AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 2 of 11  ELOG logo
Entry  Thu Sep 27 11:14:34 2018, CBH, Photos and Measurements from August CERN Trip 20180823_082444199_iOS.jpg20180823_082445833_iOS.jpg20180823_082457574_iOS.jpg20180823_082505693_iOS.jpg
Chamber frame width=65cm
Chamber frame height=146cm
Chamber frame length=230cm
Entry  Mon Sep 24 14:44:48 2018, DK, ISOLDE vacuum schematic isolde-vacuum-schematic.pdfisolde-vacuum-schematic.dia
Attached.  PDF is produced with Gnome Dia -- source file attached as well.

Bellow near GV is not depicted.  None of SEC components are depicted (as they would be irrelevant with the GV in place).
Entry  Thu Aug 30 15:14:50 2018, DK, Gate Valve image007.jpgS12.1_DN16-50_IOMI.PDFgv_smaller.jpg
Some notes on the broken gate valve that should go between SEC and our chamber at XT03.
Entry  Thu Aug 23 18:57:15 2018, DK, What daid is taking from ISOLDE to Edinburgh 
1 bolt for chamber stand structure, for reference for new struts.

2 target ladders: spare 1/2 style ladder, ladder from inside chamber, including the bits to connect to actuator
Entry  Thu Aug 23 18:23:27 2018, DK, Where to find (our) stuff at ISOLDE edinburgh-notices-daid.pdf
=Overview=

Shoes, hard hats, 'underpants', spiders, etc: Cardboard box "R", Garage entry of ISOLDE, shelf opposite turnstyle.
Entry  Thu Nov 23 13:16:56 2017, CLW, Beam energies 
Beam energy measurements can be found in the electronic logbook for ISO-REX-HIE

https://op-webtools.web.cern.ch/elogbook/

measurements for all energies were:
Entry  Thu Nov 16 16:24:29 2017, RG CLW MD, Run 173 Pulse Walkthrough HI n-side  
Header: Pulser walkthrough, HI n-side, trigger on HI detector this time
Ender: Change to digital pulser to check as non-linearity was observed at low amplitudes. 
====================================================
Entry  Thu Nov 16 16:14:04 2017, RG CLW MD, Run 172 Pulse Walkthrough HI n-side  
Header: Pulser walkthrough, HI n-side
Ender: Change to digital pulser to check as non-linearity was observed at low amplitudes. 
====================================================
Entry  Thu Nov 16 16:06:07 2017, RG CLW MD, Run 171 Pulse Walkthrough HI n-side  
Header: Pulser walkthrough, HI n-side
Ender: negative pulser, rise time 0.05 us, fall time 1ms, delay .5 us,ref INT, width 0.5 us,  Amplitude: 9 on
dial, no attenuation, in steps of 1 , 250 Hz
Entry  Thu Nov 16 15:57:29 2017, RG CLW MD, Run 170 Pulse Walkthrough HI p-side  
Header: Pulser walkthrough, HI p-side
Ender: positive pulser, fall time 1ms, delay 250 ns, 10 V in steps of 1, 250 Hz
====================================================
Entry  Thu Nov 16 15:43:48 2017, RG CLW MD, Run 169 Pulse Walkthrough E n-side  
Header: Pulser walkthrough, E n-side
Ender: negative pulser, rise time 0.05 us, fall time 1ms, delay .5 us,ref INT, width 0.5 us,  Amplitude: 6 on
dial, no attenuation, in steps of 1 , 250 Hz
Entry  Thu Nov 16 15:37:35 2017, RG, MD, CLW, Run 167 JUNK 
 
Entry  Thu Nov 16 15:33:24 2017, RG CLW MD, Run 168 Pulse Walkthrough E p-side  
Header: Pulser walkthrough, E p-side
Ender: positive pulser, fall time 1ms, delay 250 ns, 6 V in steps of 0.5, 250 Hz
====================================================
Entry  Thu Nov 16 15:24:42 2017, RG CLW MD, Run 166 Pulse Walkthrough dE n-side  
Header: Pulser walkthrough, dE n-side
Ender: negative pulser, rise time 0.05 us, fall time 1ms, delay .5 us,ref INT, width 0.5 us,  Amplitude: 7 on
dial, att. 5, in steps of 1 , 250 Hz
Entry  Thu Nov 16 15:14:39 2017, RG CLW MD, Run 165 Pulse Walkthrough dE p-side  
Header: Pulser walkthrough, dE p-side
Ender: positive pulser, fall time 1ms, delay 250 ns, 1.6 V in steps of 0.2, 250 Hz
====================================================
Entry  Thu Nov 16 11:20:51 2017, RG CLW MD, Run 162 -HI det calibration 
Header: 4alpha source - Heavy Ion detector calibration
Ender: 
====================================================
Entry  Wed Nov 15 16:24:35 2017, RG CLW, Run 160 - strip numbering E detector 
Header: 4alpha source off center (to the top)
Ender: 
====================================================
Entry  Wed Nov 15 16:05:25 2017, RG CLW, Run 159 - E detector calibration 
Header: 4alpha source run for E det calubration
Ender: 
====================================================
Entry  Wed Nov 15 15:41:41 2017, RG CLW, Run 157 - EJunk 
Header: 4alpha source
Ender: 
====================================================
Entry  Wed Nov 15 14:18:30 2017, DK, Issues and problems encountered 
Objective log on perceived issues.  (As a benchmark, I enumerated 17 such issues on my previous RIB experiment March 2017.)

In no particular order...
ELOG V3.1.4-unknown