AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 9 of 11  ELOG logo
ID Date Author Subjectup Text Attachments
  48   Wed Nov 8 21:21:31 2017 Ruchi Garg, DaidRunLogTemplateHeader:
Ender: 
====================================================
  
  34   Tue Oct 24 09:27:24 2017 Peter Black, DKSafety words

Plate 1.  Contents of chamber
  
  49   Wed Nov 8 22:00:00 2017 daidScalarsPresent scalars:
0: Ungated
1: Gated
  
  192   Thu Oct 4 13:07:33 2018 KGSchematics for gas-cell testsin_atmosphere.png : schematic for testing
gas-cell in atmosphere
 in_atmosphere.pngFeedthrough.png 
  24   Tue Sep 19 14:54:47 2017 Claudia, TobySetup Photos   14x 
  5   Tue Apr 18 11:05:43 2017 Mirco / ClaudiaSetup Preparationstatus of the setup - 07/04/2017

status of the setup - 21/04/2017
 ISOLDE_-_chamber_status070417.pdfISOLDE_-_chamber_status210417.pdf 
  Draft   Wed Aug 16 15:29:57 2017 DKShipping Inventory==BOX A==
VME crate
26 ribbon cables
  
  13   Wed Aug 16 15:30:04 2017 DK, MDShipping Inventory==BOX A==  59kg - 600mm x 600mm x 800mm

VME crate, with power cable
  
  60   Thu Nov 9 06:30:35 2017 Daid, MircoSpectra (Shift 1)Screen shots for accumulated data before the
target went down.  Should be (at least) runs
53 & 54 inclusive, possibly back to the start
 12x 
  191   Thu Sep 27 12:41:06 2018 DKStrut measurement requestFor posterity

==========
 edinburgh-chamber-query.pdf 
  200   Wed Oct 31 14:50:36 2018 DKStrut shipping infohttp://www.dhl.com/en/express/tracking.html?AWB=1647723055&brand=DHL   
  67   Thu Nov 9 12:15:33 2017 SLTIMBER: Faraday Cup MeasurementsFaraday Cup (at end of Edinburgh chamber) measurements
recorded in TIMBER (from approx 10.00 9/11/17).
  
  44   Tue Nov 7 14:38:25 2017 Ruchi GargTarget ladder configuration   TargetLadder.pdf 
  195   Mon Oct 8 17:02:47 2018 DKTarget ladder photo from previous experimentFrom Alex, attached.  IMG_1274.jpg 
  6   Wed Apr 26 12:10:04 2017 DKTesting email headerI asked IT about putting the elog name into
the email subject line (useful for those
of us subscribed to more than one elog).
  
  10   Thu Jun 1 13:09:38 2017 DKTesting email header, part IIChecking some server settings for the elog
system regarding the email notification.
  
  2   Fri Jan 27 11:33:10 2017 DKTesting email serverTinkering with configs for SYMPA email server
to see if the elog info is sent to the mailing
list or not
  
  61   Thu Nov 9 07:15:49 2017 MDTips for Babysitting ISOLDE during shiftsfrom ISOLDE webpage  Babysitting_ISOLDE_from_the_CCC.pdf 
  11   Wed Aug 16 12:53:43 2017 DKTo do / missingPhotodiode
     Electronics
     Foil mount (12 um Al seems okay, but
  
  26   Mon Sep 25 14:50:46 2017 dkTo do list before main exp. - update from meeting 28th SeptemberNB: This list may be incomplete!

CERN side: 
  
ELOG V3.1.4-unknown