AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE  ELOG logo
Message ID: 196     Entry time: Tue Oct 9 10:40:13 2018
Author: DK 
Subject: To-do Meeting Notes: July, August, September, October 
Each month's notes are attached.  Unfinished business naturally carries over to the next month.

This elog will be updated with new notes as necessary.

NB: These are the notes composed *prior* to the meeting, thus do not include any suggestions or corrections.
Attachment 1: 2018-07-todo.txt  2 kB  Uploaded Tue Oct 9 11:41:37 2018  | Hide | Hide all
ISOLDE 44Ti meeting notes
19 Jul 2018

==To be ordered==

*Entrance window foils, TBD
  6um Ti from Goodfellow?

*Gas bottles at CERN - Helium and (likely) Argon.  
  ISOLDE might provide them, but they never did for N2 gas
  Gas bottle will need a regulator (new or old one)

*Spanners to help repair water chiller leak.
  We need the right imperial size (x2) for Swagelok.  
  Sizes?  Email says 2x 9/16" but let's confirm

*High precision balance
  No new updates.  Do we really need it?

==To be repaired / replaced==

*Manual gate valve between SEC and Edinburgh chamber
  Responsible: Peter, Daid, CERN Vacuum Team ...

  The old one had a leak, likely from the O-ring
  (Automated fast-acting gate valve could be required)
  At some point, we may have to decide w/o input
  Path of least resistance: fix existing one
  
  (The old manual one should be around Peter's office...what's the beam pipe size?)

*Silena 7100 Quad Bias supply showed false readings during 59Cu exp.
  Responsible: Daid, ...

  Not yet repaired, Peter searches for manual
  Alternative module was found and tagged for our use, needs testing

*ORTEC 474 TFA was returned to Edinburgh, owing to 10 V baseline shift
  Responsible: Daid, ...

  Useful for photodiode trigger.  Take replacement back to CERN.

  Tagged for repair.  
  Alternative module was found and tagged for our use, needs testing
  

*Teflon chamber feet stands
  Responsible: Toby Fu

  The original foot engraving diameter was too small, by mistake.  The chamber could be shifted after alignment
  But what are the design specifications?

  EMAIL Mirco TO PICK THEM UP FOR US FROM ISOLDE

==Decisions==

*How shall we integrate the beam intensity delivered to target?
  Gold foil w/ back-scattering to photodiode?  
    Needs foil, mounts for foil & photodiode.  Other parts prepared.
  Alpha scattering in SSDs is another option

*Photodiode degrader foil for isobaric check
  Which Al foil(s) are prepared?
    In Edinburgh or CERN?
  What thickness is sufficient for 44Sc / 44Ti separation?

*Gas cell entrance window material / thickness

==Work==

*Decide beam energies
  Responsible: Conor, Alex, Daid

  1.2, 1.55, 1.88, 2.2 and 2.8 MeV/u were stated as available

*Model effect of beam spot size. 
  Responsible: Conor

  ~3 mm FWHM was achieved for 59Cu

*Gas cell
  Responsible: Katie, Conor

  Vacuum system is set up in Edinburgh, and He gas is available
  He gas bottle needs a mounting support prior to use.
    Everything is in Physics Stores
  We can continue to investigate true leak rate, gas cell handling, assembly

  Gas cell eventually needs to go to CERN.  
  Are we satisfied with the setup, or shall we get new parts?
     (e.g. several new valves, ...)

*Chamber alignment
  Responsible: Peter Black

  Chamber is currently disconnected from the beam line.
  Previously, we contacted the survey team to come assist.

*DAQ PC has any further issues to get on the network?
  Responsible: Tom Davinson  

  (If PC is turned on, contact Ruchi as she would like some data.)
Attachment 2: 2018-08-todo.txt  3 kB  Uploaded Tue Oct 9 11:41:50 2018  | Hide | Hide all
ISOLDE 44Ti meeting notes
28 Aug 2018

==To be ordered==

*Entrance window foils, TBD
  3um Ti from Goodfellow?  Is it light-tight?

