Entry  Thu Feb 12 12:18:16 2026, CLW, paper Hanselman-2024-Improved-modeling-of-neutron-induce.pdf
 
Entry  Mon Mar 2 10:38:42 2026, CLW, detector voltage change before Run 55 
preamp B detector (DSSSD 2) on 100 V, DSSSD 1 still on 70
Entry  Thu Jan 29 16:16:46 2026, Francisco García Infantes, SetUp Status Preamp_Modules.jpegChamber_In.jpegFrom_Chamber.jpegVoltage_Cable.jpeg
Here is a brief status update on the chamber setup.

At the moment, we have all the main components required for the experiment related to the chamber:



Vacuum chamber
Entry  Mon Mar 2 11:11:18 2026, FGI, TD, SB, CLW, Second configuration. DSSSD1_Voltage_New.jpegDSSSD2_Voltage_New.jpeg
After the first weekend, we change the setup configuration. We removed the shadow cone, and we placed the chamber closer to the LiF target.

The voltage was increased upto 100V for both detectors, but there was a problem in DSSSD1. Therefore, The voltage was setup at 70V for DSSSD
#1 and 100V for DSSSD #2.
Entry  Thu Mar 5 09:24:21 2026, FGI, SB, Run62 
Gold + Mylar sample in beam

Starting time: 15:32:00

Stop time : 08:13:55
Entry  Fri Mar 6 08:56:26 2026, FGI, SB, Run 65 Am_241_Source.jpeg
Am-241 calibration source. Towards DSSSD #2 (PreAmp B) upstream detector

Starting time: 08:41:21

Stop time :
Entry  Fri Mar 6 08:55:16 2026, FGI, SB, Run 64 
LiF #7 sample in beam

Starting time: 15:11:10

Stop time : 08:14:22
Entry  Thu Mar 5 09:25:45 2026, FGI, SB, Run 63 
LiF #8 sample in beam

Starting time: 08:34:15

Stop time : 14:53:02
Entry  Thu Mar 5 09:22:58 2026, FGI, SB, Run 61 
Boron-10 #3 sample in beam

Starting time: 08:49:16

Stop time : 15:07:34
Entry  Thu Mar 5 09:21:10 2026, FGI, SB, Run 60 
NaCl #5 sample in beam

Starting time: 15:29:51

Stop time : 08:19:57
Entry  Tue Mar 3 15:28:37 2026, FGI, SB, CLW, Run 59 
Before this run, we change the target for the neutron source. We are using a Triton target of ~200 ug/cm².

Starting time: 11:14:32

Stop: 15:03:16.
Entry  Tue Mar 3 08:25:45 2026, FG,SB,CLW, Run 58 

start: 08:24:49, 3.3.2026
stop: 10:13:25
blocks: 3062

Flux monitor

Start: 09:20:43

Duration: 6531
Entry  Tue Mar 3 08:24:06 2026, FG,SB,CLW, Run 57 
Start: 15:45:30, 2.3. 2026

Stop: 07:57:05 3.3. 2026

Blocks: 25524
Entry  Mon Mar 2 13:24:11 2026, FG,SB,CLW, Run 56 

start: 13:28:38, 2.3.2026
stop:  15:05:22, 2.3.2026
blocks:   2206

LiF no. 7 in beam
Entry  Mon Mar 2 13:22:52 2026, FG,SB,CLW, Run 55  

start: 10:14:0531 2.3.26
stop: 12:57:08 2.3.26
blocks: 3855

 

NaCl No. 4
Entry  Mon Mar 2 09:43:05 2026, FG,SB,CLW,TD, Run 54 

start: 09:36:05 2.3.26
stop: 09:43:49 2.3.26
blocks: 14

Cu rod taken out, run in neutron beam with NaCl target. Distance chamber to
target is 6.5 cm. Run stopped due to high trigger rate in channels 138,144. 
Entry  Sat Feb 28 08:59:14 2026, SB, TD, FGI, R53 6x

start: 16:14:44 27.2.26
stop: 08:38:26 2.3.26
Entry  Fri Feb 27 15:17:59 2026, SB, TD, FGI, R52 
Start: 15:06:06 GMT
Stop: 16:13:45
Blocks: 875
Entry  Fri Feb 27 14:38:28 2026, SB, TD, FGI, R51 9.png

start: 14:31:03 (w23 is set to GMT)
stop: 14:38:09
Entry  Sat Feb 28 12:09:56 2026, TD, Offline analysis data file R52 8x

Offline data analysis of data file R52 
c. 1h 2.25MeV neutrons from 10uA p+ + 410ug/cm2 LiF -> copper block -> sample #4 Mylar+NaCl+197Au 