AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 2 of 11  ELOG logo
ID Date Author Subjectup Text Attachments
  29   Wed Oct 4 18:57:16 2017 dkDigitized run notes from tests at CERNTranscription of paper logbook for runs. 
Please check as I cannot read all the writing.
  
  204   Mon Nov 5 16:26:34 2018 DK, CBHDraft run planPlease see https://elog.ph.ed.ac.uk/ISOLDE/203
for the E_cm calculations.
  
  168   Wed Nov 15 07:39:26 2017 MD, DK, CLWEnd of beamtime, modules reading before turning offHeader: end of beamtime - modules reading
Ender: 
====================================================
  
  209   Mon Nov 12 11:25:58 2018 CBHExpected Proton Energy Plots Attached are the plots from MC simulations
of the energies the detected particles are
to have, with the top plot showing the dE-E
 ti_6.00um_2.8MeVu.pngti_3um_1.88MeVu.pngal_12.5_2.8MeVu.pngMargerin2014elog.png 
  39   Mon Nov 6 10:46:53 2017 Peter BlackFaraday cup drawingsNote that the removal of the supressor
reqires the special allen key.
 Farady_cup.PDFcup.PDFsupressor.PDFFarady_cup_main.PDF 
  194   Mon Oct 8 12:07:18 2018 DKGas cell check with He snifferNotes from an email:

Tested the chamber with the leak checker.
  
  193   Mon Oct 8 12:05:25 2018 DK, PBGas cell supportsThese are used to connect the gas cell to
the target ladder.  We only had the one,
and it would be more convenient if each gas
 gas_cell_support.PDF 
  188   Thu Aug 30 15:14:50 2018 DKGate ValveSome notes on the broken gate valve that should
go between SEC and our chamber at XT03.
 image007.jpgS12.1_DN16-50_IOMI.PDFgv_smaller.jpg 
  189   Mon Sep 24 14:44:48 2018 DKISOLDE vacuum schematicAttached.  PDF is produced with Gnome Dia
-- source file attached as well.
 isolde-vacuum-schematic.pdfisolde-vacuum-schematic.dia 
  202   Fri Nov 2 17:01:16 2018 DKInventory going to CERN by easyJetConor will take:

==Black clicker case==
  
  85   Fri Nov 10 10:46:54 2017 SLInvestigation of E detector thicknessWhile changing HI degrader foil to 10um
Al, the E detector was investigated, due
to previously observed alpha punch-through.
  
  171   Wed Nov 15 14:18:30 2017 DKIssues and problems encounteredObjective log on perceived issues.  (As a
benchmark, I enumerated 17 such issues on
my previous RIB experiment March 2017.)
  
  37   Sat Nov 4 14:10:20 2017 daidJulabo chiller operationThis log entry contains a basic instruction
on how to operate the Julabo liquid flow
chiller.
  
  15   Fri Sep 8 19:12:19 2017 TDMIDAS DAQ configuration
MIDAS DAQ configuration files from directories
w26:/MIDAS/experiments/daq
 7x 
  112   Sat Nov 11 19:35:28 2017 TDMIDAS DAQ configuration & MIDAS logs 1-11.11.17   16x 
  45   Wed Nov 8 17:12:01 2017 TDMIDAS logsAttachment 1 - snoop -d bge1 log following
MVME CPU reset
 snoop.logvmecpu.log 
  36   Sat Nov 4 06:29:03 2017 TDMIDASsort online sort programs, spectrum titles, calibration s/w & READMEs   IS607.tar.gzCalibration.tar.gzREADMEs.tar.gz 
  23   Thu Sep 14 15:40:42 2017 TDMSL type S2 bias data   MSLtypeS2.txt 
  201   Wed Oct 31 16:01:33 2018 DKMeasuring foil thicknessA couple scans from my notes which may be
useful.
 DOC_(4).PDFDOC_(5).PDF 
  31   Thu Oct 12 12:45:54 2017 ClaudiaMeeting 12.10.17Email sent to Karl and Olof about 


FC at end of SEC
Gain
resistor package
Network access
N2
  
ELOG V3.1.4-unknown