage (V)			: -350 V
E leakage (uA)		        : 1.75 uA
E_hi voltage (V)		: -14 V
E_hi leakage (uA)		: 0.82 uA
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
PA power (upstream, positive)	: 1.52 A
PA power (upstream, negative)   : 0.55 A
PA power (downstream, positive)	: 0.8 A
PA power (downstream, negative) : 0.32 A
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Pressure (IMG1)		        : 7.5 x 10^-6 mbar
Pressure (old gauge)	        : 2.3 x 10^-5 mbar
Pressure (SEC)	           	: 4.0 x 10^-6 mbar
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Temp (Chiller)		        : -10.0 deg
Temp (chamber)		        : +5.4 deg
覧覧覧覧覧覧覧覧覧覧覧覧覧覧覧
Comments: First laser does not have a red peak at the center, but maybe okay for this shift.
Attaching PSB and GPS screenshots, as we need to monitor them regularly.
At 6:18 to 6:40, we started getting four rings from the PS Booster.  The 1st ring had a fairly low intensity, and the operators later dropped it.  These times were confirmed 
exactly with communication with PS operators.
again.
====================================================