  41   Mon Nov 6 10:52:58 2017 Peter Blackalignment hardware drawings   ladder_alignment_block.PDFS2_alignment_bar.PDFalignment_plug_70mm.PDFalignment_plug.PDF 
  43   Mon Nov 6 16:12:47 2017 Peter Blackchamber drawingswork in progress.   FullAssemb2.PDFsection.PDF 
  44   Tue Nov 7 14:38:25 2017 Ruchi GargTarget ladder configuration   TargetLadder.pdf 
  45   Wed Nov 8 17:12:01 2017 TDMIDAS logsAttachment 1 - snoop -d bge1 log following
MVME CPU reset
 snoop.logvmecpu.log 
  46   Wed Nov 8 20:40:33 2017 Daid, RuchiRun 49Header: First test with RIB.  Irises closed.
End: End
  
  47   Wed Nov 8 20:46:23 2017 Daid, RuchiRun 50Header: First run with irises open.  30 min
run.
Ender: Call from PS-Booster.  Stop run.
  
  48   Wed Nov 8 21:21:31 2017 Ruchi Garg, DaidRunLogTemplateHeader:
Ender: 
====================================================
  
  49   Wed Nov 8 22:00:00 2017 daidScalarsPresent scalars:
0: Ungated
1: Gated
  
  50   Wed Nov 8 22:08:55 2017 DaidRun 51Header: Restart 5.0 MeV/u CH2 with 3 PS rings.
Ender: Stop run.  We want good data with
a smaller file size for fast analysis, as
  
  51   Wed Nov 8 22:21:35 2017 RuchiBeam transmissionBy the end of beam tuning (around 6pm),
beam transmission between Faraday cups at
the end of SEC and at end of Edinburgh chamber:
  
  52   Wed Nov 8 23:06:48 2017 Daid, RuchiRun 52 (junk)(Junk -- see comments)
====================================================
Run number : 52
  
  53   Wed Nov 8 23:14:38 2017 Daid, Ruchi, MircoRun 53Header: Restart 5.0 MeV/u w/ CH2 after PS
comes back (3 rings until the morning)
Ender: End
  
  54   Wed Nov 8 23:46:32 2017 DaidCharge State Distributions Faraday cup readout at the end of our chamber
should change based on whether or not the
target is in and also the 59Cu beam energy.
 charge-state-distribution-3.6.jpgcharge-state-distribution-4.0.jpgcharge-state-distribution-4.4.jpgcharge-state-distribution-4.7.jpgcharge-state-distribution-5.0.jpg 
  55   Thu Nov 9 01:24:01 2017 Daid. MircoRun 54Header: Continue with 5.0 MeV/u and CH2
Ender: Checked control room, about 2:40.
 Target current is 2 A (low...should be 430
  
  56   Thu Nov 9 03:32:55 2017 Daid. MircoRun 55Header: Continue 5.0 MeV/u with CH2 after
target re-heating
Ender: End
 gps-r55.jpgpsb-run55.jpg 
  57   Thu Nov 9 05:33:50 2017 TDCharge State Distributions > Faraday cup readout at the end of our chamber
should change based on whether or not the
target is in and also the 59Cu 
  
  58   Thu Nov 9 05:35:44 2017 Daid. MircoRun 56
Header: 5.0 MeV/u CH2, Laser 2 is turned
off on purpose to check background.
  
  59   Thu Nov 9 06:02:41 2017 Daid. MircoRun 57Header: Continue with 5.0 MeV/u and CH2. 
Laser back on.
Ender: 
  
  60   Thu Nov 9 06:30:35 2017 Daid, MircoSpectra (Shift 1)Screen shots for accumulated data before the
target went down.  Should be (at least) runs
53 & 54 inclusive, possibly back to the start
 12x 
  61   Thu Nov 9 07:15:49 2017 MDTips for Babysitting ISOLDE during shiftsfrom ISOLDE webpage  Babysitting_ISOLDE_from_the_CCC.pdf 