Header: 4.7 MeV/u and CH2_30+25.
Ender: beam stop at PS (6 hour interruption)
====================================================
Run number : 80
Date : 10/11
Start time : 08:00:49
Stop time : 08:35:05
Trigger rate (MIDAS) : 8
Blocks written : 202
——————————————————————————————
Run Scalars (approx rates)
0- Ungated : 9
1- Gated : 8
2- dE : 42
3- E : 8
4- HI : 482
5- Pulser : 2
6- Clock : 967
——————————————————————————————
Beam energy : 4.7 MeV/u
Beam intensity : not checked this run (should be around 1.5pA)
Target : CH2_30+25 (Pos#6; 490-520 ug/cm2)
Ladder position : 67.26
HI Degrader foil (um) : 15 um Al
——————————————————————————————
del_E voltage (V) : -32
del_E leakage (uA) : 0.8
E voltage (V) : -350
E leakage (uA) : 1.745
E_hi voltage (V) : -13.5 to -14
E_hi leakage (uA) : 0.905
——————————————————————————————
PA power (upstream, positive) : 1.55 A
PA power (upstream, negative) : -0.55 A
PA power (downstream, positive) : 0.8 A
PA power (downstream, negative) : -0.28 A
——————————————————————————————
Pressure (IMG1) : 6.75E-06
Pressure (old gauge) : 1.9E-05
Pressure (SEC) : 3.9E-06
——————————————————————————————
Temp (Chiller) : -10.0
Temp (chamber) : 5.5
——————————————————————————————
Comments:
- since 6:20 RF problem on ring2 (although 3 full inj are shown) : ~1.6E+14 protons only
- 8.21 comment on PS: 6 hours of no beam
- 08:35 stop run, because no beam
==================================================== |