AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 4 of 4  ELOG logo
Entry  Wed Aug 3 09:48:31 2016, Sarah, EFED10 alpha calibration checks 
 

    
        

           
Entry  Tue Aug 2 08:14:26 2016, Sarah, Leakage currents spreadsheet (26/07- 01/08) Leakage_currents.xlsx
 Steady for dE, E. Possibly rising on PHDI- monitor closely.
Entry  Sun Jul 31 15:56:32 2016, Sarah, DEED16 Alpha calibration checks (205169) 
***note that DEED 16 was on old sampling rate for 205168- so use next run, also DEED 9-12 not plugged in***

Entry  Sun Jul 31 15:02:57 2016, Sarah, DEED6 Alpha calibration checks (205168) 
 DEED6: (1 bin = 2 ch)
Pulser (DAQ):
- Centroid = 5145.6(6) ch
Entry  Sun Jul 31 14:32:34 2016, Sarah, DEED1 Alpha calibration checks (205168) 
 DEED1: (rebin x2 -> 1 bin = 4 ch)
Pulser (DAQ):
- Centroid = 5000(1) ch
Entry  Sun Jul 31 13:43:56 2016, Sarah, Alpha spectra DEED0_alpha_spec_pulser.SpeDEED5_alpha_spec_pulser.SpeDEED15_alpha_spec_pulser.SpeEFED9_alpha_spec_pulser.SpePHDI_alpha_spec_pulser.Spe
 Pulser set to 100 pps.
Shaping amp:
Gain: 1x1.0x50
Entry  Thu Jul 28 16:00:43 2016, Sarah, List of to-dos 
Process alpha data
- Compare pulser width and alpha width to calibration spectra (shaping amp with 1us and gain 50x)
- Does photodiode data process OK or is it a problem with the oscillations?
Entry  Wed Jul 27 13:20:53 2016, Sarah, Gafchromic images 6x
 
Entry  Fri Oct 16 16:11:41 2015, Sarah Lonsdale, 09/10/15 Photos of detectors (reversed dE wiring) and upper level frame for future set up, leakage current 2015-10-09_09.16.16.jpg2015-10-09_09.16.22.jpg2015-10-09_09.29.23.jpg2015-10-09_09.29.35.jpg2015-10-09_09.30.02.jpg
 Leakage before take down:
Entry  Fri Oct 16 16:01:41 2015, Sarah Lonsdale, 08/10/15 Removed source and sample, leakage current check 
Removed source and removed Li sample for blank frame test

Entry  Fri Oct 16 15:56:01 2015, Sarah Lonsdale, 07/10/15 Alpha source in, change to pulser delay 6x
Alpha source in - containing 148Gd, 241Am, 239Pu, 244Cm    (4x 1kBq)
Entry  Fri Oct 16 15:41:14 2015, Sarah Lonsdale, 06/10/15 Changes to DAQ and pulser settings 2015-10-06_delay.jpg2015-10-06_trig.jpg
 Pulser out of 5,6,7 EFED- extended to 32ms
Entry  Fri Oct 16 15:36:13 2015, Sarah Lonsdale, 06/10/15 Leakage, dE signal problem solving and external pulser trigger 6x
 Leakage tues am
Entry  Tue Oct 13 21:04:49 2015, Claudia Lederer, Photos of Test Setup 5-10 October 2015 DSC00042.JPGDSC00048.JPGDSC00056.JPGDSC00065.JPG
some photos in high resolution of the test setup 5-10 October 2015
Entry  Mon Oct 12 12:07:24 2015, Sarah Lonsdale, 05/10/15 Changes to DAQ settings 
 Note that detailed DAQ information available from project-ntof.cern.ch erunbook ear2.
As a rough guide: 
Entry  Mon Oct 12 12:04:51 2015, Sarah Lonsdale, 05/10/15 Photo of detector distances and layout 8x
Fairly self explanatory, note that images with time-stamps before 13.08.29 were taken before fitting the o-ring on the flange and therefore lateral positions
will be different to photos after 13.08.29. Individual detector heights were not changed.
Entry  Mon Oct 12 11:50:52 2015, Sarah Lonsdale, 05/10/15 Pulser, Wiring information and DAQ initial set up 2015-10-05_15.19.54.jpg2015-10-05_15.20.24.jpg2015-10-05_15.22.39.jpg2015-10-05_15.22.46.jpg
600mV in 50ohm coax with 25 hz pulser (positive signal) - see 2015-10-05_15.19.54.jpg 
Entry  Mon Oct 12 11:27:02 2015, Sarah Lonsdale, 05/10/15 - Set up notes 8x
 20 micron (see 2015-10-05_12.46.59.jpg
ELOG V3.1.4-unknown