AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 9 of 11  ELOG logo
Entry  Wed Nov 15 07:39:26 2017, MD, DK, CLW, End of beamtime, modules reading before turning off 
Entry  Wed Nov 15 11:33:31 2017, RG CLW, Run 155 - calibration del E 
Entry  Wed Nov 15 14:18:30 2017, DK, Issues and problems encountered 
Entry  Wed Nov 15 15:41:41 2017, RG CLW, Run 157 - EJunk 
Entry  Wed Nov 15 16:05:25 2017, RG CLW, Run 159 - E detector calibration 
Entry  Wed Nov 15 16:24:35 2017, RG CLW, Run 160 - strip numbering E detector 
Entry  Thu Nov 16 11:20:51 2017, RG CLW MD, Run 162 -HI det calibration 
Entry  Thu Nov 16 15:14:39 2017, RG CLW MD, Run 165 Pulse Walkthrough dE p-side  
Entry  Thu Nov 16 15:24:42 2017, RG CLW MD, Run 166 Pulse Walkthrough dE n-side  
Entry  Thu Nov 16 15:33:24 2017, RG CLW MD, Run 168 Pulse Walkthrough E p-side  
Entry  Thu Nov 16 15:37:35 2017, RG, MD, CLW, Run 167 JUNK 
Entry  Thu Nov 16 15:43:48 2017, RG CLW MD, Run 169 Pulse Walkthrough E n-side  
Entry  Thu Nov 16 15:57:29 2017, RG CLW MD, Run 170 Pulse Walkthrough HI p-side  
Entry  Thu Nov 16 16:06:07 2017, RG CLW MD, Run 171 Pulse Walkthrough HI n-side  
Entry  Thu Nov 16 16:14:04 2017, RG CLW MD, Run 172 Pulse Walkthrough HI n-side  
Entry  Thu Nov 16 16:24:29 2017, RG CLW MD, Run 173 Pulse Walkthrough HI n-side  
Entry  Thu Nov 23 13:16:56 2017, CLW, Beam energies 
Entry  Thu Aug 23 18:23:27 2018, DK, Where to find (our) stuff at ISOLDE edinburgh-notices-daid.pdf
Entry  Thu Aug 23 18:57:15 2018, DK, What daid is taking from ISOLDE to Edinburgh 
Entry  Thu Aug 30 15:14:50 2018, DK, Gate Valve image007.jpgS12.1_DN16-50_IOMI.PDFgv_smaller.jpg
ELOG V3.1.4-unknown