Thu Sep 14 14:07:21 2017, pb, alignment
|
Chat with survey team
1. mauf plugs for both ends of chamber with concentric 8mmH7 holes, with nylon tipped grub screws/clamp bars
2. Manuf of target with 8mmH7 hole |
Thu Sep 14 10:29:25 2017, Claudia, Alpha Calibration
|
Run 1-10 Test
14 September 2017
Run 11 Start 18:16 (CERN time) |
Thu Sep 14 10:24:34 2017, Claudia, Detector - ADC connection
|
ADC#1 0-31: p+n dE
ADC#2 32-48: n+n dE
ADC#2 49-64: p+n dE |
Thu Sep 14 09:47:02 2017, dk, discussion with beam operators
|
CERN side
Faraday cup at the end of SEC, ideally with automated control to insert and remove
|
Thu Sep 14 08:37:27 2017, Claudia, Detector installation 8x
|
dE detector: 2083-9, 74 um thick, V_depletion=12V; V_operating=24 V
E detector: 3080-23, 1012 um thick, V_d=110; V_o=350 V
HI detector: 2410-23, 65 um; V_d=7 ; V_o=14 V |
Wed Sep 13 15:28:18 2017, ,
|
Discussion with ISOLDE staff -> things to sort out:
1) Removable Faraday Cup between Scattering Chamber and our Chamve |
Sat Sep 9 09:39:38 2017, Claudia, Vacuum Readings at ISOLDE Hall
|
Thursday, 7th September:
Vaccum after pumping all night preamps off, chiller off
09:37: IMG1 2.3E-5 mbar, Chamber 7.5 E-5 mbar; Julabo off;
09:38: IMG1 2.1E-5 mbar; Chamber 6.6E-5 mbar; Julabo 20 Celsius
09:41: |
Fri Sep 8 19:12:19 2017, TD, MIDAS DAQ configuration 7x
|
MIDAS DAQ configuration files from directories w26:/MIDAS/experiments/daq
and w26:/MIDAS/TapeServer/SunOS |
Fri Sep 8 19:03:23 2017, TD, w26 network configuration 12x
|
Network configuration files for workstation w26 (Sun Ultra 45)
|
Wed Aug 16 15:30:04 2017, DK, MD, Shipping Inventory
|
==BOX A== 59kg - 600mm x 600mm x 800mm
VME crate, with power cable
|
Wed Aug 16 15:29:57 2017, DK, Shipping Inventory
|
==BOX A==
VME crate
26 ribbon cables
|
Wed Aug 16 12:53:43 2017, DK, To do / missing
|
Photodiode
Electronics
Foil mount (12 um Al seems okay, but check more carefully)
|
Thu Jun 1 13:09:38 2017, DK, Testing email header, part II
|
Checking some server settings for the elog system regarding the email notification.
And testing updating an elog.
|
Wed May 24 16:18:22 2017, MD, Notes from visit of ISOLDE at 23rd May 2017   
|
Status of Beamline XT03 at HIE-ISOLDE:
Scattering chamber (1m*1m) will be put in place in next two weeks. They are just waiting for separate crane, which will be mounted on the wall.
(Reason is, that the roof crane can only go down in the middle for XT03, because it is the end of the hall) |
Wed May 24 16:09:10 2017, MD, Notes from visit of ISOLDE at 23rd May 2017 
|
Status of Beamline XT03 at HIE-ISOLDE:
Scattering chamber (1m*1m) will be put in place in next two weeks. They are just waiting for separate crane, which will be mounted on the wall.
(Reason is, that the roof crane can only go down in the middle for XT03, because it is the end of the hall) |
Wed May 24 15:21:37 2017, MD, Notes from visit of ISOLDE at 23rd May 2017
|
Status of Beamline XT03 at HIE-ISOLDE:
Scattering chamber (1m*1m) will be put in place in next two weeks. They are just waiting for separate crane, which will be mounted on the wall.
(Reason is, that the roof crane can only go down in the middle for XT03, because it is the end of the hall) |
Wed Apr 26 12:10:04 2017, DK, Testing email header
|
I asked IT about putting the elog name into the email subject line (useful for those of us subscribed to more than one elog). They said they enabled it
for ISOLDE. Let's test
to see!
|
Tue Apr 18 11:05:43 2017, Mirco / Claudia, Setup Preparation 
|
status of the setup - 07/04/2017
status of the setup - 21/04/2017 |
Tue Mar 14 10:57:20 2017, Claudia , Meeting Edinburgh 14 March 10 am 2017
|
1) DAQ
We have 192 channels to DAQ working. Mirco will test the silicon detectors with an alpha source in the next 2 weeks.
2) Vacuum |
Sun Feb 19 12:22:16 2017, td, md, Vacuum and detector test
|
------17.2.17 ------------------------------------------------------
closing chamber
|