AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
K40, Page 2 of 2
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
26 Entries
Goto page
Previous
1
, 2
All
ID
Date
Author
Subject
Text
25
Fri Nov 8 11:05:14 2024
Selin
Energy Deposition Plot of K40 Runs
This is the energy deposited vs neutron
energy plot of all ~220 runs of K40 and a
few resonances can be seen.
23
Tue Oct 22 08:40:18 2024
Francisco García Infantes
End of the campaign. Reference samples measurement
October 22th. It's planned to remove
the dummy sample on beam. We are planning
to measured 4 references samples during the
27
Mon Jan 27 15:19:16 2025
Francisco García Infantes
DSSSD Data processing
I want to update about the DSSSD analysis
and the processing routine. First, I attach
a few screenshots of how the average signals
6
Fri Sep 13 08:43:13 2024
CLW
Cabling
Detector
Bunker
Signal
patch panel
signal
17
Thu Sep 19 15:38:24 2024
Selin
B2 Runs
Two different runs of B2 and the DEED-EDET
amplitudes.
10
Sun Sep 15 21:15:48 2024
CLW
Amplitude spectra
Strip 13 ampltiude spectra for the LiF
and B samples. Also a picture of a simulation
of what would be expected in a 20 um detector
Goto page
Previous
1
, 2
All
ELOG V3.1.4-unknown