  188   Thu Aug 30 15:14:50 2018 DKGate ValveSome notes on the broken gate valve that should
go between SEC and our chamber at XT03.
 image007.jpgS12.1_DN16-50_IOMI.PDFgv_smaller.jpg 
  189   Mon Sep 24 14:44:48 2018 DKISOLDE vacuum schematicAttached.  PDF is produced with Gnome Dia
-- source file attached as well.
 isolde-vacuum-schematic.pdfisolde-vacuum-schematic.dia 
  190   Thu Sep 27 11:14:34 2018 CBHPhotos and Measurements from August CERN TripChamber frame width=65cm
Chamber frame height=146cm
Chamber frame length=230cm
 20180823_082444199_iOS.jpg20180823_082445833_iOS.jpg20180823_082457574_iOS.jpg20180823_082505693_iOS.jpg 
  191   Thu Sep 27 12:41:06 2018 DKStrut measurement requestFor posterity

==========
 edinburgh-chamber-query.pdf 
  192   Thu Oct 4 13:07:33 2018 KGSchematics for gas-cell testsin_atmosphere.png : schematic for testing
gas-cell in atmosphere
 in_atmosphere.pngFeedthrough.png 
  193   Mon Oct 8 12:05:25 2018 DK, PBGas cell supportsThese are used to connect the gas cell to
the target ladder.  We only had the one,
and it would be more convenient if each gas
 gas_cell_support.PDF 
  194   Mon Oct 8 12:07:18 2018 DKGas cell check with He snifferNotes from an email:

Tested the chamber with the leak checker.
  
  195   Mon Oct 8 17:02:47 2018 DKTarget ladder photo from previous experimentFrom Alex, attached.  IMG_1274.jpg 
  196   Tue Oct 9 10:40:13 2018 DKTo-do Meeting Notes: July, August, September, OctoberEach month's notes are attached.  Unfinished
business naturally carries over to the next
month.
 6x 
  197   Tue Oct 9 14:25:54 2018 DKAu foil request to STFChttp://npg.dl.ac.uk/TargetRequests/

https://www.technologysi.stfc.ac.uk/Pages/Target-frames.aspx
 NPG_-_Online_Target_Request.pdf 
  198   Wed Oct 10 10:57:33 2018 DKChamber wheel bolt spacingFrom Ruchi's friend Rob.  WhatsApp_Image_2018-10-10_at_09.14.43.jpeg 
  199   Thu Oct 25 13:25:16 2018 KGCurrent gas cell status(Wrapped up)

    Cell b : 15um Al exit, 12.5um Al entrance. 
  
  200   Wed Oct 31 14:50:36 2018 DKStrut shipping infohttp://www.dhl.com/en/express/tracking.html?AWB=1647723055&brand=DHL   
  201   Wed Oct 31 16:01:33 2018 DKMeasuring foil thicknessA couple scans from my notes which may be
useful.
 DOC_(4).PDFDOC_(5).PDF 
  202   Fri Nov 2 17:01:16 2018 DKInventory going to CERN by easyJetConor will take:

==Black clicker case==
  
  203   Mon Nov 5 13:52:46 2018 CBHCoM energies for 44Ti(alpha,p) reaction for different entrance windows and beam energiesAssuming 200 Torr helium target., elastic
and reaction peaks do not have signifcant
overlap unless stated:
  
  204   Mon Nov 5 16:26:34 2018 DK, CBHDraft run planPlease see https://elog.ph.ed.ac.uk/ISOLDE/203
for the E_cm calculations.
  
  205   Wed Nov 7 14:27:45 2018 CBH, DKBeam Plan for Miguel and Alberto (ISOLDE beam operators)




Presently,
we are scheduled for 9 days: 
  Nov 26-28
are three (3) days nominally for beam development
  
  206   Thu Nov 8 10:01:32 2018 CBH, DKNew Struts InstallationStruts arrived and were installed on Wednesday. The
holes on one side of each of the struts to
connect the wheels to were slightly too wide
 8x 
  208   Sat Nov 10 18:48:04 2018 dkTravel schedule spreadsheethttps://docs.google.com/spreadsheets/d/1kvCWF13RMH83fssuN2_JLZXJwNL4rUGSEeKOWAIHUi0/edit#gid=0