AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 8 of 11  ELOG logo
Entry  Tue Nov 14 07:04:13 2017, DK, MD, CL, Run 140 
Header: Protons are back, continue 3.5 MeV/u on CH2
Ender: 
====================================================
Entry  Wed Aug 16 15:30:04 2017, DK, MD, Shipping Inventory 
==BOX A==  59kg - 600mm x 600mm x 800mm

VME crate, with power cable
Entry  Tue Nov 14 02:16:10 2017, DK, MD, Run 135 
Header: Back to CH2 with 3.5 MeV/u
Ender: 
====================================================
Entry  Tue Nov 14 06:22:29 2017, DK, MD, Run 139 
Header: Continue at 3.5 MeV/u w/ CH2
Ender: No protons are coming to ISOGPS
====================================================
Entry  Wed Nov 15 01:02:59 2017, DK, MD, Run 151 171115_protonquickdrop.jpg
Header: Continue with 5.0 MeV/
Ender: 
====================================================
Entry  Sun Nov 12 15:34:39 2017, DK, MB, Run 110 
Header: Carbon target at 4.4 MeV/u
Ender: End
====================================================
Entry  Sun Nov 12 21:27:23 2017, DK, MB, Run 113 
Header: Continue 4.4 MeV/u on CH2
Ender: End
====================================================
Entry  Mon Nov 5 16:26:34 2018, DK, CBH, Draft run plan 
Please see https://elog.ph.ed.ac.uk/ISOLDE/203 for the E_cm calculations.

Presently, we are scheduled for 9 days: 
Entry  Fri Jan 27 11:33:10 2017, DK, Testing email server 
Tinkering with configs for SYMPA email server to see if the elog info is sent to the mailing list or not

Normally it is sent by ELog@jast.ph.ed.ac.uk and I changed it to "restricted to local domain and subscribers" from "restricted to subscribers" under Edit
Entry  Wed Apr 26 12:10:04 2017, DK, Testing email header 
I asked IT about putting the elog name into the email subject line (useful for those of us subscribed to more than one elog).  They said they enabled it
for ISOLDE.  Let's test 
to see!
Entry  Thu Jun 1 13:09:38 2017, DK, Testing email header, part II 
Checking some server settings for the elog system regarding the email notification.

And testing updating an elog.
Entry  Wed Aug 16 12:53:43 2017, DK, To do / missing 
Photodiode
     Electronics
     Foil mount (12 um Al seems okay, but check more carefully)
Entry  Wed Aug 16 15:29:57 2017, DK, Shipping Inventory 
==BOX A==
VME crate
26 ribbon cables
Entry  Wed Nov 15 14:18:30 2017, DK, Issues and problems encountered 
Objective log on perceived issues.  (As a benchmark, I enumerated 17 such issues on my previous RIB experiment March 2017.)

In no particular order...
Entry  Thu Aug 23 18:23:27 2018, DK, Where to find (our) stuff at ISOLDE edinburgh-notices-daid.pdf
=Overview=

Shoes, hard hats, 'underpants', spiders, etc: Cardboard box "R", Garage entry of ISOLDE, shelf opposite turnstyle.
Entry  Thu Aug 23 18:57:15 2018, DK, What daid is taking from ISOLDE to Edinburgh 
1 bolt for chamber stand structure, for reference for new struts.

2 target ladders: spare 1/2 style ladder, ladder from inside chamber, including the bits to connect to actuator
Entry  Thu Aug 30 15:14:50 2018, DK, Gate Valve image007.jpgS12.1_DN16-50_IOMI.PDFgv_smaller.jpg
Some notes on the broken gate valve that should go between SEC and our chamber at XT03.
Entry  Mon Sep 24 14:44:48 2018, DK, ISOLDE vacuum schematic isolde-vacuum-schematic.pdfisolde-vacuum-schematic.dia
Attached.  PDF is produced with Gnome Dia -- source file attached as well.

Bellow near GV is not depicted.  None of SEC components are depicted (as they would be irrelevant with the GV in place).
Entry  Thu Sep 27 12:41:06 2018, DK, Strut measurement request edinburgh-chamber-query.pdf
For posterity

==========
Entry  Mon Oct 8 12:07:18 2018, DK, Gas cell check with He sniffer 
Notes from an email:

Tested the chamber with the leak checker.  We got 3.7 x 10^-6 mbar
ELOG V3.1.4-unknown