AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 2 of 4  ELOG logo
  ID Date Author Subject
  60   Fri Aug 11 16:50:58 2023 Nikolay SosninEDET24

After inserting aluminium target, previously-dead channel 24 on EDET was re-plugged into a 12-bit card SPD02872. It is the only EDET on 12-bit card, the rest are on 14-bit. From pulsers, there appears to be a 90 ns offset from this EDET to others, with EDET24 preceeding the rest. The last channel on 14-bit cards was broken, hence havng to use 12-bit.

  59   Fri Aug 11 13:16:56 2023 Nikolay SosninE Front Incorrect Cabling

E front 2x16-way to 1x34-way IDC cable from the Junction Box to the IDC-Lemo 00 adaptor was found to be inserted upside-down - the 16-way IDC connectors did not have polarisation keys - meaning the E detector p+n junction strip signals collected with 26Al for the first night are not working. Signals from the dE p+n junction strips and E n+n Ohmic strips will be OK. The mistake occurred at the conclusion of the noise tests yesterday - see https://elog.ph.ed.ac.uk/nToF/52

The 2x16-way to 1x34-way IDC cable without polarisation keys has now been replaced.

Run 216417 and onwards have correct cabling. For runs before that, E back and dE are still reliable.

  58   Fri Aug 11 13:06:54 2023 AnnieSignal Spreadsheet info

Spreadhseet made for shifters to manually enter that they have checked each signal and that they can see gamma-flashes. It is saved as "26Al_EAR2_Signal_Checks.ods", it is located on the second monitor on the right of the control room, next to the monitor used to see the beam intensity (same monitor used to see signals).

It will stay open throughout the campeign. Shifters have been told to check signals more than just the once to record that they're okay, and there is a comments box for shifters to add any comments/issues that arises after they have recorde that they have checked the signals at least once.

  57   Fri Aug 11 10:12:02 2023 AnniePressure, voltage and current check
  56   Fri Aug 11 10:02:08 2023 TD, NS, ARNoise
Check RAL108 +/-15V PSU

Measured output voltages +15.21V -15.18V - OK

Observe output voltages with DSO ( ch #1 AC/1M +15V, ch #2 AC/1M -15V ) - see attachments 1 & 2

What we should observe is c. 1mV rms ( white ) noise but we clearly observe similar noise transients ( c. 60us period with HF structure ) to those observed at RAL108 
outputs. The RAL108 preamplifier units do have RC filters on the +/-15V - typically c. 100 Ohm and 4.7uF. Some additional, inline filtering with a lower rolloff 
frequency may be required.

> 
> Observe c. 2mV p to p noise with DSO ( Z_in = 50 Ohm ) c. 60us period with HF structure. DSO connected to junction box via 34-way IDC - 16x Lemo-00 adaptor.
> 
> Origin of noise upstream of 4x34-way to 8x16-way Junction Box. Not microphonics from Edwards RV5 Rotary Pump.
> No change observed with simple ground connections between NIM bin/+/-15V PSU/Junction Box and MSL type W1 preamplifier units/vacuum chamber/support assembly.
> 
> 
> Estimate of electronic noise
> 
> Pulser BNC PB-5
> 
> Amplitude 0.5V
> Attenuation x1
> Decay time 1ms
> Frequency 50Hz
> 
> Preamplifier RAL108
> Output impedance 100 Ohm
> Sensitivity 20mV/MeV ( into high Z load ), 6.7mV/MeV ( into 50 Ohm load ) 
> 
> Amplifier EG&G Ortec 571
> Input terminated by 50 Ohm
> Gain x1 (internal) x 1.0 (fine gain) x 50 (coarse gain ) = 50
> Shaping time 0.5us
> 
> MCA Amptek 8000D
> Input FSR 10V
> 12 bit ADC
> 
> 
> Nominal gain = 6.7mV/MeV x 50 = 335mV/MeV
> 
> 12 bit ADC input FSR = 10V / 0.335V/MeV = 29.85MeV FSR or 7.3keV/channel
> 
> 
> dE p+n junction strip # 4 ( of 0-15 )
> 
> pulser peak centroid = 799.8 ch
> pulser peak width = 7.8 ch FWHM = 57 keV FWHM
> 
> 
> E p+n junction strip # 4 ( of 0-15 )
> 
> pulser peak centroid = 864.8ch
> pulser peak width = 3.5 ch FWHM = 26 keV FWHM
> 
> 
> E n+n Ohmic strip # 4 ( of 0-15 )
> 
> pulser peak centroid = 913.0 ch
> pulser peak width = 5.3 ch FWHM = 39 keV FWHM
> 
> 
> Noise estimates are probably accurate to c. 10% level.
  55   Fri Aug 11 09:17:28 2023 AnnieLi target scans

Processed scans of both sides of the Li target showing the beam spot, and an image showing what it looks like to the eye.

