AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 10 of 11  ELOG logo
ID Date Author Subjectup Text Attachments
  196   Tue Oct 9 10:40:13 2018 DKTo-do Meeting Notes: July, August, September, OctoberEach month's notes are attached.  Unfinished
business naturally carries over to the next
month.
 6x 
  208   Sat Nov 10 18:48:04 2018 dkTravel schedule spreadsheethttps://docs.google.com/spreadsheets/d/1kvCWF13RMH83fssuN2_JLZXJwNL4rUGSEeKOWAIHUi0/edit#gid=0

or
  
  92   Sat Nov 11 00:01:41 2017 Daid. MircoTrigger and scalars for 4.0 MeV/uTom et al. tuned the trigger this evening,
before we began the runs.  (Run 82, or Run
83??)
  
  16   Sat Sep 9 09:39:38 2017 ClaudiaVacuum Readings at ISOLDE HallThursday, 7th September:

Vaccum after pumping all night
preamps off, chiller off
  
  3   Sun Feb 19 12:22:16 2017 td, mdVacuum and detector test------17.2.17 ------------------------------------------------------

closing chamber 
  
  187   Thu Aug 23 18:57:15 2018 DKWhat daid is taking from ISOLDE to Edinburgh1 bolt for chamber stand structure, for reference
for new struts.
  
  186   Thu Aug 23 18:23:27 2018 DKWhere to find (our) stuff at ISOLDE=Overview=

Shoes, hard hats, 'underpants', spiders,
 edinburgh-notices-daid.pdf 
  22   Thu Sep 14 14:07:21 2017 pbalignment Chat with survey team

1. mauf plugs for both ends of
chamber with concentric 8mmH7 holes, with
 2017.11.02_HISO_XT03_EdinburghChamber.pdf 
  41   Mon Nov 6 10:52:58 2017 Peter Blackalignment hardware drawings   ladder_alignment_block.PDFS2_alignment_bar.PDFalignment_plug_70mm.PDFalignment_plug.PDF 
  43   Mon Nov 6 16:12:47 2017 Peter Blackchamber drawingswork in progress.   FullAssemb2.PDFsection.PDF 
  19   Thu Sep 14 09:47:02 2017 dkdiscussion with beam operatorsCERN side
     Faraday cup at the end of SEC, ideally
with automated control to insert and remove
  
  40   Mon Nov 6 10:50:33 2017 Peter Blackfoil mount drawings   SiPD_foil_mount.PDFfOIL_HOLDER.PDF 
  107   Sat Nov 11 17:19:54 2017 ASM, CL, TD...halflifePlaced a hand held rad monitor near the
faraday cup and took rate readings every
20 seconds, right after inserting the gate
 Screen_Shot_2017-11-11_at_18.25.54.png 
  Draft   Thu Sep 28 03:34:20 2017 dkheavy ion degrader foil
--text from email--
Using Claudia's code, I added a layer of
 degrader.pdf 
  33   Thu Oct 19 14:41:19 2017 daidheavy ion degrader foil - full / newSee entry https://elog.ph.ed.ac.uk/ISOLDE/28
for a full description, but editing the same
elog is altering attachment numbers etc.
 8x 
  28   Thu Sep 28 03:38:18 2017 dkheavy ion degrader foil - updated--original email text--
Using Claudia's code, I added a layer of
Al foil before the heavy ion
 8x 
  108   Sat Nov 11 17:36:54 2017 ASMmore halflife stuffFitting those half life data more reasonably...
fitted the decay curve with y=a*exp(-b*t)+c
to all the data points, comes up with t1/2=(85.8+/-2.6)s
 Screen_Shot_2017-11-11_at_18.38.37.png 
  78   Thu Nov 9 23:10:38 2017 MDpreparation for Carbon C_09 (Run 75)10/11/17: 00:03

switch target ladder to Pos #5: 82.44 mm
  
  125   Sun Nov 12 17:44:49 2017 MB DK RGrun 111Header:  empty target, 4.4 MeV/u
Ender: End
====================================================
  
  126   Sun Nov 12 18:32:52 2017 MB DK run 112Header: 4.4 MeV/u CH2_16 sample
Ender: 
====================================================
  
ELOG V3.1.4-unknown