*Gas bottles at CERN - Helium and (likely) Argon.  
  ISOLDE might provide them, but they never did for N2 gas
  Gas bottle will need a regulator (new or old one)

*Spanners to help repair water chiller leak.
  *FIRST CHECK VACUUM, CHILLER!*
  	NB: Might damage piping during re-assembly
  We need the right imperial size (x2) for Swagelok.  
  Sizes?  Email says 2x 9/16" but let's confirm

*High precision balance -- no need to buy
 We are welcome to use the one in the chem lab on 2nd floor
   Just wear a lab coat, and don't move other people's stuff

*PPE (Safety)
  Boots and hardhats for new members

==To be repaired / replaced==

*Manual gate valve between SEC and Edinburgh chamber
  Responsible: Peter, Daid, Conor, Katie, ...

  The old one had a leak, we don't know where
    It's on top of Peter's PC in his office

  Students can test in Edinburgh...once leak is identified: 
    Fix ourselves or send to Lesker?

*Silena 7100 Quad Bias supply showed false readings during 59Cu exp.
  Responsible: Daid, ...

  Not yet repaired, Peter searches for manual
  Alternative module was found and tagged for our use, needs testing

*ORTEC 474 TFA was returned to Edinburgh, owing to 10 V baseline shift
  Responsible: Daid, ...

  Useful for photodiode trigger.  Take replacement back to CERN.

  Tagged for repair.  
  Alternative module was found and tagged for our use, needs testing
  
*Take additional Pre-amp to CERN for Photodiode?
  There are several in the Miniball cupboard...

*Teflon chamber feet stands
  Responsible: Toby, Mirco, Daid

  The original foot engraving diameter was too small, by mistake.  
  But what are the design specifications?

  (Mirco picked these up for us, so they are in Germany?)

*Chamber stand wheel struts
  Responsible: Peter, Daid, ...

  Original ones are damaged at the ends, and also too long

  Maria suggested 120 cm.  We measured ~121 cm opening towards garage

  To make less top-heavy, we can add a lower shelf and stack weight on it

==Decisions==

*How shall we integrate the beam intensity delivered to target?
  Total integrated current, with efficiency-calibrated Ge detector
    Talk to Liam?
  Gold foil w/ back-scattering to photodiode?  
    Needs foil, mounts for foil & photodiode.  Other parts prepared.
  Alpha scattering in SSDs is another option

*Photodiode degrader foil for isobaric check
  10, 15, 20 um Al are prepared at CERN, 2 blank frames in Edinburgh
  What thickness is sufficient for 44Sc / 44Ti separation?
    (...or other suspected contamination...)

*Gas cell entrance window material / thickness

*Target ladder setup
  How many targets can fit & what should they be?
    3 mm collimator
    Photodiodes (takes two slots)
    Viewing screen (?)
    1 mm collimator (?)
    Blank target frame (?)

==Work==

*Determine beam energies
  Responsible: Conor, Alex, Daid, Karl, Alberto, ...

  1.2, 1.55, 1.88, 2.2 and 2.8 MeV/u were stated as available

  Karl mentioned the possibility of a beam test.

  Previous beam was 44Ti+13.  40Ar may be a good pilot?

*Model effect of beam spot size -- still relevant? 
  Responsible: Conor

  ~3 mm FWHM was achieved for 59Cu

*Gas cell
  Responsible: Katie, Conor

  Vacuum system is set up in Edinburgh, and He gas is available
  He gas bottle needs regulator, that's it.

  Gas cell eventually needs to go to CERN.  
  Are we satisfied with the setup, or shall we get new parts?
     (e.g. several new valves, ...)

*Chamber alignment
  Responsible: Peter Black

  Chamber is currently disconnected from the beam line.
  Previously, we contacted the survey team to come assist.
  Alignment parts are all at CERN.

