Tue Nov 14 07:04:13 2017, DK, MD, CL, Run 140
|
Header: Protons are back, continue 3.5 MeV/u on CH2
Ender:
====================================================
|
Wed Aug 16 15:30:04 2017, DK, MD, Shipping Inventory
|
==BOX A== 59kg - 600mm x 600mm x 800mm
VME crate, with power cable
|
Tue Nov 14 02:16:10 2017, DK, MD, Run 135
|
Header: Back to CH2 with 3.5 MeV/u
Ender:
====================================================
|
Tue Nov 14 06:22:29 2017, DK, MD, Run 139
|
Header: Continue at 3.5 MeV/u w/ CH2
Ender: No protons are coming to ISOGPS
====================================================
|
Wed Nov 15 01:02:59 2017, DK, MD, Run 151
|
Header: Continue with 5.0 MeV/
Ender:
====================================================
|
Sun Nov 12 15:34:39 2017, DK, MB, Run 110
|
Header: Carbon target at 4.4 MeV/u
Ender: End
====================================================
|
Sun Nov 12 21:27:23 2017, DK, MB, Run 113
|
Header: Continue 4.4 MeV/u on CH2
Ender: End
====================================================
|
Mon Nov 5 16:26:34 2018, DK, CBH, Draft run plan
|
Please see https://elog.ph.ed.ac.uk/ISOLDE/203 for the E_cm calculations.
Presently, we are scheduled for 9 days:
|
Fri Jan 27 11:33:10 2017, DK, Testing email server
|
Tinkering with configs for SYMPA email server to see if the elog info is sent to the mailing list or not
Normally it is sent by ELog@jast.ph.ed.ac.uk and I changed it to "restricted to local domain and subscribers" from "restricted to subscribers" under Edit |
Wed Apr 26 12:10:04 2017, DK, Testing email header
|
I asked IT about putting the elog name into the email subject line (useful for those of us subscribed to more than one elog). They said they enabled it
for ISOLDE. Let's test
to see!
|
Thu Jun 1 13:09:38 2017, DK, Testing email header, part II
|
Checking some server settings for the elog system regarding the email notification.
And testing updating an elog.
|
Wed Aug 16 12:53:43 2017, DK, To do / missing
|
Photodiode
Electronics
Foil mount (12 um Al seems okay, but check more carefully)
|
Wed Aug 16 15:29:57 2017, DK, Shipping Inventory
|
==BOX A==
VME crate
26 ribbon cables
|
Wed Nov 15 14:18:30 2017, DK, Issues and problems encountered
|
Objective log on perceived issues. (As a benchmark, I enumerated 17 such issues on my previous RIB experiment March 2017.)
In no particular order...
|
Thu Aug 23 18:23:27 2018, DK, Where to find (our) stuff at ISOLDE
|
=Overview=
Shoes, hard hats, 'underpants', spiders, etc: Cardboard box "R", Garage entry of ISOLDE, shelf opposite turnstyle.
|
Thu Aug 23 18:57:15 2018, DK, What daid is taking from ISOLDE to Edinburgh
|
1 bolt for chamber stand structure, for reference for new struts.
2 target ladders: spare 1/2 style ladder, ladder from inside chamber, including the bits to connect to actuator
|
Thu Aug 30 15:14:50 2018, DK, Gate Valve  
|
Some notes on the broken gate valve that should go between SEC and our chamber at XT03. |
Mon Sep 24 14:44:48 2018, DK, ISOLDE vacuum schematic 
|
Attached. PDF is produced with Gnome Dia -- source file attached as well.
Bellow near GV is not depicted. None of SEC components are depicted (as they would be irrelevant with the GV in place).
|
Thu Sep 27 12:41:06 2018, DK, Strut measurement request
|
For posterity
==========
|
Mon Oct 8 12:07:18 2018, DK, Gas cell check with He sniffer
|
Notes from an email:
Tested the chamber with the leak checker. We got 3.7 x 10^-6 mbar
|