AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
ISOLDE, Page 2 of 11
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
203 Entries
Goto page
Previous
1
, 2,
3
...
9
,
10
,
11
Next
All
ID
Date
Author
Subject
Text
21
Thu Sep 14 10:29:25 2017
Claudia
Alpha Calibration
Run 1-10 Test
14 September 2017
Run 11 Start 18:16
22
Thu Sep 14 14:07:21 2017
pb
alignment
Chat with survey team
1. mauf plugs for both ends of
chamber with concentric 8mmH7 holes, with
23
Thu Sep 14 15:40:42 2017
TD
MSL type S2 bias data
24
Tue Sep 19 14:54:47 2017
Claudia, Toby
Setup Photos
14x
25
Thu Sep 21 14:54:00 2017
Claudia
Alpha Calibration Spectra
Alpha Calibration Runs (need to check settings
in logbook)
0-63: dE detector and 32-47 is
26
Mon Sep 25 14:50:46 2017
dk
To do list before main exp. - update from meeting 28th September
NB: This list may be incomplete!
CERN side:
Draft
Thu Sep 28 03:34:20 2017
dk
heavy ion degrader foil
--text from email--
Using Claudia's code, I added a layer of
28
Thu Sep 28 03:38:18 2017
dk
heavy ion degrader foil - updated
--original email text--
Using Claudia's code, I added a layer of
Al foil before the heavy ion
8x
29
Wed Oct 4 18:57:16 2017
dk
Digitized run notes from tests at CERN
Transcription of paper logbook for runs.
Please check as I cannot read all the writing.
30
Thu Oct 5 11:34:34 2017
Claudia
Meeting 5.10.17
POINTS FOR DISCUSSION
Email sent to Karl and
31
Thu Oct 12 12:45:54 2017
Claudia
Meeting 12.10.17
Email sent to Karl and Olof about
FC at end of SEC
Gain
resistor package
Network access
N2
32
Thu Oct 19 10:55:54 2017
Claudia
Meeting 19.10.
CERN-Edinburgh Liaison
FC at end of SEC: manual
Network
access: port free.
N2 gas ?
-date
33
Thu Oct 19 14:41:19 2017
daid
heavy ion degrader foil - full / new
See entry https://elog.ph.ed.ac.uk/ISOLDE/28
for a full description, but editing the same
elog is altering attachment numbers etc.
8x
34
Tue Oct 24 09:27:24 2017
Peter Black, DK
Safety words
Plate 1. Contents of chamber
35
Mon Oct 30 09:46:04 2017
Peter Black
Notes on iris install/operation
The iris mounts have 2 superimposed constellations
of 3mm mounting holes on them that correspond
to those of the S2 detector, however the
36
Sat Nov 4 06:29:03 2017
TD
MIDASsort online sort programs, spectrum titles, calibration s/w & READMEs
37
Sat Nov 4 14:10:20 2017
daid
Julabo chiller operation
This log entry contains a basic instruction
on how to operate the Julabo liquid flow
chiller.
38
Sun Nov 5 20:25:10 2017
Ruchi
Circuit diagram and cable mapping
39
Mon Nov 6 10:46:53 2017
Peter Black
Faraday cup drawings
Note that the removal of the supressor
reqires the special allen key.
40
Mon Nov 6 10:50:33 2017
Peter Black
foil mount drawings
Goto page
Previous
1
, 2,
3
...
9
,
10
,
11
Next
All
ELOG V3.1.4-unknown