*DAQ PC has any further issues to get on the network?
  Responsible: Tom Davinson  

  (If PC is turned on, contact Ruchi as she would like some data.)
Attachment 3: 2018-09-todo.txt  4 kB  Uploaded Tue Oct 9 11:42:09 2018  | Hide | Hide all
ISOLDE 44Ti meeting notes
27 Sept 2018

==To be ordered==

*Entrance window foils, TBD
  4um Ti from Goodfellow?
  9, 12 um Al from Goodfellow?
  (Some existing queries regarding Havar, et al.)

*Gas bottles at CERN - Helium and (likely) Argon.  
  ISOLDE might provide them, but they never did for N2 gas
  Gas bottle will need a regulator (new or old one)

*Spanners to help repair water chiller leak.
  *FIRST CHECK VACUUM, CHILLER!*
  	NB: Might damage piping during re-assembly
  We need the right imperial size (x2) for Swagelok.  
  Sizes?  Email says 2x 9/16" but let's confirm

*High precision balance
 Daid still needs to show Katie and Conor where the room is and what to do.
 We are welcome to use the one in the chem lab on 2nd floor
   Just wear a lab coat, and don't move other people's stuff

*PPE (Safety)
  Boots and hardhats for new members

==To be repaired / replaced==

*Manual gate valve between SEC and Edinburgh chamber
  Responsible: (Your name here)
  Lesker quotes £123 for a repair kit.  Check the elog.  Does anyone volunteer?

  New one has arrived - plan to leak check it
  We need a KF-50 to ~ KF-25 (need to check) converter

*Photodiodes
  Responsible: Daid
  We have 3 at CERN, but no more in Edinburgh.  Order more!

*Silena 7100 Quad Bias supply showed false readings during 59Cu exp.
  Responsible: Katie, Daid, ...

  Not yet repaired, Peter searches for manual
  Alternative module was found and tagged for our use, needs testing

*ORTEC 474 TFA was returned to Edinburgh, owing to 10 V baseline shift
  Responsible: Katie, Daid, ...

  Useful for photodiode trigger.  Take replacement back to CERN.

  Tagged for repair.  
  Alternative module was found and tagged for our use, needs testing
  
*Take additional Pre-amp to CERN for Photodiode?
  There are several in the Miniball cupboard...

*Teflon chamber feet stands
  Responsible: Toby, Daid

  The original foot engraving diameter was too small, by mistake.  

  They are at Daid's desk, with tracings of the proper size.

*Chamber stand wheel struts
  Responsible: Peter, Daid, Conor, Ruchi

  Original ones are damaged at the ends, and also too long

  Maria suggested 120 cm.  We measured ~121 cm opening towards garage

  To make less top-heavy, we can add a lower shelf and stack weight on it
  
  Need a measurement of bolt spacing, Ruchi has a friend who can help us.

==Decisions==

*How shall we integrate the beam intensity delivered to target?
  Total integrated current, with efficiency-calibrated Ge detector
    Talk to Liam?
  Gold foil w/ back-scattering to photodiode?  
    Needs foil, mounts for foil & photodiode.  Other parts prepared.
    Daid should contact Paul Morrall
  Alpha scattering in SSDs is most preferred.

*Photodiode degrader foil for isobaric check
  10, 15, 20 um Al are prepared at CERN, 2 blank frames in Edinburgh
  What thickness is sufficient for 44Sc / 44Ti separation?
    (...or other suspected contamination...)

*Gas cell entrance window material / thickness

*Target ladder setup
  How many targets can fit & what should they be?
    3 mm collimator
    Photodiodes (takes two slots)
    Viewing screen (?)
    1 mm collimator (?)
    Blank target frame (?)

==Work==

*Determine beam energies
  Responsible: Conor, Alex, Daid, Karl, Alberto, ...

  1.2, 1.55, 1.88, 2.2 and 2.8 MeV/u were stated as available

  Karl mentioned the possibility of a beam test.

