AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nTOFCapture  ELOG logo
Message ID: 28     Entry time: Thu Jun 15 09:57:01 2023
Author: Annie 
Subject: Si Set Up 

Si Set up images and documentation.

Detector 1 - C6D6D: Distance= 9 cm, Angle= 135 deg relative to BL (check set up pdf for drawing if unsure), Voltage= 1550 V

Detector 2 - C6D6E: Distance= 9 cm, Angle= 135 deg relative to BL, Voltage= 1590 V

Detector 3 - C6D6H: Distance= 9 cm, Angle= 135 deg relative to BL, Voltage= 1450 V

Detector 4 - C6D6L: Distance= 9 cm, Angle= 135 deg relative to BL, Voltage= 1460 V

 

Note: Voltages were increased by 30V after the first few runs, these voltages are titled as "new voltages" in the DAQ when they were being tried out, and are now the final voltages.

 

 

Attachment 1: IMG_2101.JPG  3.732 MB  Uploaded Thu Jun 15 11:01:22 2023  | Hide | Hide all
IMG_2101.JPG
Attachment 2: IMG_2103.JPG  3.615 MB  Uploaded Thu Jun 15 11:01:45 2023  | Hide | Hide all
IMG_2103.JPG
Attachment 3: IMG_2109.JPG  4.136 MB  Uploaded Thu Jun 15 11:02:16 2023  | Hide | Hide all
IMG_2109.JPG
Attachment 4: IMG_2114.JPG  3.550 MB  Uploaded Thu Jun 15 11:02:53 2023  | Hide | Hide all
IMG_2114.JPG
Attachment 5: IMG_2116.JPG  3.343 MB  Uploaded Thu Jun 15 11:03:47 2023  | Hide | Hide all
IMG_2116.JPG
Attachment 6: IMG_2122.JPG  3.064 MB  Uploaded Thu Jun 15 11:04:20 2023  | Hide | Hide all
IMG_2122.JPG
Attachment 7: IMG_2122.JPG  3.064 MB  Uploaded Thu Jun 15 11:04:53 2023  | Hide | Hide all
IMG_2122.JPG
Attachment 8: IMG_2131.JPG  3.128 MB  Uploaded Thu Jun 15 11:06:28 2023  | Hide | Hide all
IMG_2131.JPG
Attachment 9: IMG_2132.JPG  3.637 MB  Uploaded Thu Jun 15 11:06:56 2023  | Hide | Hide all
IMG_2132.JPG
Attachment 10: IMG_2124.JPG  3.834 MB  Uploaded Thu Jun 15 11:07:34 2023  | Hide | Hide all
IMG_2124.JPG
Attachment 11: IMG_2120.JPG  2.162 MB  Uploaded Thu Jun 15 11:08:09 2023  | Hide | Hide all
IMG_2120.JPG
Attachment 12: Si_Set_Up_final.pdf  8.999 MB  Uploaded Thu Jun 15 11:08:44 2023  | Hide | Hide all
Si_Set_Up_final.pdf Si_Set_Up_final.pdf Si_Set_Up_final.pdf Si_Set_Up_final.pdf Si_Set_Up_final.pdf Si_Set_Up_final.pdf
ELOG V3.1.4-unknown