AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 3 of 4  ELOG logo
  ID Date Author Subject
  40   Sun Oct 9 21:07:02 2022 Nikolay SosninBoron Sample 3 Measurement

21:15 Changed from detectors in-beam to boron-10 sample 3 in-beam (in-beam measurement got 1000 triggers, 500 of which were dedicated). The sample was mounted identically to LiF 3. An attempt was made to replace the 20-micron dE detector with a 50-micron one, but the screwholes on the 50-micron detector did not match the 300-micron E-detector ones and therefore could not be mounted. 20-micron detector was therefore re-attached. Planning to run for 12 hours with boron than dismount.

  38   Sun Oct 9 20:57:54 2022 Nikolay SosninDetectors in-beam, no target

After long beam-off, changed detector mount by moving it 2 cm forward into the beam, after removing LiF 3.

  37   Sat Oct 8 11:57:36 2022 Nikolay SosninChange of Detector-Target Separation

Increased detector-target (LiF 3) separation by 1.5 cm. Had to replace the support strut under the detectors due to the previous one being fuly retracted even for minimal target-detector separation. This change may affect detector rotation relative to the target.

  36   Sat Oct 8 11:56:49 2022 Nikolay SosninSilicon Strips of Concern

DEED 6 and 9 no signal throughout the campaign.

EFED 27 high oscillations in baseline throughout the campaign.

  35   Fri Oct 7 20:04:30 2022 Nikolay SosninChange of Pulser Setting

The pulser has been switched from triggering from beam trigger to running at a 10 Hz rate, and will now appear in random places in signal traces. Planned to run overnight measuring LiF3, switch to empty + detector in beam in the morning.

  34   Fri Oct 7 17:17:08 2022 Nikolay SosninChange of Pulser Delay

Still using pulser triggered from protons. 12 microsecond delay from protons to gamma-flash + 11 microsecond delay from gamma flash to pulser. 20 mV pulser output into 50 ohm impedance (10 mV final output) of both polarities (using two pulsers, one NE pulser and one BNC PB5 pulser). Changed pulser setting to run with 11 microsecond delay for approx. 2 hour, then change to an overnight run with pulser running NOT triggered from beam.

  33   Thu Oct 6 14:58:29 2022 Nikolay SosninChange of Pulser Delay

Still using pulser triggered from protons. 12 microsecond delay from protons to gamma-flash + 1.75 microsecond delay from gamma flash to pulser. 20 mV pulser output into 50 ohm impedance (10 mV final output) of both polarities (using two pulsers, one NE pulser and one BNC PB5 pulser). Changed pulser setting to run with 5 microsecond delay for approx. 1 hour, then change to 10 microsecond delay.

  32   Thu Oct 6 11:45:39 2022 Nikolay SosninAssembly Setup Days 1 and 2

Photographs of assembly up to the first pulser test with LiF3.

  31   Thu Oct 6 11:07:47 2022 Nikolay SosninChange of sample/Addition of pulser

Changed from LiF 4 to LiF 3 after running with LiF 4 overnight (run title on n_TOF DAQ was not updated to refelect the change, and still says LiF 4, but the material setting of the run states correctly that hte run is with LiF 3).

Added pulser triggered from protons. 12 microsecond delay from protons to gamma-flash + 1.75 microsecond delay from gamma flash to pulser. 20 mV pulser output into 50 ohm impedance (10 mV final output) of both polarities (using two pulsers, one NE pulser and one BNC PB5 pulser). Planning torun with 1.75 microsecond delay for approx. 1 hour, change to 5 microsecond delay.

  30   Thu Oct 6 09:34:30 2022 ClaudiaTest setup Photos and cabling

Setup 5.10.22

dE 20 um (ID 2837-33) and 494 um double sided (ID 1194-9)

46 channels (2 connectors missing)

LiF4 in beam 

dE: Big flat cables from preamp 22 and 23 into 1A and 1B

E: from preamp 24+25 go into 2A, 2B and 3A 3B

LEMO converter box: Cable 1: dE

                                   Cable 3: E n+n

                                  unlabeled cable: E p+n

E detector voltage: -133 V, leakage current -0.53 micro-Amp

dE detector voltage -22 V, leakage current -0.03 micro-Amp

For the E detector one of the edge p+n strip bond-wires is suspected broken.

  29   Thu Oct 6 09:28:33 2022 ClaudiaItems to be replaced for next run

Missing/broken items identified

- long rails for fixing chamber on support

- vacuum valve (ours is broken)

- at least 2 lemo - BNC converters

- short M3 screws (photo)

  28   Thu May 26 09:20:32 2022 Nick / ClaudiaInventory of Items at n_TOF for (n,cp) experiments

Detectors currently in the boxes:

2x MSL type W1(SS)-50, 2902-4 (53um), 2940-6 (55um)

1x MSL type W1(SS)-20 2837-33 (20um)

1x MSL type W1(DS?) 1230-10  (500 or 300 um)

1x MSL type W1(DS)-500 1194-9 (494um)

 

Three aluminium crates contain 26Al(n, alpha) kit from EAR2, and was in the barracks (building 6547) near detector lab by EAR1 entrance. A list is attached and photos can be found on Dropbox:

https://www.dropbox.com/sh/68k1xove2zr1bmj/AADKvN8wR_Ia2EwZMOXZqdMCa?dl=0

  27   Fri Sep 9 10:01:18 2016 SarahLeakage currents 09.09.16

EFED 0.04uA
DEED 0.05uA
PHDI 0.13uA

  26   Fri Sep 2 12:03:40 2016 SarahSPD card changed

14 bit card replaced for DEED 9-12, to prevent issue with pulser arriving before gamma flash.

  25   Fri Sep 2 12:01:57 2016 SarahLeakage currents 02.09.16

E 0.03
dE 0.05
PHDI 0.12


Check on PHDI pulser width:
205170 (first in beam run) - 1.1% FWHM (at 8275 ch)
205439 (01/09/16) - 1.0% FWHM (at 8008 ch)

Seems to be holding up OK at present.

  24   Tue Aug 23 15:34:38 2016 ClaudiaLeakage currents 23.08.16

 E = 0.03uA
dE = 0.04uA
PHDI = 0.09uA

- Monitor PHDI - increasing slowly...

  23   Wed Aug 17 15:10:05 2016 SarahLeakage currents 12.08.16

 E = 0.03uA
dE = 0.04uA
PHDI = 0.06uA

- Monitor PHDI - increasing slowly...

  22   Thu Aug 11 08:19:37 2016 SarahLeakage currents 10.8.16

 At lunchtime (12.45)

E = 0.03 uA
dE  = 0.04 uA
PHDI = 0.06 uA

  21   Tue Aug 9 15:57:52 2016 SarahLeakage currents 09.08.16

 Morning - 9am

E= 0.03uA
dE= 0.04uA
PHDI= 0.06uA

 

Afternoon - 4.30pm

E=0.03uA
dE= 0.03uA
PHDI=0.05uA
 

  20   Mon Aug 8 11:02:13 2016 SarahLeakage currents 08.08.16

 E 0.03 uA
dE 0.04 uA
PHDI 0.05 uA

 

Boron target 1 towards PHDI and Boron target 3 towards dE-E.

Mylar target gluing in electronics lab.

ELOG V3.1.4-unknown