  Previous beam was 44Ti+13.  40Ar may be a good pilot?
  
  WE AWAIT ALBERTO'S OPTICS CALCS  & CRYO MODULE SCHEDULE.

*Model effect of beam spot size -- still relevant? 
  Responsible: Conor

  ~3 mm FWHM was achieved for 59Cu

*Gas cell
  Responsible: Katie, Conor

  Vacuum system is set up in Edinburgh, and He gas is available

  Gas cell eventually needs to go to CERN.  
  
  New needle valves and some piping for the gas flow control. 

*Chamber alignment
  Responsible: Peter Black

  Chamber is currently disconnected from the beam line.
  Previously, we contacted the survey team to come assist.
  Alignment parts are all at CERN.

*DAQ PC has any further issues to get on the network?
  Responsible: Tom Davinson  
  (If PC is turned on, contact Ruchi as she would like some data.)
Attachment 4: 2018-10-todo.txt  3 kB  Uploaded Tue Oct 9 11:54:04 2018  | Hide | Hide all
ISOLDE 44Ti meeting notes
09 Oct 2018 

==To be ordered==

*Windows
  Done

*Gas bottles at CERN - Helium and (likely) Argon.  
  Gas bottle will need a regulator (new or old one)
  Emailed Karl to inquire.  N2 necessary?

*Spanners to help repair water chiller leak.
  Done

*PPE (Safety)
  Boots and hardhats for new members

*New valves for gas flow system

*Gas cell stands for each gas cell
  Order was submitted.

*Photodiodes
  We have 3 at CERN, but no more in Edinburgh.  Order more!

*Au foils

==To be repaired / replaced==

*Manual gate valve between SEC and Edinburgh chamber
  Responsible: (Your name here)
  Lesker quotes £123 for a repair kit.  Do we give up?

  New one has arrived - plan to leak check it
  Converter flange to check w/ He sniffer ordered, not arrived.

*Silena 7100 Quad Bias supply showed false readings during 59Cu exp.
  Responsible: Katie, Daid, ...

  Not yet repaired, Peter searches for manual
  Alternative module was found and tagged for our use, needs testing

*ORTEC 474 TFA was returned to Edinburgh, owing to 10 V baseline shift
  Responsible: Katie, Daid, ...

  Useful for photodiode trigger.  Take replacement back to CERN.

  Tagged for repair.  
  Alternative module was found and tagged for our use, needs testing
  
*Take additional Pre-amp to CERN for Photodiode?
  There are several in the Miniball cupboard...

*Teflon chamber feet stands
  Done

*Chamber stand wheel struts
  Responsible: Peter, Daid, Conor, Ruchi

  Original ones are damaged at the ends, and also too long

  Maria suggested 120 cm.  We measured ~121 cm opening towards garage

  To make less top-heavy, we can add a lower shelf and stack weight on it
  
  Need a measurement of bolt spacing, Ruchi has a friend who can help us.

==Decisions==

*How shall we integrate the beam intensity delivered to target?
  Total integrated current, with efficiency-calibrated Ge detector
    Talk to Liam?
  Gold foil w/ back-scattering to photodiode?  
    Needs foil, mounts for foil & photodiode.  Other parts prepared.
    Daid should contact Paul Morrall
  Alpha scattering in SSDs is most preferred.

*Photodiode degrader foil for isobaric check
  10, 15, 20 um Al are prepared at CERN, 2 blank frames in Edinburgh
  What thickness is sufficient for 44Sc / 44Ti separation?
    (...or other suspected contamination...)
  Need to know the beam energies!  This is quick work.

*Target ladder setup
  How many targets can fit & what should they be?
    3 mm collimator
    Photodiodes (takes two slots)
    Viewing screen (?)
    1 mm collimator (?)
    Blank target frame (?)

==Work==

*Gas cell
  Responsible: Katie, Conor

  Vacuum system is set up in Edinburgh, and He gas is available

  Gas cell eventually needs to go to CERN.  
  
