AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
ISOLDE, Page 9 of 11
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
203 Entries
Goto page
Previous
1
,
2
,
3
...
8
, 9,
10
,
11
Next
All
ID
Date
Author
Subject
Text
4
Tue Mar 14 10:57:20 2017
Claudia
Meeting Edinburgh 14 March 10 am 2017
1) DAQ
We have 192 channels to DAQ working.
Mirco will test the silicon detectors with
30
Thu Oct 5 11:34:34 2017
Claudia
Meeting 5.10.17
POINTS FOR DISCUSSION
Email sent to Karl and
32
Thu Oct 19 10:55:54 2017
Claudia
Meeting 19.10.
CERN-Edinburgh Liaison
FC at end of SEC: manual
Network
access: port free.
N2 gas ?
-date
31
Thu Oct 12 12:45:54 2017
Claudia
Meeting 12.10.17
Email sent to Karl and Olof about
FC at end of SEC
Gain
resistor package
Network access
N2
201
Wed Oct 31 16:01:33 2018
DK
Measuring foil thickness
A couple scans from my notes which may be
useful.
23
Thu Sep 14 15:40:42 2017
TD
MSL type S2 bias data
36
Sat Nov 4 06:29:03 2017
TD
MIDASsort online sort programs, spectrum titles, calibration s/w & READMEs
45
Wed Nov 8 17:12:01 2017
TD
MIDAS logs
Attachment 1 - snoop -d bge1 log following
MVME CPU reset
112
Sat Nov 11 19:35:28 2017
TD
MIDAS DAQ configuration & MIDAS logs 1-11.11.17
16x
15
Fri Sep 8 19:12:19 2017
TD
MIDAS DAQ configuration
MIDAS DAQ configuration files from directories
w26:/MIDAS/experiments/daq
7x
37
Sat Nov 4 14:10:20 2017
daid
Julabo chiller operation
This log entry contains a basic instruction
on how to operate the Julabo liquid flow
chiller.
171
Wed Nov 15 14:18:30 2017
DK
Issues and problems encountered
Objective log on perceived issues. (As a
benchmark, I enumerated 17 such issues on
my previous RIB experiment March 2017.)
85
Fri Nov 10 10:46:54 2017
SL
Investigation of E detector thickness
While changing HI degrader foil to 10um
Al, the E detector was investigated, due
to previously observed alpha punch-through.
202
Fri Nov 2 17:01:16 2018
DK
Inventory going to CERN by easyJet
Conor will take:
==Black clicker case==
189
Mon Sep 24 14:44:48 2018
DK
ISOLDE vacuum schematic
Attached. PDF is produced with Gnome Dia
-- source file attached as well.
188
Thu Aug 30 15:14:50 2018
DK
Gate Valve
Some notes on the broken gate valve that should
go between SEC and our chamber at XT03.
193
Mon Oct 8 12:05:25 2018
DK, PB
Gas cell supports
These are used to connect the gas cell to
the target ladder. We only had the one,
and it would be more convenient if each gas
194
Mon Oct 8 12:07:18 2018
DK
Gas cell check with He sniffer
Notes from an email:
Tested the chamber with the leak checker.
39
Mon Nov 6 10:46:53 2017
Peter Black
Faraday cup drawings
Note that the removal of the supressor
reqires the special allen key.
209
Mon Nov 12 11:25:58 2018
CBH
Expected Proton Energy Plots
Attached are the plots from MC simulations
of the energies the detected particles are
to have, with the top plot showing the dE-E
Goto page
Previous
1
,
2
,
3
...
8
, 9,
10
,
11
Next
All
ELOG V3.1.4-unknown