  4   Tue Mar 14 10:57:20 2017 Claudia Meeting Edinburgh 14 March 10 am 20171) DAQ

We have 192 channels to DAQ working.
Mirco will test the silicon detectors with
  
  30   Thu Oct 5 11:34:34 2017 ClaudiaMeeting 5.10.17POINTS FOR DISCUSSION

 


Email sent to Karl and
  
  32   Thu Oct 19 10:55:54 2017 ClaudiaMeeting 19.10.CERN-Edinburgh Liaison


FC at end of SEC: manual
Network
access: port free.
N2 gas ? 
-date
  
  31   Thu Oct 12 12:45:54 2017 ClaudiaMeeting 12.10.17Email sent to Karl and Olof about 


FC at end of SEC
Gain
resistor package
Network access
N2
  
  201   Wed Oct 31 16:01:33 2018 DKMeasuring foil thicknessA couple scans from my notes which may be
useful.
 DOC_(4).PDFDOC_(5).PDF 
  23   Thu Sep 14 15:40:42 2017 TDMSL type S2 bias data   MSLtypeS2.txt 
  36   Sat Nov 4 06:29:03 2017 TDMIDASsort online sort programs, spectrum titles, calibration s/w & READMEs   IS607.tar.gzCalibration.tar.gzREADMEs.tar.gz 
  45   Wed Nov 8 17:12:01 2017 TDMIDAS logsAttachment 1 - snoop -d bge1 log following
MVME CPU reset
 snoop.logvmecpu.log 
  112   Sat Nov 11 19:35:28 2017 TDMIDAS DAQ configuration & MIDAS logs 1-11.11.17   16x 
  15   Fri Sep 8 19:12:19 2017 TDMIDAS DAQ configuration
MIDAS DAQ configuration files from directories
w26:/MIDAS/experiments/daq
 7x 
  37   Sat Nov 4 14:10:20 2017 daidJulabo chiller operationThis log entry contains a basic instruction
on how to operate the Julabo liquid flow
chiller.
  
  171   Wed Nov 15 14:18:30 2017 DKIssues and problems encounteredObjective log on perceived issues.  (As a
benchmark, I enumerated 17 such issues on
my previous RIB experiment March 2017.)
  
  85   Fri Nov 10 10:46:54 2017 SLInvestigation of E detector thicknessWhile changing HI degrader foil to 10um
Al, the E detector was investigated, due
to previously observed alpha punch-through.
  
  202   Fri Nov 2 17:01:16 2018 DKInventory going to CERN by easyJetConor will take:

==Black clicker case==
  
  189   Mon Sep 24 14:44:48 2018 DKISOLDE vacuum schematicAttached.  PDF is produced with Gnome Dia
-- source file attached as well.
 isolde-vacuum-schematic.pdfisolde-vacuum-schematic.dia 
  188   Thu Aug 30 15:14:50 2018 DKGate ValveSome notes on the broken gate valve that should
go between SEC and our chamber at XT03.
 image007.jpgS12.1_DN16-50_IOMI.PDFgv_smaller.jpg 
  193   Mon Oct 8 12:05:25 2018 DK, PBGas cell supportsThese are used to connect the gas cell to
the target ladder.  We only had the one,
and it would be more convenient if each gas
 gas_cell_support.PDF 
  194   Mon Oct 8 12:07:18 2018 DKGas cell check with He snifferNotes from an email:

Tested the chamber with the leak checker.
  
  39   Mon Nov 6 10:46:53 2017 Peter BlackFaraday cup drawingsNote that the removal of the supressor
reqires the special allen key.
 Farady_cup.PDFcup.PDFsupressor.PDFFarady_cup_main.PDF 
  209   Mon Nov 12 11:25:58 2018 CBHExpected Proton Energy Plots Attached are the plots from MC simulations
of the energies the detected particles are
to have, with the top plot showing the dE-E
 ti_6.00um_2.8MeVu.pngti_3um_1.88MeVu.pngal_12.5_2.8MeVu.pngMargerin2014elog.png 