  New needle valves and some piping for the gas flow control.

  Many windows, washers, etc are now ready to go!

  **Window material / thickness
    9, 12.5 um Al arrived.
    3 um Ti arrived, some holes but maybe serviceable
    6 um Ti had order mixup
    We can get Havar in 2 weeks privately


*Chamber alignment
  Responsible: Peter Black

  Chamber is currently disconnected from the beam line.
  Previously, we contacted the survey team to come assist.
  Alignment parts are all at CERN.

*DAQ PC has any further issues to get on the network?
  Responsible: Tom Davinson  
  (If PC is turned on, contact Ruchi as she would like some data.)
Attachment 5: 2018-10-23-todo.txt  2 kB  Uploaded Tue Oct 23 14:02:23 2018  | Hide | Hide all
ISOLDE 44Ti meeting notes
23 Oct 2018 

==To be ordered==

*Gas bottles at CERN - Helium and (likely) Argon.  
  Gas bottles for He, Ar can be supplied by CERN
  N2 was also approved, but bear in mind volume required

*Spanners to help repair water chiller leak.
  Ordered but did they arrive?

*PPE (Safety)
  Boots and hardhats for new members

*New valves for gas flow system

*Gas cell stands for each gas cell
  Order was submitted.

*Photodiodes
  Order of 10 to arrive 7 Nov

*Au foils
  Order placed with Paul at STFC

==To be repaired / replaced==

*Manual gate valve between SEC and Edinburgh chamber
  New one has arrived - plan to leak check it
  Converter flange to check w/ He sniffer ordered arrived
    Awaiting clamps that were ordererd

  Repair kit was ordered.

*Silena 7100 Quad Bias supply showed false readings during 59Cu exp.
  Responsible: Katie, Daid, ...

  Not yet repaired, Peter searches for manual
  Alternative module was found and tagged for our use, needs testing

*ORTEC 474 TFA was returned to Edinburgh, owing to 10 V baseline shift
  Responsible: Katie, Daid, ...

  Useful for photodiode trigger.  Take replacement back to CERN.

  Tagged for repair.  
  Alternative module was found and tagged for our use, needs testing
  
*Take additional Pre-amp to CERN for Photodiode?
  There are several in the Miniball cupboard...

*Teflon chamber feet stands - done

*Chamber stand wheel struts
  Responsible: Peter, Daid

  We have the necessary preparations, we await Peter.
  We will use 118 cm since garage direction is ~121 cm

==Decisions==

*How shall we integrate the beam intensity delivered to target?
  Total integrated current, with efficiency-calibrated Ge detector
  Gold foil w/ back-scattering to photodiode?  
    Needs foil, mounts for foil & photodiode.  Other parts prepared.
  Alpha scattering in SSDs is most preferred.


*Photodiode degrader foil for isobaric check
  10, 15, 20 um Al are prepared at CERN, 2 blank frames in Edinburgh
  What thickness is sufficient for 44Sc / 44Ti separation?
    (...or other suspected contamination...)
  Need to know the beam energies!  This is quick work.

*Target ladder setup -- IMPORTANT
  How many targets can fit & what should they be?
    3 mm collimator
    Photodiodes (takes two slots)
    Viewing screen (?)
    1 mm collimator (?)
    Blank target frame (?)

==Work==

*Gas cell
  Responsible: Katie, Conor

  Gas cell eventually needs to go to CERN.  
  
  New needle valves and some piping for the gas flow control.

  **Window material / thickness
    9, 12.5 um Al 
    3, 6 um Ti 
    2.5 um Havar 

  3 um Ti, 12.5 um Al are installed with leak rates < 1 Torr/hr.


*Chamber alignment
  Responsible: Peter Black

  Previously, we contacted the survey team to come assist.
  Alignment parts are all at CERN.

