AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 2 of 4  ELOG logo
ID Dateup Author Subject
  21   Tue Aug 9 15:57:52 2016 SarahLeakage currents 09.08.16

 Morning - 9am

E= 0.03uA
dE= 0.04uA
PHDI= 0.06uA

 

Afternoon - 4.30pm

E=0.03uA
dE= 0.03uA
PHDI=0.05uA
 

  22   Thu Aug 11 08:19:37 2016 SarahLeakage currents 10.8.16

 At lunchtime (12.45)

E = 0.03 uA
dE  = 0.04 uA
PHDI = 0.06 uA

  23   Wed Aug 17 15:10:05 2016 SarahLeakage currents 12.08.16

 E = 0.03uA
dE = 0.04uA
PHDI = 0.06uA

- Monitor PHDI - increasing slowly...

  24   Tue Aug 23 15:34:38 2016 ClaudiaLeakage currents 23.08.16

 E = 0.03uA
dE = 0.04uA
PHDI = 0.09uA

- Monitor PHDI - increasing slowly...

  25   Fri Sep 2 12:01:57 2016 SarahLeakage currents 02.09.16

E 0.03
dE 0.05
PHDI 0.12


Check on PHDI pulser width:
205170 (first in beam run) - 1.1% FWHM (at 8275 ch)
205439 (01/09/16) - 1.0% FWHM (at 8008 ch)

Seems to be holding up OK at present.

  26   Fri Sep 2 12:03:40 2016 SarahSPD card changed

14 bit card replaced for DEED 9-12, to prevent issue with pulser arriving before gamma flash.

  27   Fri Sep 9 10:01:18 2016 SarahLeakage currents 09.09.16

EFED 0.04uA
DEED 0.05uA
PHDI 0.13uA

  28   Thu May 26 09:20:32 2022 Nick / ClaudiaInventory of Items at n_TOF for (n,cp) experiments

Detectors currently in the boxes:

2x MSL type W1(SS)-50, 2902-4 (53um), 2940-6 (55um)

1x MSL type W1(SS)-20 2837-33 (20um)

1x MSL type W1(DS?) 1230-10  (500 or 300 um)

1x MSL type W1(DS)-500 1194-9 (494um)

 

Three aluminium crates contain 26Al(n, alpha) kit from EAR2, and was in the barracks (building 6547) near detector lab by EAR1 entrance. A list is attached and photos can be found on Dropbox:

https://www.dropbox.com/sh/68k1xove2zr1bmj/AADKvN8wR_Ia2EwZMOXZqdMCa?dl=0

Attachment 1: rn_image_picker_lib_temp_e85b2099-7b73-4246-843d-6351800c2709.jpg
rn_image_picker_lib_temp_e85b2099-7b73-4246-843d-6351800c2709.jpg
Attachment 2: rn_image_picker_lib_temp_3ff5f819-1e0c-4278-bbbc-01038a0a0c94.jpg
rn_image_picker_lib_temp_3ff5f819-1e0c-4278-bbbc-01038a0a0c94.jpg
  29   Thu Oct 6 09:28:33 2022 ClaudiaItems to be replaced for next run

Missing/broken items identified

- long rails for fixing chamber on support

- vacuum valve (ours is broken)

- at least 2 lemo - BNC converters

- short M3 screws (photo)

Attachment 1: 20221005_122654.pdf
20221005_122654.pdf
  30   Thu Oct 6 09:34:30 2022 ClaudiaTest setup Photos and cabling

Setup 5.10.22

dE 20 um (ID 2837-33) and 494 um double sided (ID 1194-9)

46 channels (2 connectors missing)

LiF4 in beam 

dE: Big flat cables from preamp 22 and 23 into 1A and 1B

E: from preamp 24+25 go into 2A, 2B and 3A 3B

LEMO converter box: Cable 1: dE

                                   Cable 3: E n+n

                                  unlabeled cable: E p+n

E detector voltage: -133 V, leakage current -0.53 micro-Amp

dE detector voltage -22 V, leakage current -0.03 micro-Amp

For the E detector one of the edge p+n strip bond-wires is suspected broken.

