AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40 MONNET
  MONNET, Page 2 of 2  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authordown Subject Text Attachments
  20   Mon Mar 2 13:22:52 2026 FG,SB,CLWRun 55
start: 10:14:0531 2.3.26
stop: 12:57:08
2.3.26
blocks: 3855

 

NaCl No. 4
  
  21   Mon Mar 2 13:24:11 2026 FG,SB,CLWRun 56
start: 13:28:38, 2.3.2026
stop:  15:05:22,
2.3.2026
blocks:   2206

LiF
no. 7 in beam
  
  23   Tue Mar 3 08:24:06 2026 FG,SB,CLWRun 57Start: 15:45:30, 2.3. 2026

Stop: 07:57:05 3.3. 2026

Blocks: 25524
  
  24   Tue Mar 3 08:25:45 2026 FG,SB,CLWRun 58
start: 08:24:49, 3.3.2026
stop: 10:13:25
blocks:
3062

Flux monitor

Start: 09:20:43
  
  1   Mon Jan 26 11:29:14 2026 ClaudiaCount rate estimate and particle energiesCount rate estimate for all reaction measurements
planned. 

 kinematics.cneutron_fluxes.xlsx 
  7   Thu Feb 12 12:18:16 2026 CLWpaper   Hanselman-2024-Improved-modeling-of-neutron-induce.pdf 
  16   Mon Mar 2 09:47:13 2026 CLWClock Synchronisation Edinburgh PC , Geel monitor PCT=0: Edinburgh Time 9:39:00

T=1:40: Geel Time 10:37:00

 
  
  17   Mon Mar 2 10:38:42 2026 CLWdetector voltage change before Run 55preamp B detector (DSSSD 2) on 100 V, DSSSD
1 still on 70
  
  26   Wed Mar 4 11:00:57 2026 CLW35Cl(n,p) proton peak, run with 3 MeV neutrons over nightPlot from Fran showing peak around expected
proton energy in both detectors. Top half
are strips of detector placed at 180degrees
 Cl35_Proton_Peak.png 
  18   Mon Mar 2 10:39:30 2026 SW, TD, SB, CLWDetector SetUp. First ConfigurationThe first sample on beam is the NaCl target
#4. The shado cone was placed between the
LiF target and the chamber.
 9x 
ELOG V3.1.3-7933898