| ID |
Date |
Author |
Subject |
Text |
 |
|
20
|
Mon Mar 2 13:22:52 2026 |
FG,SB,CLW | Run 55 |
start: 10:14:0531 2.3.26
stop: 12:57:08
2.3.26
blocks: 3855
NaCl No. 4 |
| |
21
|
Mon Mar 2 13:24:11 2026 |
FG,SB,CLW | Run 56 |
start: 13:28:38, 2.3.2026
stop: 15:05:22,
2.3.2026
blocks: 2206
LiF
no. 7 in beam |
| |
23
|
Tue Mar 3 08:24:06 2026 |
FG,SB,CLW | Run 57 | Start: 15:45:30, 2.3. 2026
Stop: 07:57:05 3.3. 2026
Blocks: 25524 |
| |
24
|
Tue Mar 3 08:25:45 2026 |
FG,SB,CLW | Run 58 |
start: 08:24:49, 3.3.2026
stop: 10:13:25
blocks:
3062
Flux monitor
Start: 09:20:43 |
| |
1
|
Mon Jan 26 11:29:14 2026 |
Claudia | Count rate estimate and particle energies | Count rate estimate for all reaction measurements
planned.
|
 | |
7
|
Thu Feb 12 12:18:16 2026 |
CLW | paper | |
| |
16
|
Mon Mar 2 09:47:13 2026 |
CLW | Clock Synchronisation Edinburgh PC , Geel monitor PC | T=0: Edinburgh Time 9:39:00
T=1:40: Geel Time 10:37:00
|
| |
17
|
Mon Mar 2 10:38:42 2026 |
CLW | detector voltage change before Run 55 | preamp B detector (DSSSD 2) on 100 V, DSSSD
1 still on 70 |
| |
26
|
Wed Mar 4 11:00:57 2026 |
CLW | 35Cl(n,p) proton peak, run with 3 MeV neutrons over night | Plot from Fran showing peak around expected
proton energy in both detectors. Top half
are strips of detector placed at 180degrees |
| |
18
|
Mon Mar 2 10:39:30 2026 |
SW, TD, SB, CLW | Detector SetUp. First Configuration | The first sample on beam is the NaCl target
#4. The shado cone was placed between the
LiF target and the chamber. |
9x |
|