*DAQ PC has any further issues to get on the network?
  Responsible: Tom Davinson  
  (If PC is turned on, contact Ruchi as she would like some data.)
Attachment 6: 2018-10-31-todo.txt  3 kB  Uploaded Wed Oct 31 12:42:57 2018  | Hide | Hide all
ISOLDE 44Ti meeting notes
31 Oct 2018 

==ENSAR2 status==
  We have some information from people, but not enough.
  When is the deadline?

==Meetings at CERN next week==

*Beam energy w/ Alberto

*Crane use w/ Olof

*Survey team w/ Peter Skypes

*RILIS people for laser ideas

*Find Liam if we need the alpha source

==To be ordered==

*PPE (Safety)
  Boots and hardhats for new members

*New valves for gas flow system
  Done.  Peter will help weld it up later.

*Gas cell stands for each gas cell
  Order is completed.  We are awaiting M2 screws now.

*Photodiodes
  Order of 10 to arrive 7 Nov

*Au foils
  Paul at STFC confirmed the order.

==To be repaired / replaced==

*Manual gate valve between SEC and Edinburgh chamber
  New one has arrived - plan to leak check it
    Awaiting clamps that were ordererd

  Repair kit was ordered.  Maybe Katie can enjoy this.

*Silena 7100 Quad Bias supply showed false readings during 59Cu exp.
  Responsible: Katie, Daid, ...

  Not yet repaired, Peter searches for manual
  Alternative module was found and tagged for our use, needs testing

*ORTEC 474 TFA was returned to Edinburgh, owing to 10 V baseline shift
  Responsible: Katie, Daid, ...

  Useful for photodiode trigger.  Take replacement back to CERN.

  Tagged for repair.  
  Alternative module was found and tagged for our use, needs testing
  
*Take additional Pre-amp to CERN for Photodiode?
  There are several in the Miniball cupboard...

*Chamber stand wheel struts
  These were mailed to CERN attn: Karl Johnston.  He confirmed with DHL.

==Decisions==

*How shall we integrate the beam intensity delivered to target?
  Total integrated current, with efficiency-calibrated Ge detector
  Gold foil w/ back-scattering to photodiode?  
    Needs foil, mounts for foil & photodiode.  Other parts prepared.
  Alpha scattering in SSDs is most preferred.


*Photodiode degrader foil for isobaric check
  10, 15, 20 um Al are prepared at CERN, 2 blank frames in Edinburgh
  What thickness is sufficient for 44Sc / 44Ti separation?
    (...or other suspected contamination...)
  Need to know the beam energies!  This is quick work.

*Target ladder setup -- IMPORTANT
  Peter has made a jig for us, it looks promising.
  How many targets can fit & what should they be?
    3 mm collimator
    Photodiodes (takes two slots)
    Viewing screen (?)
    1 mm collimator (?)
    Blank target frame (?)

==Work==

*Gas cell
  Responsible: Katie, Conor

  Gas cell eventually needs to go to CERN.  
  
  **Window material / thickness
    9, 12.5 um Al 
    3, 6 um Ti 
    2.5 um Havar 

  3 um Ti, 12.5 um Al are installed with leak rates < 1 Torr/hr.

*Chamber alignment
  Responsible: Peter Black

  Previously, we contacted the survey team to come assist.
    We'll have a chat next week.  Peter can join w/ Skype.
  Alignment parts are all at CERN, _except a gas cell prism holder_

*DAQ PC has any further issues to get on the network?
  Responsible: Daid, Tom Davinson  
  (If PC is turned on, contact Ruchi as she would like some data.)

*Cobbling things together at CERN next week
  Responsible: Daid, Conor, ...

  What should we take?  
    Rainbows and unicorns.
  What should we bring back?
    Some chocolate, maybe

==Simulation code==
  Responsible: Daid, Alex, Conor, ...

  Sounds like some people are reinventing the wheel in Canada.  
  What's the best way to collaborate and share?  Probably git.
ELOG V3.1.4-unknown