29
|
Wed Oct 4 18:57:16 2017 |
dk | Digitized run notes from tests at CERN | Transcription of paper logbook for runs.
Please check as I cannot read all the writing.
|
|
204
|
Mon Nov 5 16:26:34 2018 |
DK, CBH | Draft run plan | Please see https://elog.ph.ed.ac.uk/ISOLDE/203
for the E_cm calculations.
|
|
168
|
Wed Nov 15 07:39:26 2017 |
MD, DK, CLW | End of beamtime, modules reading before turning off | Header: end of beamtime - modules reading
Ender:
==================================================== |
|
209
|
Mon Nov 12 11:25:58 2018 |
CBH | Expected Proton Energy Plots | Attached are the plots from MC simulations
of the energies the detected particles are
to have, with the top plot showing the dE-E |
|
39
|
Mon Nov 6 10:46:53 2017 |
Peter Black | Faraday cup drawings | Note that the removal of the supressor
reqires the special allen key. |
|
194
|
Mon Oct 8 12:07:18 2018 |
DK | Gas cell check with He sniffer | Notes from an email:
Tested the chamber with the leak checker. |
|
193
|
Mon Oct 8 12:05:25 2018 |
DK, PB | Gas cell supports | These are used to connect the gas cell to
the target ladder. We only had the one,
and it would be more convenient if each gas |
|
188
|
Thu Aug 30 15:14:50 2018 |
DK | Gate Valve | Some notes on the broken gate valve that should
go between SEC and our chamber at XT03. |
|
189
|
Mon Sep 24 14:44:48 2018 |
DK | ISOLDE vacuum schematic | Attached. PDF is produced with Gnome Dia
-- source file attached as well.
|
|
202
|
Fri Nov 2 17:01:16 2018 |
DK | Inventory going to CERN by easyJet | Conor will take:
==Black clicker case==
|
|
85
|
Fri Nov 10 10:46:54 2017 |
SL | Investigation of E detector thickness | While changing HI degrader foil to 10um
Al, the E detector was investigated, due
to previously observed alpha punch-through. |
|
171
|
Wed Nov 15 14:18:30 2017 |
DK | Issues and problems encountered | Objective log on perceived issues. (As a
benchmark, I enumerated 17 such issues on
my previous RIB experiment March 2017.)
|
|
37
|
Sat Nov 4 14:10:20 2017 |
daid | Julabo chiller operation | This log entry contains a basic instruction
on how to operate the Julabo liquid flow
chiller.
|
|
15
|
Fri Sep 8 19:12:19 2017 |
TD | MIDAS DAQ configuration |
MIDAS DAQ configuration files from directories
w26:/MIDAS/experiments/daq
|
7x |
112
|
Sat Nov 11 19:35:28 2017 |
TD | MIDAS DAQ configuration & MIDAS logs 1-11.11.17 | |
16x |
45
|
Wed Nov 8 17:12:01 2017 |
TD | MIDAS logs | Attachment 1 - snoop -d bge1 log following
MVME CPU reset
|
|
36
|
Sat Nov 4 06:29:03 2017 |
TD | MIDASsort online sort programs, spectrum titles, calibration s/w & READMEs | |
|
23
|
Thu Sep 14 15:40:42 2017 |
TD | MSL type S2 bias data | |
|
201
|
Wed Oct 31 16:01:33 2018 |
DK | Measuring foil thickness | A couple scans from my notes which may be
useful.
|
|
31
|
Thu Oct 12 12:45:54 2017 |
Claudia | Meeting 12.10.17 | Email sent to Karl and Olof about
FC at end of SEC
Gain
resistor package
Network access