  54   Fri Aug 11 09:11:04 2023 AnniePulse Settings
  53   Fri Aug 11 08:41:31 2023 AnnieAl target & chamber set up

Phtotos of the front & back of the Al target and what it looked like once mounted and in the chamber.

  52   Thu Aug 10 16:11:57 2023 TD, NS, ARNoise
Observe c. 2mV p to p noise with DSO ( Z_in = 50 Ohm ) c. 60us period with HF structure. DSO connected to junction box via 34-way IDC - 16x Lemo-00 adaptor.

Origin of noise upstream of 4x34-way to 8x16-way Junction Box. Not microphonics from Edwards RV5 Rotary Pump.
No change observed with simple ground connections between NIM bin/+/-15V PSU/Junction Box and MSL type W1 preamplifier units/vacuum chamber/support assembly.


Estimate of electronic noise

Pulser BNC PB-5

Amplitude 0.5V
Attenuation x1
Decay time 1ms
Frequency 50Hz

Preamplifier RAL108
Output impedance 100 Ohm
Sensitivity 20mV/MeV ( into high Z load ), 6.7mV/MeV ( into 50 Ohm load ) 

Amplifier EG&G Ortec 571
Input terminated by 50 Ohm
Gain x1 (internal) x 1.0 (fine gain) x 50 (coarse gain ) = 50
Shaping time 0.5us

MCA Amptek 8000D
Input FSR 10V
12 bit ADC


Nominal gain = 6.7mV/MeV x 50 = 335mV/MeV

12 bit ADC input FSR = 10V / 0.335V/MeV = 29.85MeV FSR or 7.3keV/channel


dE p+n junction strip # 4 ( of 0-15 )

pulser peak centroid = 799.8 ch
pulser peak width = 7.8 ch FWHM = 57 keV FWHM


E p+n junction strip # 4 ( of 0-15 )

pulser peak centroid = 864.8ch
pulser peak width = 3.5 ch FWHM = 26 keV FWHM


E n+n Ohmic strip # 4 ( of 0-15 )

pulser peak centroid = 913.0 ch
pulser peak width = 5.3 ch FWHM = 39 keV FWHM


Noise estimates are probably accurate to c. 10% level.
  51   Thu Aug 10 11:30:32 2023 Nikolay SosninSilicons and LiF3+Gafchromic Target
  50   Thu Aug 10 10:50:15 2023 Nikolay SosninAl26 Chamber Cabling/Vacuum/NIM
  49   Thu Aug 10 10:05:48 2023 CLWGafchromics Foil

Gafchromics foil was mounted on empty brass frame back to back with Li sample

Neutron beam goes well through the sample. Centered ~1 cm from sample center. Conclusion: no changes needed (too risky to make it worse and it is ok now)

  48   Thu Aug 10 10:04:13 2023 CLWPhotos inside chamber Al26 run Aug2023
  47   Thu Aug 10 09:55:50 2023 CLWPhotos of Chamber, Al26 Run Aug23
  46   Thu Aug 10 09:20:37 2023 CLWDetector Signal Cabling Al26 Aug 2023
delta E detector Cabling
Lemo Box Output Number Signal Cable Bunker Patch Panel Number Signal Cable Rack Area FADC Number DAQ Channel
0 72 2204803 9 02911 DEED-1
1 73 2204804 10 02911 DEED-2
2 74 2204805 11 02911 DEED-3
3 75 2204806 12 02911 DEED-4
4 76 2204807 13 02914 DEED-5
5 77 2204808 14 02914 DEED-6
6 80 2204809 15 02914 DEED-7
7 81 2204810 16 02914 DEED-8
8 82 2204811 17 02917 DEED-9
9 85 2204812 18 02917 DEED-10
10 86 2204813 19 02917 DEED-11
11 87 2204814 20 02917 DEED-12
12 88 2204815 21 02916 DEED-13
13 90 2204816 22 02916 DEED-14
14 95 2204817 23 02916 DEED-15
15 96 2204818 24 02916 DEED-16
E p side cabling
Lemo Box Output Number Signal Cable Bunker Patch Panel Number Signal Cable Rack Area FADC Number DAQ Channel
0 97 2204819 25 4683 EDET-1
1 101 2204820 26 4683 EDET-2
2 103 2204821 27 4683 EDET-3
3 104 2204822 28 4683 EDET-4
4 105 2204823 29 4684 EDET-5
5 106 2204824 30 4684 EDET-6
6 107 2204825 31 4684 EDET-7
7 108 2204826 32 4684 EDET-8
8 109 2204827 33 4682 EDET-9
9 110 2204828 34 4677 EDET-10
10 111 2204829 35 4682 EDET-11
11 112 2204830 36 4682 EDET-12
12 113 2204831 37 4697 EDET-13
13 114 2204832 38 4697 EDET-14
14 116 2204833 39 4697 EDET-15
15 117 2204834 40 4697 EDET-16
E n side cabling
Lemo Box Output Number Signal Cable Bunker Patch Panel Number Signal Cable Rack Area FADC Number DAQ Channel
0 118 2204835 41 5348? EDET-17
1 119 2204836 42 5348? EDET-18
2 120 2204837 43 5348? EDET-19
3 121 2204838 44 5348? EDET-20
4 123 2204839 45 4677 EDET-21
5 124 2204840 46 4677 EDET-22
6 125 2204841 47 4677 EDET-23
7 126 2204842 48 2872 EDET-24
8 127 2204843 49 4636 EDET-25
9 128 2204844 50 4636 EDET-26
10 129 2204845 51 4636 EDET-27
11 130 2204846 52 4636 EDET-28
12 131 2204847 53 4674 EDET-29
13 132 2204848 54 4674 EDET-30
14 133 2204849 55 4674 EDET-31
15 134 2204850 56 4674 EDET-32

