AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 3 of 11  ELOG logo
ID Date Author Subjectdown Text Attachments
  49   Wed Nov 8 22:00:00 2017 daidScalarsPresent scalars:
0: Ungated
1: Gated
  
  34   Tue Oct 24 09:27:24 2017 Peter Black, DKSafety words

Plate 1.  Contents of chamber
  
  48   Wed Nov 8 21:21:31 2017 Ruchi Garg, DaidRunLogTemplateHeader:
Ender: 
====================================================
  
  104   Sat Nov 11 14:15:12 2017 CLW, PJW, RGRun94Header: 3.99 MeV/u and C_25. 
Ender: We stop because the lasers are being
cleaned, and we saw the scalars drop.  See
  
  111   Sat Nov 11 18:31:10 2017 TD, DKRun 99Header: 4.0MeV/u 59Cu20+ + (CH2)n, Laser #2
*on*
Ender: Normal run stop
  
  110   Sat Nov 11 18:06:42 2017 TD, DKRun 98Header: CH2 target in, Laser #2 off, 4.0 MeV/u
Ender: ends OK
====================================================
  
  109   Sat Nov 11 17:45:10 2017 DK, TD, ASM, RG, MDRun 97Header: CH2 target in, Laser #2 off, 4.0 MeV/u
Ender: Stopped run to modify DAQ trigger
  
  105   Sat Nov 11 15:17:24 2017 CLW, PJW, RG, TD, MD, DKRun 95Header: Continue with 4.0 MeV/u on Carbon
after laser cleaning
Ender: 
  
  103   Sat Nov 11 12:16:28 2017 CLW, PJW, RGRun 93
Header: 3.99 MeV/u and CH2_30+25. Beam is
back
  
  102   Sat Nov 11 11:21:22 2017 CLW, PJW, RGRun 92
Header: 3.99 MeV/u and CH2_30+25. Beam is
back
  
  101   Sat Nov 11 09:20:56 2017 CLW, MD, PJWRun 91
Header: 3.99 MeV/u and CH2_30+25. Beam is
back
  
  99   Sat Nov 11 07:44:16 2017 MD, CLW, PJWRun 90
Header: 3.99 MeV/u and CH2_30+25. Beam is
back
 171111_0858_Laser_optimizedcondition.jpg 
  98   Sat Nov 11 06:57:14 2017 MD, CLW, PJWRun 89
Header: 3.99 MeV/u and CH2_30+25. Continue
after Laser update (cleaning), but still
 171111_0828_beamisback.jpg 
  96   Sat Nov 11 03:58:58 2017 MD, ASMRun 87
Header: 3.99 MeV/u and CH2_30+25.
Ender: 
 171111_0638_beamcurrentdown.jpg 
  95   Sat Nov 11 01:40:48 2017 MD, DMK, ASMRun 86
Header: 3.99 MeV/u and CH2_30+25. Continue
after reheat the primary target (GPS) between
 171111_0344_Beamcurrent.jpg171111_0435_Beamcurrent.jpg171111_0440_Laser_02.jpg171111_0440_Laser_03.jpg171111_0441_Laser_04.jpg 
  93   Sat Nov 11 00:24:19 2017 MD, ASM, DMKRun 85
Header: 3.99 MeV/u and CH2_30+25.
Ender: primary target current (RED) down
  
  91   Fri Nov 10 21:59:05 2017 SL, MDRun 84
Header: 3.99 MeV/u and CH2_30+25.
Ender:

====================================================
Run
number : 84
Date : 10/11 to 11/11
Start
  
  90   Fri Nov 10 20:30:57 2017 SLRun 83 


Header: 3.99 MeV/u and CH2_30+25.
Ender:
Recompiling sort code.
====================================================
Run
  
  89   Fri Nov 10 19:57:49 2017 SLRun 82
Header: 3.99 MeV/u and CH2_30+25.
Ender:

====================================================
Run
number : 82
Date : 10/11
Start time :
  
  88   Fri Nov 10 19:01:13 2017 SLRun 81 


Header: 3.99 MeV/u and CH2_30+25.
Ender:
Stopped to check E hardware.
====================================================
Run
  
ELOG V3.1.4-unknown