Entry  Thu Sep 14 14:07:21 2017, pb, alignment  2017.11.02_HISO_XT03_EdinburghChamber.pdf
Chat with survey team

1. mauf plugs for both ends of chamber with concentric 8mmH7 holes, with nylon tipped grub screws/clamp bars

2. Manuf of target with 8mmH7 hole
Entry  Thu Sep 14 10:29:25 2017, Claudia, Alpha Calibration 
Run 1-10 Test

14 September 2017

Run 11 Start 18:16 (CERN time)
Entry  Thu Sep 14 10:24:34 2017, Claudia, Detector - ADC connection 
ADC#1 0-31: p+n dE

ADC#2 32-48: n+n dE

ADC#2 49-64: p+n dE
Entry  Thu Sep 14 09:47:02 2017, dk, discussion with beam operators 
CERN side
     Faraday cup at the end of SEC, ideally with automated control to insert and remove
Entry  Thu Sep 14 08:37:27 2017, Claudia, Detector installation 8x
dE detector: 2083-9, 74 um thick, V_depletion=12V; V_operating=24 V

E detector:  3080-23, 1012 um thick, V_d=110; V_o=350 V

HI detector: 2410-23, 65 um; V_d=7 ; V_o=14 V
Entry  Wed Sep 13 15:28:18 2017, ,  
Discussion with ISOLDE staff -> things to sort out:

1) Removable Faraday Cup between Scattering Chamber and our Chamve
Entry  Sat Sep 9 09:39:38 2017, Claudia, Vacuum Readings at ISOLDE Hall 
Thursday, 7th September:

Vaccum after pumping all night preamps off, chiller off


09:37: IMG1 2.3E-5 mbar, Chamber 7.5 E-5 mbar; Julabo off;
09:38: IMG1 2.1E-5 mbar; Chamber 6.6E-5 mbar; Julabo 20 Celsius
09:41:
Entry  Fri Sep 8 19:12:19 2017, TD, MIDAS DAQ configuration 7x

MIDAS DAQ configuration files from directories w26:/MIDAS/experiments/daq
and w26:/MIDAS/TapeServer/SunOS
Entry  Fri Sep 8 19:03:23 2017, TD, w26 network configuration 12x

Network configuration files for workstation w26 (Sun Ultra 45)
Entry  Wed Aug 16 15:30:04 2017, DK, MD, Shipping Inventory 
==BOX A==  59kg - 600mm x 600mm x 800mm

VME crate, with power cable
Entry  Wed Aug 16 15:29:57 2017, DK, Shipping Inventory 
==BOX A==
VME crate
26 ribbon cables
Entry  Wed Aug 16 12:53:43 2017, DK, To do / missing 
Photodiode
     Electronics
     Foil mount (12 um Al seems okay, but check more carefully)
Entry  Thu Jun 1 13:09:38 2017, DK, Testing email header, part II 
Checking some server settings for the elog system regarding the email notification.

And testing updating an elog.
Entry  Wed May 24 16:18:22 2017, MD, Notes from visit of ISOLDE at 23rd May 2017 XT03_beamline_corner-panorama.jpgscattering_chamber-not_in_place.jpgcorner-possible_offline_setup-1.jpgpower_supply_near_beam-1.jpg
Status of Beamline XT03 at HIE-ISOLDE:

Scattering chamber (1m*1m) will be put in place in next two weeks. They are just waiting for separate crane, which will be mounted on the wall.
(Reason is, that the roof crane can only go down in the middle for XT03, because it is the end of the hall)
Entry  Wed May 24 16:09:10 2017, MD, Notes from visit of ISOLDE at 23rd May 2017 XT03_beamline_corner-panorama.jpgscattering_chamber-not_in_place.jpg
Status of Beamline XT03 at HIE-ISOLDE:

Scattering chamber (1m*1m) will be put in place in next two weeks. They are just waiting for separate crane, which will be mounted on the wall.
(Reason is, that the roof crane can only go down in the middle for XT03, because it is the end of the hall)
Entry  Wed May 24 15:21:37 2017, MD, Notes from visit of ISOLDE at 23rd May 2017 
Status of Beamline XT03 at HIE-ISOLDE:

Scattering chamber (1m*1m) will be put in place in next two weeks. They are just waiting for separate crane, which will be mounted on the wall.
(Reason is, that the roof crane can only go down in the middle for XT03, because it is the end of the hall)
Entry  Wed Apr 26 12:10:04 2017, DK, Testing email header 
I asked IT about putting the elog name into the email subject line (useful for those of us subscribed to more than one elog).  They said they enabled it
for ISOLDE.  Let's test 
to see!
Entry  Tue Apr 18 11:05:43 2017, Mirco / Claudia, Setup Preparation ISOLDE_-_chamber_status070417.pdfISOLDE_-_chamber_status210417.pdf
status of the setup - 07/04/2017

status of the setup - 21/04/2017
Entry  Tue Mar 14 10:57:20 2017, Claudia , Meeting Edinburgh 14 March 10 am 2017 
1) DAQ

We have 192 channels to DAQ working. Mirco will test the silicon detectors with an alpha source in the next 2 weeks. 

2) Vacuum
Entry  Sun Feb 19 12:22:16 2017, td, md, Vacuum and detector test 
------17.2.17 ------------------------------------------------------

closing chamber 
ELOG V3.1.4-unknown