Attachment 1: 20221005_174742.jpg
20221005_174742.jpg
Attachment 2: 20221005_174759.jpg
20221005_174759.jpg
Attachment 3: 20221005_184752.jpg
20221005_184752.jpg
Attachment 4: 20221005_184801.jpg
20221005_184801.jpg
Attachment 5: 20221005_174742.jpg
20221005_174742.jpg
  31   Thu Oct 6 11:07:47 2022 Nikolay SosninChange of sample/Addition of pulser

Changed from LiF 4 to LiF 3 after running with LiF 4 overnight (run title on n_TOF DAQ was not updated to refelect the change, and still says LiF 4, but the material setting of the run states correctly that hte run is with LiF 3).

Added pulser triggered from protons. 12 microsecond delay from protons to gamma-flash + 1.75 microsecond delay from gamma flash to pulser. 20 mV pulser output into 50 ohm impedance (10 mV final output) of both polarities (using two pulsers, one NE pulser and one BNC PB5 pulser). Planning torun with 1.75 microsecond delay for approx. 1 hour, change to 5 microsecond delay.

  32   Thu Oct 6 11:45:39 2022 Nikolay SosninAssembly Setup Days 1 and 2

Photographs of assembly up to the first pulser test with LiF3.

Attachment 1: LiF4_Mounted_On_Trolley_Resize.jpg
LiF4_Mounted_On_Trolley_Resize.jpg
Attachment 2: Mounted_Detectors_Resize.jpg
Mounted_Detectors_Resize.jpg
Attachment 3: Rail_Clamps_Resize.jpg
Rail_Clamps_Resize.jpg
Attachment 4: Target_Holder_Mount_Resize.jpg
Target_Holder_Mount_Resize.jpg
Attachment 5: Vacuum_Side_Resize.jpg
Vacuum_Side_Resize.jpg
Attachment 6: LiF4_Final_Position_Resize.jpg
LiF4_Final_Position_Resize.jpg
Attachment 7: LiF4_In_Chamber_Resize.jpg
LiF4_In_Chamber_Resize.jpg
Attachment 8: LiF4_Mounted_2_Resize.jpg
LiF4_Mounted_2_Resize.jpg
Attachment 9: LiF4_Mounted_Resize.jpg
LiF4_Mounted_Resize.jpg
Attachment 10: Final_Readout_Connection_Both_Resize.jpg
Final_Readout_Connection_Both_Resize.jpg
Attachment 11: Full_Assembly_Resize.jpg
Full_Assembly_Resize.jpg
Attachment 12: Full_Assembly_Target_Holder_View_Resize.jpg
Full_Assembly_Target_Holder_View_Resize.jpg
Attachment 13: LiF3_Final_Position_Resize.jpg
LiF3_Final_Position_Resize.jpg
Attachment 14: LiF3_Holder_Resize.jpg
LiF3_Holder_Resize.jpg
Attachment 15: E_Box_Resize.jpg
E_Box_Resize.jpg
Attachment 16: E_Detector_Resize.jpg
E_Detector_Resize.jpg
Attachment 17: E_Mounted_Resize.jpg
E_Mounted_Resize.jpg
Attachment 18: E_Voltage_Resize.jpg
E_Voltage_Resize.jpg
Attachment 19: dE_Box_Resize.jpg
dE_Box_Resize.jpg
Attachment 20: dE_Detector_Resize.jpg
dE_Detector_Resize.jpg
Attachment 21: dE_Readout_Connection_Resize.jpg
dE_Readout_Connection_Resize.jpg
Attachment 22: dE_Voltage_Resize.jpg
dE_Voltage_Resize.jpg
Attachment 23: Detector_Holder_Mount_Resize.jpg
Detector_Holder_Mount_Resize.jpg
Attachment 24: Central_Chamber_Mounted_Rails_Resize.jpg
Central_Chamber_Mounted_Rails_Resize.jpg
Attachment 25: Chamber_Support_Resize.jpg
Chamber_Support_Resize.jpg
  33   Thu Oct 6 14:58:29 2022 Nikolay SosninChange of Pulser Delay

Still using pulser triggered from protons. 12 microsecond delay from protons to gamma-flash + 1.75 microsecond delay from gamma flash to pulser. 20 mV pulser output into 50 ohm impedance (10 mV final output) of both polarities (using two pulsers, one NE pulser and one BNC PB5 pulser). Changed pulser setting to run with 5 microsecond delay for approx. 1 hour, then change to 10 microsecond delay.

