ID |
Date |
Author |
Subject |
Text |
 |
83
|
Fri Nov 10 07:00:14 2017 |
MD, CLW, ASM, TD | Run 80 |
Header: 4.7 MeV/u and CH2_30+25.
Ender: beam stop at PS (6 hour interruption)
|
 |
82
|
Fri Nov 10 04:53:34 2017 |
MD, ASM | Run 79 | Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
|
|
81
|
Fri Nov 10 04:18:41 2017 |
MD, ASM | Run 78 | Header: 4.7 MeV/u and Empty frame.
Ender:
====================================================
|
|
80
|
Fri Nov 10 02:12:06 2017 |
MD, ASM, DK | Run 77 |
Header: 4.7 MeV/u and C_09. continue after
fixing IHS Cavity (part of normal conducting |
|
77
|
Thu Nov 9 21:31:16 2017 |
SL | Run 74 |
Header: 4.7 MeV/u and CH2_30+25.
Ender:
STOP due to PSB fire.
====================================================
Run
number : 74
Date : 09/11
Start time : |
  |
76
|
Thu Nov 9 20:46:29 2017 |
SL | Run 73 |
Header: 4.7 MeV/u and CH2_30+25.
Ender:
NO BEAM FROM PSB - called CCC and stopped
run.
====================================================
Run |
|
74
|
Thu Nov 9 18:56:13 2017 |
SL | Run 72 |
Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
Run
number : 72
Date : 09/11
Start time : |
|
75
|
Thu Nov 9 19:06:08 2017 |
SL | Run 68-71 | JUNK |
|
73
|
Thu Nov 9 17:35:32 2017 |
RG | Run 67 |
Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
Run
number : 67
Date : 09/11
Start time : |
|
71
|
Thu Nov 9 16:30:15 2017 |
SL | Run 66 |
Header: 4.7 MeV/u and CH2_30+25. UPDATED
Trigger (p+n E OR p+n HI (with 2^8 prescaler))
Ender:
====================================================
Run |
|
70
|
Thu Nov 9 15:55:56 2017 |
SL | Run 65 |
Header: 4.7 MeV/u and CH2_30+25. UPDATED
Trigger (E - corrected, not HI, now ~50%
live time)
Ender:
====================================================
Run |
|
69
|
Thu Nov 9 15:34:14 2017 |
SL | Run 64 |
Header: 4.7 MeV/u and CH2_30+25. UPDATED
Trigger (JUST E, not HI, now ~50% live time)
Ender:
Stopping as trigger seems slightly off
====================================================
Run |
|
68
|
Thu Nov 9 15:03:21 2017 |
SL | Run 63 |
Header: 4.7 MeV/u and CH2_30+25. UPDATED
Trigger (dE+E, not HI, now ~50% live time)
Ender:
====================================================
Run |
|
66
|
Thu Nov 9 12:14:05 2017 |
SL | Run 62 |
Header: 4.7 MeV/u and CH2_30+25.
Ender:
====================================================
Run
number : 62
Date : 9 / 11
Start time : |
|
65
|
Thu Nov 9 10:15:38 2017 |
Sarah Lonsdale | Run 61 |
Header: 5.0 MeV/u and Carbon (C_25).
Ender:
====================================================
Run
number : 61
Date : 9 / 11
Start time : |
|
64
|
Thu Nov 9 09:49:03 2017 |
Sarah Lonsdale | Run 60 |
Header: 5.0 MeV/u and Empty Frame.
Tuned beam to lower scatter, solved dE counting
issue. Pulser scaler has been added.
Ender: |
|
59
|
Thu Nov 9 06:02:41 2017 |
Daid. Mirco | Run 57 | Header: Continue with 5.0 MeV/u and CH2.
Laser back on.
Ender:
|
|
58
|
Thu Nov 9 05:35:44 2017 |
Daid. Mirco | Run 56 |
Header: 5.0 MeV/u CH2, Laser 2 is turned
off on purpose to check background.
|
|
56
|
Thu Nov 9 03:32:55 2017 |
Daid. Mirco | Run 55 | Header: Continue 5.0 MeV/u with CH2 after
target re-heating
Ender: End
|
 |
55
|
Thu Nov 9 01:24:01 2017 |
Daid. Mirco | Run 54 | Header: Continue with 5.0 MeV/u and CH2
Ender: Checked control room, about 2:40.
Target current is 2 A (low...should be 430 |
|