  168   Wed Nov 15 07:39:26 2017 MD, DK, CLWEnd of beamtime, modules reading before turning offHeader: end of beamtime - modules reading
Ender: 
====================================================
  
  204   Mon Nov 5 16:26:34 2018 DK, CBHDraft run planPlease see https://elog.ph.ed.ac.uk/ISOLDE/203
for the E_cm calculations.
  
  29   Wed Oct 4 18:57:16 2017 dkDigitized run notes from tests at CERNTranscription of paper logbook for runs. 
Please check as I cannot read all the writing.
  
  18   Thu Sep 14 08:37:27 2017 ClaudiaDetector installationdE detector: 2083-9, 74 um thick, V_depletion=12V;
V_operating=24 V

E detector:  3080-23, 1012
 8x 
  20   Thu Sep 14 10:24:34 2017 ClaudiaDetector - ADC connectionADC#1 0-31: p+n dE

ADC#2 32-48: n+n dE

ADC#2 49-64: p+n dE
  
  199   Thu Oct 25 13:25:16 2018 KGCurrent gas cell status(Wrapped up)

    Cell b : 15um Al exit, 12.5um Al entrance. 
  
  203   Mon Nov 5 13:52:46 2018 CBHCoM energies for 44Ti(alpha,p) reaction for different entrance windows and beam energiesAssuming 200 Torr helium target., elastic
and reaction peaks do not have signifcant
overlap unless stated:
  
  38   Sun Nov 5 20:25:10 2017 RuchiCircuit diagram and cable mapping   Cabling.pdfPreampsPCBs.pdfCircuit.pdf 
  100   Sat Nov 11 07:45:34 2017 ClaudiaChecking Laser qualityThere is an option to see when the beam
is gone if it is due to lasers or due to
the accelerator.
  
  54   Wed Nov 8 23:46:32 2017 DaidCharge State Distributions Faraday cup readout at the end of our chamber
should change based on whether or not the
target is in and also the 59Cu beam energy.
 charge-state-distribution-3.6.jpgcharge-state-distribution-4.0.jpgcharge-state-distribution-4.4.jpgcharge-state-distribution-4.7.jpgcharge-state-distribution-5.0.jpg 
  57   Thu Nov 9 05:33:50 2017 TDCharge State Distributions > Faraday cup readout at the end of our chamber
should change based on whether or not the
target is in and also the 59Cu 
  
  198   Wed Oct 10 10:57:33 2018 DKChamber wheel bolt spacingFrom Ruchi's friend Rob.  WhatsApp_Image_2018-10-10_at_09.14.43.jpeg 
  86   Fri Nov 10 14:48:22 2017 TDCalibration
ADC offsets calculated using data files R42-r47
 18x 
  84   Fri Nov 10 08:31:06 2017 TDCAEN V767 TDC trigger/channel 0 logic changeApproximately 5-10% of events overnight were
'bad' i.e. missing TDC data
  
  72   Thu Nov 9 17:01:49 2017 TDCAEN V560 Scalers added to datastreamCAEN V560 Scaler channels #0-7 have been added
to the EbyE datastream by adding
per event readout of defined VME registers
  
  210   Tue Nov 20 14:07:37 2018 dkBlue Loan Book ScanScan is attached, including all items denoted
in the loan book as being taken to ISOLDE.
 loan-book-scan.pdf 
  51   Wed Nov 8 22:21:35 2017 RuchiBeam transmissionBy the end of beam tuning (around 6pm),
beam transmission between Faraday cups at
the end of SEC and at end of Edinburgh chamber:
  
  185   Thu Nov 23 13:16:56 2017 CLWBeam energiesBeam energy measurements can be found in
the electronic logbook for ISO-REX-HIE

https://op-webtools.web.cern.ch/elogbook/
  
  205   Wed Nov 7 14:27:45 2018 CBH, DKBeam Plan for Miguel and Alberto (ISOLDE beam operators)




Presently,
we are scheduled for 9 days: 
  Nov 26-28
are three (3) days nominally for beam development
  
  197   Tue Oct 9 14:25:54 2018 DKAu foil request to STFChttp://npg.dl.ac.uk/TargetRequests/

https://www.technologysi.stfc.ac.uk/Pages/Target-frames.aspx
 NPG_-_Online_Target_Request.pdf 