  34   Fri Oct 7 17:17:08 2022 Nikolay SosninChange of Pulser Delay

Still using pulser triggered from protons. 12 microsecond delay from protons to gamma-flash + 11 microsecond delay from gamma flash to pulser. 20 mV pulser output into 50 ohm impedance (10 mV final output) of both polarities (using two pulsers, one NE pulser and one BNC PB5 pulser). Changed pulser setting to run with 11 microsecond delay for approx. 2 hour, then change to an overnight run with pulser running NOT triggered from beam.

  35   Fri Oct 7 20:04:30 2022 Nikolay SosninChange of Pulser Setting

The pulser has been switched from triggering from beam trigger to running at a 10 Hz rate, and will now appear in random places in signal traces. Planned to run overnight measuring LiF3, switch to empty + detector in beam in the morning.

  36   Sat Oct 8 11:56:49 2022 Nikolay SosninSilicon Strips of Concern

DEED 6 and 9 no signal throughout the campaign.

EFED 27 high oscillations in baseline throughout the campaign.

  37   Sat Oct 8 11:57:36 2022 Nikolay SosninChange of Detector-Target Separation

Increased detector-target (LiF 3) separation by 1.5 cm. Had to replace the support strut under the detectors due to the previous one being fuly retracted even for minimal target-detector separation. This change may affect detector rotation relative to the target.

Attachment 1: Positive_Pulser_Resize.jpg
Positive_Pulser_Resize.jpg
Attachment 2: Short_Det_Holder_In_Place_Resize.jpg
Short_Det_Holder_In_Place_Resize.jpg
Attachment 3: Short_Holder_In_Chamber_Resize.jpg
Short_Holder_In_Chamber_Resize.jpg
Attachment 4: Initia_Det_Holder_Config_Resize.jpg
Initia_Det_Holder_Config_Resize.jpg
Attachment 5: Negative_Pulser1_Resize.jpg
Negative_Pulser1_Resize.jpg
Attachment 6: Negative_Pulser2_Resize.jpg
Negative_Pulser2_Resize.jpg
Attachment 7: Negative_Pulser3_Resize.jpg
Negative_Pulser3_Resize.jpg
Attachment 8: Negative_Pulser3_Resize.jpg
Negative_Pulser3_Resize.jpg
Attachment 9: Negative_Pulser4_Resize.jpg
Negative_Pulser4_Resize.jpg
Attachment 10: E_Voltage2_Resize.jpg
E_Voltage2_Resize.jpg
Attachment 11: E_Voltage3_Resize.jpg
E_Voltage3_Resize.jpg
Attachment 12: Initial_dE_LiF3_Distance_Resize.jpg
Initial_dE_LiF3_Distance_Resize.jpg
Attachment 13: Initial_Holder_Back_View_Resize.jpg
Initial_Holder_Back_View_Resize.jpg
Attachment 14: Initial_Holder_Front_View_Resize.jpg
Initial_Holder_Front_View_Resize.jpg
Attachment 15: dE_Voltage2_Resize.jpg
dE_Voltage2_Resize.jpg
Attachment 16: dE_Voltage3_Resize.jpg
dE_Voltage3_Resize.jpg
Attachment 17: Det_Holder_Stand_Replacement_to_Short_Resize.jpg
Det_Holder_Stand_Replacement_to_Short_Resize.jpg
  38   Sun Oct 9 20:57:54 2022 Nikolay SosninDetectors in-beam, no target

After long beam-off, changed detector mount by moving it 2 cm forward into the beam, after removing LiF 3.

