AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40 MONNET
  MONNET, Page 2 of 2  ELOG logo
Entry  Mon Mar 2 13:22:52 2026, FG,SB,CLW, Run 55  

start: 10:14:0531 2.3.26
stop: 12:57:08 2.3.26
blocks: 3855

 

NaCl No. 4
Entry  Mon Mar 2 13:24:11 2026, FG,SB,CLW, Run 56 

start: 13:28:38, 2.3.2026
stop:  15:05:22, 2.3.2026
blocks:   2206

LiF no. 7 in beam
Entry  Tue Mar 3 08:24:06 2026, FG,SB,CLW, Run 57 
Start: 15:45:30, 2.3. 2026

Stop: 07:57:05 3.3. 2026

Blocks: 25524
Entry  Tue Mar 3 08:25:45 2026, FG,SB,CLW, Run 58 

start: 08:24:49, 3.3.2026
stop: 10:13:25
blocks: 3062

Flux monitor

Start: 09:20:43

Duration: 6531
Entry  Mon Jan 26 11:29:14 2026, Claudia, Count rate estimate and particle energies kinematics.cneutron_fluxes.xlsx
Count rate estimate for all reaction measurements planned. 


Assumptions:
Entry  Thu Feb 12 12:18:16 2026, CLW, paper Hanselman-2024-Improved-modeling-of-neutron-induce.pdf
 
Entry  Mon Mar 2 09:47:13 2026, CLW, Clock Synchronisation Edinburgh PC , Geel monitor PC 
T=0: Edinburgh Time 9:39:00

T=1:40: Geel Time 10:37:00

 
Entry  Mon Mar 2 10:38:42 2026, CLW, detector voltage change before Run 55 
preamp B detector (DSSSD 2) on 100 V, DSSSD 1 still on 70
Entry  Wed Mar 4 11:00:57 2026, CLW, 35Cl(n,p) proton peak, run with 3 MeV neutrons over night Cl35_Proton_Peak.png
Plot from Fran showing peak around expected proton energy in both detectors. Top half are strips of detector placed at 180degrees wrt neutron beam, bottom
half 0 degrees. Hence, proton peak from bottom half should be at slightly higher energy. 

 
Entry  Mon Mar 2 10:39:30 2026, SW, TD, SB, CLW, Detector SetUp. First Configuration 9x
The first sample on beam is the NaCl target #4. The shado cone was placed between the LiF target and the chamber.

The shadow cone was a cupper cilinder of 4cm diameter and 30 cm lenght, placed at 0.8 cm from the LiF target and 2.8 cm from the chamber. See
first figure 1.
ELOG V3.1.3-7933898