Mon Mar 2 13:22:52 2026, FG,SB,CLW, Run 55
|
start: 10:14:0531 2.3.26
stop: 12:57:08 2.3.26
blocks: 3855
NaCl No. 4 |
Mon Mar 2 13:24:11 2026, FG,SB,CLW, Run 56
|
start: 13:28:38, 2.3.2026
stop: 15:05:22, 2.3.2026
blocks: 2206
LiF no. 7 in beam |
Tue Mar 3 08:24:06 2026, FG,SB,CLW, Run 57
|
Start: 15:45:30, 2.3. 2026
Stop: 07:57:05 3.3. 2026
Blocks: 25524 |
Tue Mar 3 08:25:45 2026, FG,SB,CLW, Run 58
|
start: 08:24:49, 3.3.2026
stop: 10:13:25
blocks: 3062
Flux monitor
Start: 09:20:43
Duration: 6531 |
Mon Jan 26 11:29:14 2026, Claudia, Count rate estimate and particle energies 
|
Count rate estimate for all reaction measurements planned.
Assumptions: |
Thu Feb 12 12:18:16 2026, CLW, paper
|
| |
Mon Mar 2 09:47:13 2026, CLW, Clock Synchronisation Edinburgh PC , Geel monitor PC
|
T=0: Edinburgh Time 9:39:00
T=1:40: Geel Time 10:37:00
|
Mon Mar 2 10:38:42 2026, CLW, detector voltage change before Run 55
|
| preamp B detector (DSSSD 2) on 100 V, DSSSD 1 still on 70 |
Wed Mar 4 11:00:57 2026, CLW, 35Cl(n,p) proton peak, run with 3 MeV neutrons over night
|
Plot from Fran showing peak around expected proton energy in both detectors. Top half are strips of detector placed at 180degrees wrt neutron beam, bottom
half 0 degrees. Hence, proton peak from bottom half should be at slightly higher energy.
|
Mon Mar 2 10:39:30 2026, SW, TD, SB, CLW, Detector SetUp. First Configuration 9x
|
The first sample on beam is the NaCl target #4. The shado cone was placed between the LiF target and the chamber.
The shadow cone was a cupper cilinder of 4cm diameter and 30 cm lenght, placed at 0.8 cm from the LiF target and 2.8 cm from the chamber. See
first figure 1. |