Attachment 1: Det_Holder_Default_Position_Resize.jpg
Det_Holder_Default_Position_Resize.jpg
Attachment 2: Detectors_in_Beam_CloseUp_Resize.jpg
Detectors_in_Beam_CloseUp_Resize.jpg
Attachment 3: Detectors_in_Beam_Resize.jpg
Detectors_in_Beam_Resize.jpg
Attachment 4: Voltage_E_InBeam_AfterNeutrons_Resize.jpg
Voltage_E_InBeam_AfterNeutrons_Resize.jpg
Attachment 5: Voltage_E_InBeam_BeforeNeutrons_Resize.jpg
Voltage_E_InBeam_BeforeNeutrons_Resize.jpg
Attachment 6: Mounted_LiF3_Resize.jpg
Mounted_LiF3_Resize.jpg
Attachment 7: Voltage_dE_InBeam_AfterNeutrons_Resize.jpg
Voltage_dE_InBeam_AfterNeutrons_Resize.jpg
Attachment 8: Voltage_dE_InBeam_BeforeNeutrons_Resize.jpg
Voltage_dE_InBeam_BeforeNeutrons_Resize.jpg
Attachment 9: Gamma_Flash_InBeam_1_Resize.jpg
Gamma_Flash_InBeam_1_Resize.jpg
Attachment 10: Gamma_Flash_InBeam_2_Resize.jpg
Gamma_Flash_InBeam_2_Resize.jpg
Attachment 11: LiF3_Mount_Angle_View1_Resize.jpg
LiF3_Mount_Angle_View1_Resize.jpg
Attachment 12: LiF3_Mount_Angle_View2_Resize.jpg
LiF3_Mount_Angle_View2_Resize.jpg
  40   Sun Oct 9 21:07:02 2022 Nikolay SosninBoron Sample 3 Measurement

21:15 Changed from detectors in-beam to boron-10 sample 3 in-beam (in-beam measurement got 1000 triggers, 500 of which were dedicated). The sample was mounted identically to LiF 3. An attempt was made to replace the 20-micron dE detector with a 50-micron one, but the screwholes on the 50-micron detector did not match the 300-micron E-detector ones and therefore could not be mounted. 20-micron detector was therefore re-attached. Planning to run for 12 hours with boron than dismount.

Attachment 1: Voltage_dE4_Resize.jpg
Voltage_dE4_Resize.jpg
Attachment 2: Voltage_E4_Resize.jpg
Voltage_E4_Resize.jpg
Attachment 3: E_dE_Position_Before_Boron_Resize.jpg
E_dE_Position_Before_Boron_Resize.jpg
Attachment 4: E_dE_Position_Boron_Above_Resize.jpg
E_dE_Position_Boron_Above_Resize.jpg
Attachment 5: E_dE_Position_Boron_Back_Resize.jpg
E_dE_Position_Boron_Back_Resize.jpg
Attachment 6: E_dE_Position_Boron_Resize.jpg
E_dE_Position_Boron_Resize.jpg
Attachment 7: Boron_Sample_Rotation_Angle_Resize.jpg
Boron_Sample_Rotation_Angle_Resize.jpg
Attachment 8: Boron_Sample3_Target_View_Resize.jpg
Boron_Sample3_Target_View_Resize.jpg
Attachment 9: Boron_Measurement_Chamber_Interior2_Resize.jpg
Boron_Measurement_Chamber_Interior2_Resize.jpg
Attachment 10: Boron_Mounted_Resize.jpg
Boron_Mounted_Resize.jpg
Attachment 11: Boron_Measurement_Chamber_Interior1_Resize.jpg
Boron_Measurement_Chamber_Interior1_Resize.jpg
Attachment 12: Boron_Sample3_Back_Resize.jpg
Boron_Sample3_Back_Resize.jpg
Attachment 13: Boron_Sample3_Front_Resize.jpg
Boron_Sample3_Front_Resize.jpg
Attachment 14: Boron_Sample3_InBeam_Resize.jpg
Boron_Sample3_InBeam_Resize.jpg
  41   Mon Jul 3 13:01:30 2023 EmmanuelBoxes for nTOF experiments to CERN

Box 1

1. RC412 Cables

2. Screws and parts for rails

3. Small rails

 

Box 2

1. Vacuum valves

2. IDC cables

 

Box 3 (Detectors)

1. WI-20

3186-9

2. WI-150

3458-4

3. WI-150

3458-1

 

 

Box 4 (Detector)

1. WI-20

3485-12

*List

 

**We also have the tube for the long rails

 

ELOG V3.1.4-unknown