AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 5 of 11  ELOG logo
ID Date Author Subjectdown Text Attachments
  53   Wed Nov 8 23:14:38 2017 Daid, Ruchi, MircoRun 53Header: Restart 5.0 MeV/u w/ CH2 after PS
comes back (3 rings until the morning)
Ender: End
  
  52   Wed Nov 8 23:06:48 2017 Daid, RuchiRun 52 (junk)(Junk -- see comments)
====================================================
Run number : 52
  
  50   Wed Nov 8 22:08:55 2017 DaidRun 51Header: Restart 5.0 MeV/u CH2 with 3 PS rings.
Ender: Stop run.  We want good data with
a smaller file size for fast analysis, as
  
  47   Wed Nov 8 20:46:23 2017 Daid, RuchiRun 50Header: First run with irises open.  30 min
run.
Ender: Call from PS-Booster.  Stop run.
  
  46   Wed Nov 8 20:40:33 2017 Daid, RuchiRun 49Header: First test with RIB.  Irises closed.
End: End
  
  184   Thu Nov 16 16:24:29 2017 RG CLW MDRun 173 Pulse Walkthrough HI n-side Header: Pulser walkthrough, HI n-side, trigger
on HI detector this time
Ender: Change to digital pulser to check
  
  183   Thu Nov 16 16:14:04 2017 RG CLW MDRun 172 Pulse Walkthrough HI n-side Header: Pulser walkthrough, HI n-side
Ender: Change to digital pulser to check
as non-linearity was observed at low amplitudes.
  
  182   Thu Nov 16 16:06:07 2017 RG CLW MDRun 171 Pulse Walkthrough HI n-side Header: Pulser walkthrough, HI n-side
Ender: negative pulser, rise time 0.05 us,
fall time 1ms, delay .5 us,ref INT, width
  
  181   Thu Nov 16 15:57:29 2017 RG CLW MDRun 170 Pulse Walkthrough HI p-side Header: Pulser walkthrough, HI p-side
Ender: positive pulser, fall time 1ms, delay
250 ns, 10 V in steps of 1, 250 Hz
  
  180   Thu Nov 16 15:43:48 2017 RG CLW MDRun 169 Pulse Walkthrough E n-side Header: Pulser walkthrough, E n-side
Ender: negative pulser, rise time 0.05 us,
fall time 1ms, delay .5 us,ref INT, width
  
  178   Thu Nov 16 15:33:24 2017 RG CLW MDRun 168 Pulse Walkthrough E p-side Header: Pulser walkthrough, E p-side
Ender: positive pulser, fall time 1ms, delay
250 ns, 6 V in steps of 0.5, 250 Hz
  
  179   Thu Nov 16 15:37:35 2017 RG, MD, CLWRun 167 JUNK    
  177   Thu Nov 16 15:24:42 2017 RG CLW MDRun 166 Pulse Walkthrough dE n-side Header: Pulser walkthrough, dE n-side
Ender: negative pulser, rise time 0.05 us,
fall time 1ms, delay .5 us,ref INT, width
  
  176   Thu Nov 16 15:14:39 2017 RG CLW MDRun 165 Pulse Walkthrough dE p-side Header: Pulser walkthrough, dE p-side
Ender: positive pulser, fall time 1ms, delay
250 ns, 1.6 V in steps of 0.2, 250 Hz
  
  175   Thu Nov 16 11:20:51 2017 RG CLW MDRun 162 -HI det calibrationHeader: 4alpha source - Heavy Ion detector
calibration
Ender: 
  
  174   Wed Nov 15 16:24:35 2017 RG CLWRun 160 - strip numbering E detectorHeader: 4alpha source off center (to the top)
Ender: 
====================================================
  
  173   Wed Nov 15 16:05:25 2017 RG CLWRun 159 - E detector calibrationHeader: 4alpha source run for E det calubration
Ender: 
====================================================
  
  172   Wed Nov 15 15:41:41 2017 RG CLWRun 157 - EJunkHeader: 4alpha source
Ender: 
====================================================
  
  169   Wed Nov 15 11:33:31 2017 RG CLWRun 155 - calibration del EHeader: 4alpha source run for delE detector
calibration
Ender: 
  
  167   Wed Nov 15 05:26:46 2017 DK, MD, CLWRun 153Header: Continue with CH2 and 5.0 MeV/u
Ender: end of beam time
====================================================
  
ELOG V3.1.4-unknown