 

  45   Thu Aug 10 09:10:02 2023 CLWDetector Setup Al26 Run 2023

dE Detector: W1-20 3186-9 20 um

E Detector: W1-150 3458-4 144 um

Voltages and Leakage Currents:

dE: 6 V, 0.02 muA

E: 50 V, 0.05 muA

  44   Mon Jul 31 10:21:41 2023 Nikolay Sosninn_TOF Data and Filtering
  43   Thu Jul 27 11:53:52 2023 TDMSL type W1 detector data for 26Al(n,X) experiment EAR2, n_TOF
MSL type W1(SS)-20

3186-9  20um Depletion voltage 3V Operating voltage 6V
3585-12 20um Depletion voltage 2V Operating voltage 4V

MSL type W1(DS)-150

3458-1 157um Depletion voltage 22V Operating voltage 52V
3458-4 144um Depletion voltage 18V Operating voltage 48V
  42   Thu Jul 27 11:25:35 2023 ClaudiaAl-26 planning meeting summary
  • Start 9th August, access to EAR-2 11 am earliest but can start in rack area before
  • Setup to be used: 1 dE (16 strips, 20 um thickness) + 1 E (16x16 strips, 150 um thickness. We have a spare for each thickness
  • Sample and detectors to be mounted on the same flange

Things to check:

  • alignment with beam centre (lasers and/or gafchromics foils)
  • is the setup stable to knockes, can all detector / sample positions be well reproduced when making changes

Once setup us completed:

  • checks with pulser
  • mounf LiF sample number 3 and run with neutron beam
  • check that all strips have signals
  • confirm shape of gamma flash and that short times can be anaysed in both detectors (~1.8 us after flash)

If everything working:

  • measure LiF-3 and the switch to Al-26
  • towards end of the run we can also measure B-3 and the empty brass frame (Frame without mylar)
  • proton statistics: 1E17 LiF-3, 1F17 B-3, ~3E17 Empty, 5.5 E18 Al-26

Travel times

Nick: 8-16, Annie 8-12, Tom, 7 -?, Claudia, 8-10, Emmanuel asap until end of run

Measurement runs until Octover 2nd. Disassembly by Nick and Emmanuel.

additional trips during the measurement as required (if something breaks/fails etc. )

 

Attached: photos of previous setup

 

TO Do: MCA availability at nTOF for quick noise checks (Nick)

            how many  channels in 14 bit, how many 12 bit (Nick)

          depletion voltages   for detectors (Tom)

          Register the eqipment at CERN as Edinburgh property (Claudia)

 

 

  41   Mon Jul 3 13:01:30 2023 EmmanuelBoxes for nTOF experiments to CERN

Box 1

1. RC412 Cables

2. Screws and parts for rails

3. Small rails

 

Box 2

1. Vacuum valves

2. IDC cables

 

Box 3 (Detectors)

1. WI-20

3186-9

2. WI-150

3458-4

3. WI-150

3458-1

 

 

Box 4 (Detector)

1. WI-20

3485-12

*List

 

**We also have the tube for the long rails

 

ELOG V3.1.4-unknown